ULTRAPANEL
LIVE

Serial Number

79404791

Owner

Ultraframe (UK) Limited

Attorney

Kevin M. Bovard

Filing Date

Feb 14, 2024

Add to watchlist:

No watchlists yet
View on USPTO

ULTRAPANEL Trademark

Serial Number: 79404791

ULTRAPANEL is a trademark filed by Ultraframe (UK) Limited on February 14, 2024. The trademark is classified under Class 6 (Metal Goods), Class 17 (Rubber Goods), Class 19 (Building Materials). The application is currently pending registration.

Owner Contact Info

Ultraframe (UK) Limited (23 trademarks)

Enterprise Works, Salthill Road
Clitheroe, Lancashire BB7 1PE , GB

Entity Type: 11

Trademark Details

Filing Date

February 14, 2024

Registration Date

Not Registered

Goods & Services

Building materials and elements, not of metal, namely panels for building, roofing and construction; building panels not of metal; roofing, not of metal; non-metallic roofing elements being panels for use in roofing and building materials namely roofing panels; multi-layered insulating glass units for glazing buildings; glazing materials and components namely glass for building; plastics building elements and panels namely plastic wall panels, plastic flooring panels, plastic roofing panels; non-metal windows, non-metal window frames, non-metal doors, non-metal door frames, translucent building elements being glass for building and panels of plastics being plastic roofing panels and roofs made therefrom being non-metal roofing coverings, translucent roofing materials being non-metal roofing panels; panels for structural purposes, being construction, building, and roofing materials in the nature of non-metal panels; structural panels for use in the construction of buildings, walls, and floors namely non-metal ceiling panels, non-metal wall panels, non-metal roofing panels, and non-metal flooring panels; structural panels, namely building panels not of metal; structural building panels; structural replacement parts and non-metal fittings for all the aforesaid goods.

Building materials and elements, namely metal panels for building, roofing and construction; structural elements, namely structural panels of metal; panels; metal roofing; roofing elements being metal panels for use in roofing and building materials for use in roofs, being metal roofing panels; metal windows; metal window frames; metal doors; metal door frames; panels for structural purposes, namely building panels of metal; structural panels for use in the construction of buildings, walls, and floors, namely metal ceiling panels, metal wall panels, metal roofing panels, metal flooring panels; structural panels, namely building panels of metal; structural building panels of metal; structural replacement parts and metal fittings for all the aforesaid goods.

Composite panels having insulating properties, namely structural insulated panels for building, roofing, and construction; fire resistant insulate panels being; unprocessed and semi-processed rubber, gutta-percha, gum, asbestos, mica; plastics and artificial resins in extruded form for use in manufacture; packing materials of rubber or plastics and insulating materials; insulating panels; flexible pipes, tubes and hoses, not of metal.

Filing History

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
May 13, 2026 RCSC
NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Mar 5, 2026 OPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Feb 18, 2026 OPNS
NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Feb 18, 2026 OPNR
REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Oct 26, 2025 RCSC
NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Apr 25, 2025 GNS3
LETTER OF SUSPENSION E-MAILED
Apr 25, 2025 GNSL
SUSPENSION LETTER WRITTEN
Apr 25, 2025 CNSL
TEAS/EMAIL CORRESPONDENCE ENTERED
Mar 25, 2025 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 25, 2025 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Mar 25, 2025 TROA
REFUSAL PROCESSED BY IB
Oct 19, 2024 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Sep 27, 2024 RFCS
REFUSAL PROCESSED BY MPU
Sep 27, 2024 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Sep 24, 2024 RFCR
NON-FINAL ACTION WRITTEN
Sep 23, 2024 CNRT
ASSIGNED TO EXAMINER
Sep 21, 2024 DOCK
APPLICATION FILING RECEIPT MAILED
Sep 20, 2024 MAFR
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Sep 20, 2024 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Sep 19, 2024 REPR