Serial #86654801
LIVE

Serial Number

86654801

Owner

Patterson-UTI Energy, Inc.

Attorney

Scott S. Havlick

Filing Date

Jun 8, 2015

Add to watchlist:

No watchlists yet
View on USPTO

Serial #86654801 Trademark

Serial Number: 86654801 • Registration: 5661743

Serial #86654801 is a trademark filed by Patterson-UTI Energy, Inc. on June 8, 2015. The trademark is classified under Class 6 (Metal Goods), Class 7 (Machinery), Class 9 (Computers & Electronics), Class 12 (Vehicles), Class 37 (Building & Construction), Class 40 (Treatment & Processing). The application is currently registered and active.

Owner Contact Info

Patterson-UTI Energy, Inc. (53 trademarks)

10713 W. Sam Houston Parkway North
Houston, TX 77064

Entity Type: 03

Trademark Details

Filing Date

June 8, 2015

Registration Date

January 22, 2019

Published for Opposition

September 19, 2017

Goods & Services

Oil and gas well treatment services; oil and gas production services

Information systems comprising computer hardware, computer software, and electronic controls and alarms used to monitor, display, relay, and archive drilling information and to control the functions, processes, and operations of oil and gas drilling rig equipment

Oil and gas drilling rigs; power-operated drilling rigs; electric drilling rigs; mechanical drilling rigs; drilling rig equipment, namely, top drives in the nature of a machine used to hoise, lower, and rotate drill pipe, electric power drills, [ power drill bits, ] automatic catwalks in the nature of a machine that delivers drill pipe or casing to or from the rig floor and ground level, winches, drawworks, shale shakers, mud pumps and systems for use in oil and gas drilling, and structural parts therefor, namely, motors and masts; walking systems for oil and gas drilling rigs composed of hydraulic jacks, hydraulic pumps, hydraulic lift tables, hydraulic linear actuators, hydraulic power units, and hydraulic valve actuators and machine parts in the nature of bearings used to lift and move a drilling rig [ ; equipment used in oil and gas well improvement and/or completion services and oil or gas well hydraulic fracturing operations, namely, trailer mounted and body load high-pressure frac pumps, trailer mounted and body load blenders; high-pressure pumps used in oil and gas well services ]

Metal goods, namely, parts and associated modules for oil and gas well drilling rigs, namely, platform drilling rig enclosures [ , metal drill pipes for use in well boring, drill pipe attachments, namely, metal drill collars, metal liners, and casings for use in wells and boreholes, and metal bolts and beams; metal hoses for use in the oil and gas well hydraulic fracturing industry; iron pipes; metal storage bins for cement; sand storage/conveyance equipment, namely, mobile metal storage bins with integrated conveyor belts used to deliver sand in hydraulic fracturing operations; iron manifold equipment, namely, manifolds of metal used to deliver hydraulic fracturing fluid from pump trucks to oil and gas wells ]

Contract well drilling services for oil and gas; drilling of oil and gas wells; oil and gas extraction; leasing of oil and gas drilling rigs; oil and gas pumping and extraction, in the nature of well production, completion, improvement, enhancement, and stimulation services; hydraulic fracturing of oil and gas wells; oil and gas well pressure pumping services; oilfield services, namely, cementing well casing strings as part of the well construction process, hydraulic fracturing and acidizing of target geologic formations to enhance production of the well; oil and gas reservoir enhancement services, namely, hydraulic fracturing of subsurface geologic formations to enhance well production; cementing services for oil and gas wells; oil and gas well enhancing services, namely, the injection of nitrogen and acid to oil and gas wells to increase the oil and gas recovery; remedial work on oil and gas wells, namely, re-hydraulic fracturing and re-cementing services

Land vehicles and trailers used to take apart, transport, and set up drilling rigs, oilfield equipment, pressure pumping equipment, and well services equipment; Equipment used in oil and gas well improvement and completion services and in oil and gas well hydraulic fracturing operations, namely, trailers having integrated high-pressure pumps for use in oil and gas well hydraulic fracturing, trailers having integrated blenders for use in oil and gas well hydraulic fracturing, trucks for hauling sand and pipes, and vans and trucks having integrated communications and other command-and-control equipment, and cement pump trucks and trailers; trucks used to transport iron; acid and chemical additive transport and storage equipment, namely, trailers used to transport and pump chemicals into oil and gas wells

