SOLFARM
DEAD

Serial Number

79394938

Owner

SCHLETTER INTERNATIONAL B.V.

Filing Date

Dec 12, 2023

Add to watchlist:

No watchlists yet
View on USPTO

SOLFARM Trademark

Serial Number: 79394938

SOLFARM is a trademark filed by SCHLETTER INTERNATIONAL B.V. on December 12, 2023. The trademark is classified under Class 6 (Metal Goods), Class 7 (Machinery), Class 9 (Computers & Electronics), Class 37 (Building & Construction), Class 42 (Computer & Scientific). The application is currently no longer active.

Owner Contact Info

SCHLETTER INTERNATIONAL B.V. (5 trademarks)

STRAWINSKYLAAN 3127
AMSTERDAM 1077ZX , NL

Entity Type: 03

Trademark Details

Filing Date

December 12, 2023

Registration Date

Not Registered

Goods & Services

Machine tools; motors (except motors for land vehicles); machine coupling and transmission components (except for land vehicles); electrical generators; electrical generators using solar cells; solar power generators; drives and linear guide units for motor-driven tracking of photovoltaic components and installations towards sun position, except for land vehicles; hangers as parts of machines.

Common metals and their alloys; building and assembly materials of metal; sheets, rods, pipes and profiles of metal, in particular extruded profiles of light metal; mounts, fastening and connecting parts of metal for construction and assembly purposes; buildings of metal, including transportable buildings; roofs, exhibition stands and stage sets of metal; roofs of metal with integrated solar cells; frameworks of metal for construction and assembly purposes; frameworks for photovoltaic installations; small items of metal hardware and goods of metal for construction purposes; roof ladders, roof steps and roof hooks of metal; posts and supports of metal; containers, transport pallets and crates of metal; ironmongery, small items of metal hardware; fittings of metal for building and furniture.

Building construction; steel construction and light metal construction work; building of exhibition stands and stage sets; building, installation and maintenance of photovoltaic installations, including establishing work; building, installation and maintenance of photovoltaic cells and modules; assembling [installation] of machine plant; assembling [installation] of building framework; building construction supervision; varnishing.

Scientific, surveying, optical, weighing, measuring, signalling, checking (supervision) instruments as well as life-saving apparatus and equipment; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; data processing equipment; computer, computer software, photovoltaic devices for generating electricity, in particular photovoltaic modules and installations made therefrom; lightning conductors; voltage surge protectors; computer programs for the planning and project management of photovoltaic installations as well as for calculating their energy yields; photovoltaic solar modules; photovoltaic devices and installations for generating solar electricity, solar battery chargers; solar energy collectors for electricity generation; [electric] solar cells; solar panels; solar panels for generating electricity; portable solar panels for generating electricity.

Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software; software creation; software development; software engineering; architectural and engineer services; conducting technical project studies; construction drafting; civil engineering frameworks planning services; engineering consultancy and planning services in the field of renewable energy, in particular photovoltaic and biogas installations, including calculation of energy sources; conducting engineering surveys.

Filing History

NEW REPRESENTATIVE AT IB RECEIVED
Jan 1, 2026 NREP
NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Oct 18, 2025 OPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Oct 2, 2025 OPNS
NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Oct 2, 2025 OPNR
ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
Mar 12, 2025 MAB2
ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
Mar 12, 2025 ABN2
REFUSAL PROCESSED BY IB
Aug 25, 2024 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Aug 5, 2024 RFCS
REFUSAL PROCESSED BY MPU
Aug 5, 2024 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jul 14, 2024 RFCR
NON-FINAL ACTION WRITTEN
Jul 13, 2024 CNRT
ASSIGNED TO EXAMINER
Jul 10, 2024 DOCK
APPLICATION FILING RECEIPT MAILED
May 14, 2024 MAFR
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
May 14, 2024 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
May 2, 2024 REPR