STORMMEISTER
LIVE

Add to watchlist:

No watchlists yet
View on USPTO

STORMMEISTER Trademark

Serial Number: 79218672 • Registration: 5557762

STORMMEISTER is a trademark filed by William M Snape Manufacturing Services (UK) Limited on August 16, 2017. The trademark is classified under Class 6 (Metal Goods), Class 37 (Building & Construction), Class 42 (Computer & Scientific), Class 17 (Rubber Goods), Class 19 (Building Materials), Class 35 (Advertising & Business). The application is currently registered and active.

Owner Contact Info

William M Snape Manufacturing Services (UK) Limited

120 - 124,Towngate,

Entity Type: 99

Trademark Details

Filing Date

August 16, 2017

Registration Date

September 11, 2018

Published for Opposition

June 26, 2018

Goods & Services

Building and construction materials and elements not of metal, namely, floor boards; doors, gates and windows not of metal; high performance fabric covers for use in protecting window during storms; portable flood barriers, not of metal; shutters, not of metal; fireplace air bricks

Building and construction materials and elements of metal, namely, doors, gates, windows and window coverings in the nature of shutters; portable metal flood barriers; exterior metal shutters

Non-metal seals; non-metallic waterproofing and moisture proofing insulating tiles and membranes; non-metallic weather seals for doors; non-metallic weather seals for windows

Installation of doors; installation of windows; installation of barriers; installation of shutters; installation of gates; installation of flood prevention products; consultancy, advisory and information services in relation to the aforesaid services in this class

On-line retail stores featuring building and construction materials and elements of metal, building and construction materials and elements not of metal, doors, gates, windows and window coverings, flood barriers, metal flood barriers, shutters, metal shutters, seals, weather seals for doors and windows, and air bricks; retail store services in connection with the sale of building and construction materials and elements of metal, building and construction materials and elements not of metal, doors, gates, windows and window coverings, flood barriers, metal flood barriers, shutters, metal shutters, seals, weather seals for doors and windows, and air bricks; advisory and information services in relation to the aforesaid services

Product development; product development in relation to flood prevention; research and development for product design in relation to flood prevention; engineering for works for flood prevention; engineering works for the prevention of inundation of buildings by flood water; technical consultancy in the field of environmental science; consultancy, advisory and information services for or in relation to any or all of the aforementioned services

Filing History

CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Feb 10, 2025 APRE
TEAS SECTION 71 RECEIVED
Aug 14, 2024 ES71
COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Sep 11, 2023 REM3
FINAL DECISION TRANSACTION PROCESSED BY IB
Mar 15, 2019 FINO
GENERIC MADRID TRANSACTION SENT TO IB
Dec 15, 2018 XXSS
GENERIC MADRID TRANSACTION CREATED
Dec 15, 2018 XXCR
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Dec 11, 2018 FICR
REGISTERED-PRINCIPAL REGISTER
Sep 11, 2018 R.PR
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jun 26, 2018 NPUB
PUBLISHED FOR OPPOSITION
Jun 26, 2018 PUBO
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jun 6, 2018 NONP
APPROVED FOR PUB - PRINCIPAL REGISTER
May 22, 2018 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
May 19, 2018 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
May 18, 2018 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
May 18, 2018 TROA
REFUSAL PROCESSED BY IB
Jan 27, 2018 RFNP
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jan 11, 2018 RFCS
REFUSAL PROCESSED BY MPU
Jan 11, 2018 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Dec 22, 2017 RFCR
NON-FINAL ACTION WRITTEN
Dec 21, 2017 CNRT
NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW
Dec 19, 2017 RFWR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Dec 7, 2017 RFCR
NON-FINAL ACTION WRITTEN
Dec 6, 2017 CNRT
NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW
Dec 4, 2017 RFWR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Nov 21, 2017 RFCR
NON-FINAL ACTION WRITTEN
Nov 20, 2017 CNRT
ASSIGNED TO EXAMINER
Nov 17, 2017 DOCK
APPLICATION FILING RECEIPT MAILED
Oct 24, 2017 MAFR
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Oct 20, 2017 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Oct 19, 2017 REPR