WEDI PRELINE
LIVE

Serial Number

79284382

Owner

WEDI GMBH

Attorney

Laurence P. Colton

Filing Date

Jan 28, 2020

Add to watchlist:

No watchlists yet
View on USPTO

WEDI PRELINE Trademark

Serial Number: 79284382 • Registration: 6230883

WEDI PRELINE is a trademark filed by WEDI GMBH on January 28, 2020. The trademark is classified under Class 11 (Environmental Control), Class 17 (Rubber Goods), Class 19 (Building Materials). The application is currently registered and active.

Owner Contact Info

WEDI GMBH (69 trademarks)

KOLPINGSTRASSE 52-54
EMSDETTEN 48282 , DE

Entity Type: 03

Trademark Details

Filing Date

January 28, 2020

Registration Date

December 29, 2020

Published for Opposition

October 13, 2020

Goods & Services

Building materials and building elements, not of metal, namely, wall panels; structural panels, not of metal, namely, floor panels of extruded polystyrene rigid foam, and wall panels of extruded polystyrene rigid foam; structural panels not of metal, namely, floor panels of extruded polystyrene rigid foam and wall panels of extruded polystyrene rigid foam with, in particular, pre-milled or moulded grooves for accommodating pipes for hot water heating systems; wall partitions, not of metal, namely, wall panels

Insulation and barrier articles, namely, building insulation and sound damping barrier panels in the nature of thermal, moisture and accoustical insulation barrier panels for use in building construction; damping and barrier materials for building construction, namely, foam insulation panels for building and construction; and sound proofing and insulation materials, namely, extruded polystyrene rigid foam used on walls, ceilings, floors, and furniture for soundproofing, moisture barrier, and insulation purposes

Sanitary installations, namely, steam rooms and bath installations; sanitary fixtures namely, shower trays, shower bases, shower surrounds, and shower enclosures; water supply installations, namely, faucets and shower faucet extensions; bath fittings namely, plumbing fittings in the nature of tub control valves, steam valves, and faucets; bath installations; bathtub enclosures; bath screens; showers; shower baths, namely bath tubs; shower doors; shower trays; shower pans, namely shower bases; shower cubicles; walls for shower cubicles, namely, component parts of shower cubicles in the nature of shower walls; walls for shower cubicles, namely, shower panels; shower installations, namely, shower platforms, shower enclosures, and shower panels; shower screens; bath installations, namely, steam baths; saunas; bath installations, namely, spa baths; sanitary fittings, namely, plumbing fittings in the nature of tub control valves, steam valves, and faucets

Filing History

COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Dec 29, 2025 REM3
NEW REPRESENTATIVE AT IB RECEIVED
Jan 19, 2024 NREP
FINAL DECISION TRANSACTION PROCESSED BY IB
Apr 24, 2021 FINO
FINAL DISPOSITION NOTICE SENT TO IB
Apr 6, 2021 FICS
FINAL DISPOSITION PROCESSED
Apr 6, 2021 FIMP
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Mar 29, 2021 FICR
NOTIFICATION PROCESSED BY IB
Feb 14, 2021 GPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jan 27, 2021 OPNS
REGISTERED-PRINCIPAL REGISTER
Dec 29, 2020 R.PR
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Oct 13, 2020 NPUB
PUBLISHED FOR OPPOSITION
Oct 13, 2020 PUBO
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Sep 30, 2020 OP2R
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Sep 23, 2020 NONP
APPROVED FOR PUB - PRINCIPAL REGISTER
Sep 10, 2020 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Aug 21, 2020 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 21, 2020 CRFA
TEAS REQUEST FOR RECONSIDERATION RECEIVED
Aug 21, 2020 ERFR
NOTIFICATION OF FINAL REFUSAL EMAILED
Aug 17, 2020 GNFN
FINAL REFUSAL E-MAILED
Aug 17, 2020 GNFR
FINAL REFUSAL WRITTEN
Aug 17, 2020 CNFR
TEAS/EMAIL CORRESPONDENCE ENTERED
Jul 23, 2020 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 23, 2020 CRFA
ASSIGNED TO LIE
Jul 14, 2020 ALIE
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Jul 2, 2020 TROA
CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED
Jun 12, 2020 CORR
REFUSAL PROCESSED BY IB
Jun 5, 2020 RFNT
CORRECTION TRANSACTION RECEIVED FROM IB
Jun 5, 2020 CRCV
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
May 14, 2020 RFCS
REFUSAL PROCESSED BY MPU
May 14, 2020 RFRR
APPLICATION FILING RECEIPT MAILED
May 5, 2020 MAFR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
May 4, 2020 RFCR
NON-FINAL ACTION WRITTEN
May 3, 2020 CNRT
ASSIGNED TO EXAMINER
May 1, 2020 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
May 1, 2020 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Apr 30, 2020 REPR