Serial #78735872
LIVE

Serial Number

78735872

Owner

DAYTON SUPERIOR DELAWARE CORPORATION

Attorney

Roger H. Bora

Filing Date

Oct 19, 2005

Add to watchlist:

No watchlists yet
View on USPTO

Serial #78735872 Trademark

Serial Number: 78735872 • Registration: 3902152

Serial #78735872 is a trademark filed by DAYTON SUPERIOR DELAWARE CORPORATION on October 19, 2005. The trademark is classified under Class 1 (Chemicals), Class 2 (Paints), Class 3 (Cosmetics & Cleaning), Class 6 (Metal Goods), Class 7 (Machinery), Class 8 (Hand Tools), Class 9 (Computers & Electronics), Class 42 (Computer & Scientific), Class 17 (Rubber Goods), Class 19 (Building Materials). The application is currently registered and active.

Owner Contact Info

DAYTON SUPERIOR DELAWARE CORPORATION (79 trademarks)

7777 WASHINGTON VILLAGE DRIVE
DAYTON, OH 45459

Entity Type: 03

DAYTON SUPERIOR CORPORATION (143 trademarks)

1125 BYERS ROAD
MIAMISBURG, OH 45342

Entity Type: 03

Trademark Details

Filing Date

October 19, 2005

Registration Date

January 4, 2011

Published for Opposition

August 7, 2007

Goods & Services

Safety markers in the nature of caps positioned on otherwise exposed concrete for use by construction workers

[Hand-operated tools, namely, pincers for pulling metal stakes from the ground; and hand-operated scaffold lifting jacks for elevating and retaining concrete forms for use by construction workers]

Non-shrink grout; patching cements, namely, filling cements; flooring underlayments; polymer-modified, cementious, two-compound concrete repair mortar; cement-based patching compound for airport and highway asphalt and concrete pavement repair in the nature of filling cement; cementitious products, namely, grouts and patching cements in the nature of filling cements; highway paving materials in the nature of concrete-based, cement based, tar based, asphalt based or bitumen based expansion joint fillers for pavement and, grouts; highway paving materials in the nature of concrete-based, cement based patching compound; non-metal construction components in the nature of casting forms and parts for use therewith for forming concrete structures, namely, waler brackets, waler clamps, inside corner brackets, beam and footing clips, panel clips, expansion and contraction joints for floors and walls; non-metal casting forms for concrete, namely, space wheels for positioning concrete reinforcing bars for use by construction workers; structural grout, namely, grout for equipment bases, column bases, pre-cast walls, tilt-up panels and tie holes; construction elements not made of metal used for positioning concrete and concrete reinforcements, namely, molded plastic supports, spacer brackets, and plastic support pads; building and construction materials, namely, plastic brackets for use in constructing concrete step forms; molded plastic pedestals for supporting reinforcement rods in poured concrete; underlayments used to level wood or concrete floors; concrete blocks, namely, dobies for positioning concrete reinforcing bars for use by construction workers

[Power operated scaffold lift jacks for elevating and retaining concrete forms for use by construction workers; and metal couplings for machines, namely, metal couplings for use with cranes or hoists to lift concrete forms]

Metal concrete construction hardware and concrete forming accessories, namely, anchors, he and she bolts, metal casting forms for concrete in the nature of stakes for screeds, screed keys, and speed brackets; metal concrete construction hardware, namely, screed chair brackets for holding concrete construction surfaces; metal connecting and lifting construction hardware for concrete slabs and other cast products, namely, insertable anchors and bolts, ferrule, cast and lift inserts in the nature of anchors, ground release latches for tilt-up hardware, hangers and hanger inserts for support of pipe and conduit, hinges, joint seals, lifting bolster supports and eyebolt inserts; [ wire mesh; metal reinforcing strapping and anchors for construction planks;] strongbacks in the nature of channeled metal beams for lifting formed concrete; metal bolts for construction use; metal beams, decking and guard rails; metal concrete casting forms in the nature of bridging, cast inserts, cones, dowel baskets and caps, coil frames, rod loop frames, flat frames, snap-in frames, void tubes and wedges; metal structural hardware for use in holding and securing metal concrete casting forms during concrete construction, namely, braces, brackets, clamps, clips, threaded coil rods, column clamps, and pipe couplings, eye bolts and nuts, form aligners in the nature of turnbuckles, metal strapping or tie-downs, spacer brackets, threaded stud bolts, and wall reinforcing brackets and washers; metal concrete construction hardware in the nature of round form patch covers used to cover holes in concrete caused when lifting inserts are removed; metal concrete construction hardware, namely, strand chucks for use as a reinforcement to create pre-stressed concrete, and hollow and non-hollow steel bars in the nature of waler corner connectors for joining together concrete forms for use by construction workers; metal threaded fasteners, namely, tie rod connectors for joining together adjacent rods for use by construction workers; tie rod connectors, namely, metal fasteners in the nature of bolt and wedge pins for joining together adjacent rods for use by construction workers; metal caps for capping ends of steel bars protruding from concrete; concrete forming systems comprised of steel panels and associated metal hardware in the form of tie rods, she-bolts, j-bolts, cast bearing washers, channel-type waler brackets, quick connecting bolts, walk-way brackets, fabricated braces, and inside and outside corner braces

Plastic or elastomeric sheeting for use in the construction industry as concrete form liners, vapor barriers and water-stops

Concrete form cleaners; elastomeric form liner cleaner; cleaners and paint strippers for removing graffiti from concrete; and finishing aids in the nature of concrete floor finishing preparations

Concrete moisture barrier coating; sealer coatings for use in concrete applications; clear and pigmented coatings for use on concrete in the nature water repellant paints; clear graffiti preventative sealer coating for use on concrete; epoxy coating for use on concrete; preservative coatings for masonry and concrete applications; and concrete moisture barrier coating, namely, waterproof coating for use on concrete

