XTENDED POWER ALPHA/BETA
LIVE

Serial Number

79224255

Owner

Nordex Energy SE & Co. KG

Attorney

Elizabeth A. Cominolli

Filing Date

Aug 1, 2017

Add to watchlist:

No watchlists yet
View on USPTO

XTENDED POWER ALPHA/BETA Trademark

Serial Number: 79224255 • Registration: 5609108

XTENDED POWER ALPHA/BETA is a trademark filed by Nordex Energy SE & Co. KG on August 1, 2017. The trademark is classified under Class 7 (Machinery), Class 9 (Computers & Electronics), Class 37 (Building & Construction), Class 42 (Computer & Scientific). The application is currently registered and active.

Owner Contact Info

Nordex Energy SE & Co. KG (6 trademarks)

Langenhorner Chaussee 600

Entity Type: 99

NORDEX ENERGY GmbH (6 trademarks)

Langenhorner Chaussee 600

Entity Type: 99

Trademark Details

Filing Date

August 1, 2017

Registration Date

November 20, 2018

Published for Opposition

September 4, 2018

Cancellation Date

June 6, 2025

Goods & Services

Machines and installations composed thereof for renewable energy generation, in particular wind power installations, windmills; towers, rotor blades, machine housings and rotors being structural parts of wind energy installations; current generators, emergency power generators, standby electricity generators, alternators; structural parts for wind energy installations

Installation, assembly, maintenance and repair of wind energy installations and parts therefor; installation, assembling, maintenance and repair of data processing apparatus, computer hardware and measuring equipment; installation, assembly, maintenance and repair of wind farms

Checking apparatus and instruments, namely, computers; apparatus and instruments for conducting, distributing, transforming, accumulating, regulating or controlling electricity, namely, electric conductors, electric transformers, electric accumulators, voltage regulators; apparatus and instruments for regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; pre-recorded magnetic data carriers featuring information on wind energy; calculating machines, data processing equipment and computers; computer operating software; electric control devices for wind energy installations and wind farms, programs being software for controlling wind energy installations and wind farms; electrical contractors being fuses, in particular for protection against voltage surge, excess current, fault current, short circuits; electric monitors for monitoring electric current and electrical signals, electric converters, electric switches, electric commutators for commutation, integrated circuits, electricity distribution consoles, integrated circuit chips for controlling wind energy installations and wind farms; electrical circuitry, electrical frequency converters, electric sensors, electric sensors for measuring meteorological parameters; anemometers, pressure measuring apparatus, remote controls for wind energy installations, interfaces for computers, voltmeters, ammeters, electricity transformers, processors being central processing units

Scientific research; technological research and design for others in the field of wind energy technology; industrial research in the field of wind energy; design and development of computer hardware and software; technical consultancy in the field of generation of alternative ecological energy, technical configuration of energy networks, namely, computer network configuration services; technical development of energy networks, technical planning, for others, in connection with the operation of computer system installations for the supply of electricity, heat, water and cold; configuring computer networks by means of software; creation, maintenance and updating of computer programs; design and creation of Internet pages; consultancy in the field of energy-saving, namely, consulting services in the fields of energy measurement to improve energy efficiency; technical consultancy, namely, engineering services with regard to the operation and management of wind farms, technical consultancy, namely, engineering services for operators of wind energy installations; scientific research relating to wind energy installations and parts therefor; technical development and technical checking as inspection of wind energy installations and parts therefor; development of programs as software for controlling wind energy installations and wind farms, engineering services, technical research in the field of wind energy technology; installation, maintenance and repair of computer software

Filing History

TOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Feb 6, 2026 INTR
CANCELLED SECTION 71
Jun 6, 2025 C71T
NEW REPRESENTATIVE AT IB RECEIVED
Apr 11, 2025 NREP
COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Nov 20, 2023 REM3
CHANGE OF NAME/ADDRESS REC'D FROM IB
May 9, 2021 ADCH
FINAL DECISION TRANSACTION PROCESSED BY IB
Mar 22, 2019 FINO
FINAL DISPOSITION NOTICE SENT TO IB
Mar 4, 2019 FICS
FINAL DISPOSITION PROCESSED
Mar 4, 2019 FIMP
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Feb 20, 2019 FICR
REGISTERED-PRINCIPAL REGISTER
Nov 20, 2018 R.PR
NOTIFICATION PROCESSED BY IB
Oct 19, 2018 GPNX
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Sep 4, 2018 NPUB
PUBLISHED FOR OPPOSITION
Sep 4, 2018 PUBO
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Aug 15, 2018 OPNS
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Aug 15, 2018 OP2R
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Aug 15, 2018 NONP
APPROVED FOR PUB - PRINCIPAL REGISTER
Jul 25, 2018 CNSA
EXAMINER'S AMENDMENT ENTERED
Jul 24, 2018 XAEC
NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Jul 24, 2018 GNEN
EXAMINERS AMENDMENT E-MAILED
Jul 24, 2018 GNEA
EXAMINERS AMENDMENT -WRITTEN
Jul 24, 2018 CNEA
TEAS/EMAIL CORRESPONDENCE ENTERED
Jul 21, 2018 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 20, 2018 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Jul 20, 2018 TROA
REFUSAL PROCESSED BY IB
Feb 10, 2018 RFNT
CORRECTION SENT TO IB
Feb 6, 2018 CRSN
CORRECTION CREATED FOR IB
Feb 6, 2018 CRCR
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jan 24, 2018 RFCS
REFUSAL PROCESSED BY MPU
Jan 24, 2018 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jan 17, 2018 RFCR
NON-FINAL ACTION WRITTEN
Jan 16, 2018 CNRT
APPLICATION FILING RECEIPT MAILED
Jan 13, 2018 MAFR
ASSIGNED TO EXAMINER
Jan 9, 2018 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jan 9, 2018 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Jan 4, 2018 REPR