Filing History

NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
May 12, 2025 NA85
REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
May 12, 2025 C15A
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
May 12, 2025 APRE
TEAS SECTION 8 & 15 RECEIVED
Jan 17, 2025 E815
COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Jan 22, 2024 REM1
REGISTERED-PRINCIPAL REGISTER
Jan 22, 2019 R.PR
NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
Dec 18, 2018 SUNA
ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
Dec 17, 2018 CNPR
NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Nov 15, 2018 EXRA
STATEMENT OF USE PROCESSING COMPLETE
Nov 14, 2018 SUPC
SOU EXTENSION 2 GRANTED
Nov 14, 2018 EX2G
CASE ASSIGNED TO INTENT TO USE PARALEGAL
Nov 14, 2018 AITU
USE AMENDMENT FILED
Nov 9, 2018 IUAF
SOU EXTENSION 2 FILED
Nov 9, 2018 EXT2
SOU TEAS EXTENSION RECEIVED
Nov 9, 2018 EEXT
TEAS STATEMENT OF USE RECEIVED
Nov 9, 2018 EISU
NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
May 15, 2018 EXRA
SOU EXTENSION 1 GRANTED
May 11, 2018 EX1G
SOU EXTENSION 1 FILED
May 11, 2018 EXT1
SOU TEAS EXTENSION RECEIVED
May 11, 2018 EEXT
NOA E-MAILED - SOU REQUIRED FROM APPLICANT
Nov 14, 2017 NOAM
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Sep 19, 2017 NPUB
PUBLISHED FOR OPPOSITION
Sep 19, 2017 PUBO
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Aug 30, 2017 NONP
LAW OFFICE PUBLICATION REVIEW COMPLETED
Aug 17, 2017 PREV
APPROVED FOR PUB - PRINCIPAL REGISTER
Aug 14, 2017 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Aug 12, 2017 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 11, 2017 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Aug 11, 2017 TROA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
Mar 14, 2017 GNRN
NON-FINAL ACTION E-MAILED
Mar 14, 2017 GNRT
NON-FINAL ACTION WRITTEN
Mar 14, 2017 CNRT
PREVIOUS ALLOWANCE COUNT WITHDRAWN
Feb 15, 2017 ZZZX
WITHDRAWN FROM PUB - OG REVIEW QUERY
Feb 14, 2017 PBCR
LAW OFFICE PUBLICATION REVIEW COMPLETED
Jan 30, 2017 PREV
ASSIGNED TO LIE
Jan 30, 2017 ALIE
APPROVED FOR PUB - PRINCIPAL REGISTER
Jan 9, 2017 CNSA
ALLOWANCE WITHDRAWN-INADVERTENTLY ISSUED ACTION
Dec 15, 2016 ZZBX
APPROVED FOR PUB - PRINCIPAL REGISTER
Dec 15, 2016 CNSA
EXAMINER'S AMENDMENT ENTERED
Dec 15, 2016 XAEC
NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Dec 15, 2016 GNEN
EXAMINERS AMENDMENT E-MAILED
Dec 15, 2016 GNEA
EXAMINERS AMENDMENT -WRITTEN
Dec 15, 2016 CNEA
APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Nov 23, 2016 CHAN
TEAS CHANGE OF OWNER ADDRESS RECEIVED
Nov 23, 2016 COAR
TEAS REQUEST FOR RECONSIDERATION RECEIVED
Nov 17, 2016 ERFR
NOTIFICATION OF FINAL REFUSAL EMAILED
May 19, 2016 GNFN
FINAL REFUSAL E-MAILED
May 19, 2016 GNFR
FINAL REFUSAL WRITTEN
May 19, 2016 CNFR
ASSIGNED TO EXAMINER
Apr 19, 2016 DOCK
TEAS/EMAIL CORRESPONDENCE ENTERED
Mar 24, 2016 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 23, 2016 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Mar 23, 2016 TROA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
Sep 25, 2015 GNRN
NON-FINAL ACTION E-MAILED
Sep 25, 2015 GNRT
NON-FINAL ACTION WRITTEN
Sep 25, 2015 CNRT
ASSIGNED TO EXAMINER
Sep 17, 2015 DOCK
NOTICE OF DESIGN SEARCH CODE E-MAILED
Jun 12, 2015 MDSC
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jun 11, 2015 NWOS
NEW APPLICATION ENTERED
Jun 11, 2015 NWAP