Chemicals for concrete construction, namely, concrete form release agents, cure and bond breakers, concrete curing and hardening compounds, adhesives for building construction in the nature of concrete, masonry, and stone sealing compounds; cures, namely, chemical compounds for curing concrete and concrete curing agent dispersion for the preparation of clear coats, enamels, and primers; seals in the nature of industrial adhesives for use in coating and sealing concrete; seals in the nature of synthetic resins that are used to repair and fill holes and cracks in concrete, adhere to surrounding materials and seal concrete surfaces for use in harsh environments; bonding agents in the nature of adhesives for use in concrete construction; epoxy resins for use on concrete; and chemical compounds for curing concrete in the nature of shake-on floor hardeners and toppings

Design for others in the field of engineering

Filing History

NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED
Jan 4, 2022 NAS8
REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)
Jan 4, 2022 RNL1
REGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8
Jan 4, 2022 9G8P
REGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED
Jan 4, 2022 8PRT
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Nov 29, 2021 APRE
TEAS SECTION 8 & 9 RECEIVED
Jul 6, 2021 E89R
COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Jan 4, 2020 REM2
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Dec 11, 2019 ASCK
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Mar 27, 2019 ASCK
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Sep 19, 2018 ASCK
NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Mar 10, 2017 NA85
REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Mar 10, 2017 C15A
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Mar 10, 2017 APRE
TEAS SECTION 8 & 15 RECEIVED
Jan 9, 2017 E815
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Nov 30, 2016 ASCK
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Aug 1, 2012 ASCK
REGISTERED-PRINCIPAL REGISTER
Jan 4, 2011 R.PR
NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
Nov 30, 2010 SUNA
LAW OFFICE REGISTRATION REVIEW COMPLETED
Nov 29, 2010 REGV
ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
Nov 22, 2010 CNPR
TEAS/EMAIL CORRESPONDENCE ENTERED
Nov 21, 2010 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Nov 21, 2010 CRFA
ASSIGNED TO LIE
Nov 19, 2010 ALIE
ASSIGNED TO LIE
Nov 18, 2010 ALIE
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Nov 2, 2010 TROA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
May 6, 2010 GNRN
NON-FINAL ACTION E-MAILED
May 6, 2010 GNRT
SU - NON-FINAL ACTION - WRITTEN
May 6, 2010 CNRT
STATEMENT OF USE PROCESSING COMPLETE
Apr 30, 2010 SUPC
USE AMENDMENT FILED
Apr 29, 2010 IUAF
TEAS STATEMENT OF USE RECEIVED
Apr 29, 2010 EISU
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Nov 4, 2009 ASCK
SOU EXTENSION 4 GRANTED
Nov 2, 2009 EX4G
SOU EXTENSION 4 FILED
Oct 30, 2009 EXT4
SOU TEAS EXTENSION RECEIVED
Oct 30, 2009 EEXT
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Oct 28, 2009 ASCK
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Jun 3, 2009 ASCK
SOU EXTENSION 3 GRANTED
May 18, 2009 EX3G
CASE ASSIGNED TO INTENT TO USE PARALEGAL
May 18, 2009 AITU
SOU EXTENSION 3 FILED
Apr 30, 2009 EXT3
SOU TEAS EXTENSION RECEIVED
Apr 30, 2009 EEXT
SOU EXTENSION 2 GRANTED
Oct 30, 2008 EX2G
SOU EXTENSION 2 FILED
Oct 30, 2008 EXT2
SOU TEAS EXTENSION RECEIVED
Oct 30, 2008 EEXT
SOU EXTENSION 1 GRANTED
Apr 30, 2008 EX1G
SOU EXTENSION 1 FILED
Apr 30, 2008 EXT1
SOU TEAS EXTENSION RECEIVED
Apr 30, 2008 EEXT
NOA MAILED - SOU REQUIRED FROM APPLICANT
Oct 30, 2007 NOAM
PUBLISHED FOR OPPOSITION
Aug 7, 2007 PUBO
NOTICE OF PUBLICATION
Jul 18, 2007 NPUB
LAW OFFICE PUBLICATION REVIEW COMPLETED
Jul 3, 2007 PREV
ASSIGNED TO LIE
Jul 3, 2007 ALIE
APPROVED FOR PUB - PRINCIPAL REGISTER
May 29, 2007 CNSA
EXAMINER'S AMENDMENT ENTERED
May 29, 2007 XAEC
EXAMINERS AMENDMENT E-MAILED
May 29, 2007 GNEA
EXAMINERS AMENDMENT -WRITTEN
May 29, 2007 CNEA
ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
May 23, 2007 ARAA
TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
May 23, 2007 REAP
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Feb 7, 2007 ASCK
AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
Dec 20, 2006 ASGN
FINAL REFUSAL E-MAILED
Nov 29, 2006 GNFR
FINAL REFUSAL WRITTEN
Nov 29, 2006 CNFR
FINAL REFUSAL WRITTEN
Nov 28, 2006 CNFR
TEAS/EMAIL CORRESPONDENCE ENTERED
Nov 4, 2006 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 30, 2006 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Oct 30, 2006 TROA
TEAS CHANGE OF CORRESPONDENCE RECEIVED
May 11, 2006 TCCA
NON-FINAL ACTION E-MAILED
Apr 29, 2006 GNRT
NON-FINAL ACTION WRITTEN
Apr 29, 2006 CNRT
ASSIGNED TO EXAMINER
Apr 24, 2006 DOCK
NEW APPLICATION ENTERED
Oct 25, 2005 NWAP