V'COOL
LIVE

Serial Number

79429657

Owner

Prodeval

Attorney

Ronald M. Kachmarik

Filing Date

Mar 28, 2025

Add to watchlist:

No watchlists yet
View on USPTO

V'COOL Trademark

Serial Number: 79429657

V'COOL is a trademark filed by Prodeval on March 28, 2025. The trademark is classified under Class 7 (Machinery), Class 11 (Environmental Control). The application is currently pending registration.

Owner Contact Info

Prodeval

7 RUE ANNE MARIE STAUB,

Entity Type: 99

Trademark Details

Filing Date

March 28, 2025

Registration Date

Not Registered

Goods & Services

Machines for liquefying, cooling and compressing gases, namely, machines to liquefy, cool and compress carbon dioxide; gas filtering machines, namely, gas centrifuges and industrial gas filtration machines; machines for production, processing, storage, conditioning, distribution and supply of gas, biogas and liquefied gases, namely, machines for generating gas, gas centrifuges, wind turbines used in gas production or gas supply systems, and solar-powered electricity generators used in gas production or gas supply systems; pressure regulators for gas installations; pressure regulators being parts of machines for controlling gas pressure and flow

Apparatus and instruments for producing, storing, packaging and distributing heat from renewable sources comprising biogas, biomass, biofuels, photovoltaic solar energy, wind energy, namely, namely, heat recovery units, heat accumulators, heat generators, heat pumps for energy processing, combustion plants for biofuels, wood combustion plants, gas scrubbers being parts of gas plants, gas cooling plants, gas scrubbers and purifiers, gas heat generators, gas collection plants, gas drying devices, gas purification separators, gas cleaning separators, flue gas cleaning devices, gas flaring plants, gas filters for domestic and industrial installations, regulating and safety accessories for gas appliances and gas pipes, pressure regulators for gas installations, appliances and instruments for gas flow control, washing columns for gas purification, waste purification installations, heating appliances for waste treatment, appliances and instruments for drying and purifying biogas; combustion installations being combustion chambers for biofuels; gas scrubbers being parts of gas installations; cooling and drying installations for gases; gas cleaners and purifiers, namely, gas scrubbers, gas filtration units and gas purification installations; gas generators, namely, heat generators; gas collection installations, namely, gas separators, gas filtration units, and gas purification installations; gas drying devices, namely, biogas dehumidification units, gas dehydration apparatus, and heat exchangers not being parts of machines; apparatus for purification of combustion gases; filters for gases for gas conditioning in household or industrial installations; adjustment and safety accessories for gas apparatus and gas pipes, namely, gas pressure regulators, safety valves, gas flow control valves, and non-return valves for gas pipes; temperature regulators for gas installations; washing columns for gas purification being gas purification machines; waste purification installations, namely, gas scrubbers, gas filtration units, and gas purification installations; heating apparatus for waste treatment, namely, gas scrubbers and purification apparatus containing heating elements; apparatus and instruments for drying and purifying biogas

Filing History

NOTIFICATION OF FINAL REFUSAL EMAILED
Apr 27, 2026 GNFN
FINAL REFUSAL E-MAILED
Apr 27, 2026 GNFR
FINAL REFUSAL WRITTEN
Apr 27, 2026 CNFR
TEAS/EMAIL CORRESPONDENCE ENTERED
Apr 9, 2026 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 9, 2026 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Apr 9, 2026 TROA
REFUSAL PROCESSED BY IB
Nov 7, 2025 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Oct 18, 2025 RFCS
REFUSAL PROCESSED BY MPU
Oct 18, 2025 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Sep 3, 2025 RFCR
NON-FINAL ACTION WRITTEN
Sep 2, 2025 CNRT
ASSIGNED TO EXAMINER
Aug 26, 2025 DOCK
APPLICATION FILING RECEIPT MAILED
Aug 14, 2025 MAFR
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Aug 14, 2025 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Aug 7, 2025 REPR