THE RIGHT PEOPLE . . . IN THE RIGHT PLACE . . . AT THE RIGHT TIME.
LIVE

Serial Number

77289019

Owner

Hargrove and Associates

Attorney

Michele Kane

Filing Date

Sep 26, 2007

Add to watchlist:

No watchlists yet
View on USPTO

THE RIGHT PEOPLE . . . IN THE RIGHT PLACE . . . AT THE RIGHT TIME. Trademark

Serial Number: 77289019 • Registration: 3593777

THE RIGHT PEOPLE . . . IN THE RIGHT PLACE . . . AT THE RIGHT TIME. is a trademark filed by Hargrove and Associates on September 26, 2007. The trademark is classified under Class 37 (Building & Construction), Class 42 (Computer & Scientific), Class 35 (Advertising & Business). The application is currently registered and active.

Owner Contact Info

Hargrove and Associates

20 South Royal Street
Mobile, AL 36602

Entity Type: 03

Trademark Details

Filing Date

September 26, 2007

Registration Date

March 24, 2009

Published for Opposition

January 6, 2009

Goods & Services

Construction planning in the manufacturing and energy industrial sectors, namely, planning and laying out of production and factory facilities; construction services, namely, heavy industrial construction of power generating facilities, pulp and paper mills, steel mills, steel processing mills, chemical production facilities, oil and gas processing and transmission facilities, pipelines, refineries, pharmaceutical manufacturing plants, docks, wharves, warehouses, and manufacturing facilities, namely, wood chip processing, coal handling, automotive production, foundries, computer control systems, chip manufacturing, appliance manufacturing, and textile manufacturing; construction management in the manufacturing and energy industrial sectors

Procurement, namely, purchasing engineered items in the nature of rotating process equipment, namely, pumps, compressors, agitators, vacuum systems, chillers, HVAC equipment, rolling mills, conveyors, tables, specialized metal processing equipment, evaporators, fans, blowers, separators, dryers, powered filters, generators, and turbines, fired equipment, namely, boilers, thermal oxidizers, flares and other fired heaters, fabricated equipment, namely, tanks, vessels, heat exchangers, columns, column internals, crystallizers, filters, separators, dryers, pots, bins, and stacks, instruments and valves, namely, temperature, pressure, level, gauges, and transmitters, flow measurement devices and transmitters, density, conductivity, salinity, and all manner of physical property measurement, analyzers, gas chromatography units, computer control systems, including DCS systems and components, programmable logic controllers, relays, and repeaters, barriers, and all components required for safe process and environmental control, electrical equipment, namely, motors, transformers, motor control centers, switchgears, switches, capacitors, photovoltaic cells, generators, and turbines, and bulk construction elements in the nature of fill, soil, geofabric, ties, guard rails, sod, seed, erosion control devices, underground piping, culverts, concrete, reinforcing steel, embedded steel, anchor bolts and nuts, epoxies, sealants, paint, coatings, structural steel and fasteners, grating, metal deck, metal siding, metal roofing, insulation, roofing materials of all types, asphalt paving, masonry, precast and prestressed concrete elements, wood framing and fasteners, studs, wood and metal, piping and plumbing, including valves, plugs, flanges, fittings, blinds, electrical wire and cable, raceway, conduit, cable tray and fittings, and all required fasteners, seals, stands, mounts, and hardware for others in the manufacturing and energy industrial sectors; procurement services, namely, purchasing construction equipment and construction materials for others in the manufacturing and energy industrial sectors

Engineering and design for others in the fields of chemical engineering and design, mechanical engineering and design, process engineering and design, piping engineering and design, electrical engineering and design, instrumentation engineering and design, control systems engineering and design, civil engineering and design, structural engineering and design, and foundation engineering and design; technical support services and consultation, namely, providing technical advice and troubleshooting in chemical engineering and design, mechanical engineering and design, process engineering and design, piping engineering and design, electrical engineering and design, instrumentation engineering and design, control systems engineering and design, civil engineering and design, structural engineering and design, and foundation engineering and design

Filing History

NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED
Apr 15, 2019 NA89
REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)
Apr 15, 2019 RNL1
REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED
Apr 15, 2019 89AG
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Apr 15, 2019 APRE
TEAS CHANGE OF CORRESPONDENCE RECEIVED
Mar 14, 2019 TCCA
TEAS SECTION 8 & 9 RECEIVED
Mar 14, 2019 E89R
COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Mar 24, 2018 REM2
NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Jan 21, 2015 NA85
REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Jan 21, 2015 C15A
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jan 21, 2015 APRE
TEAS SECTION 8 & 15 RECEIVED
Jan 6, 2015 E815
REGISTERED-PRINCIPAL REGISTER
Mar 24, 2009 R.PR
PUBLISHED FOR OPPOSITION
Jan 6, 2009 PUBO
NOTICE OF PUBLICATION
Dec 17, 2008 NPUB
LAW OFFICE PUBLICATION REVIEW COMPLETED
Nov 29, 2008 PREV
ASSIGNED TO LIE
Nov 29, 2008 ALIE
APPROVED FOR PUB - PRINCIPAL REGISTER
Nov 25, 2008 CNSA
EXAMINER'S AMENDMENT ENTERED
Nov 25, 2008 XAEC
NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Nov 25, 2008 GNEN
EXAMINERS AMENDMENT E-MAILED
Nov 25, 2008 GNEA
EXAMINERS AMENDMENT -WRITTEN
Nov 25, 2008 CNEA
TEAS CHANGE OF CORRESPONDENCE RECEIVED
Nov 4, 2008 TCCA
TEAS/EMAIL CORRESPONDENCE ENTERED
Nov 4, 2008 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Nov 4, 2008 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Nov 4, 2008 TROA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
Jul 15, 2008 GNRN
NON-FINAL ACTION E-MAILED
Jul 15, 2008 GNRT
NON-FINAL ACTION WRITTEN
Jul 15, 2008 CNRT
TEAS/EMAIL CORRESPONDENCE ENTERED
Jun 12, 2008 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 12, 2008 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Jun 12, 2008 TROA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
Dec 30, 2007 GNRN
NON-FINAL ACTION E-MAILED
Dec 30, 2007 GNRT
NON-FINAL ACTION WRITTEN
Dec 30, 2007 CNRT
ASSIGNED TO EXAMINER
Dec 30, 2007 DOCK
NEW APPLICATION ENTERED
Oct 1, 2007 NWAP