SOLARTRAILER.PRO
DEAD

Serial Number

79383591

Owner

Green Energy AS

Filing Date

Oct 4, 2023

Add to watchlist:

No watchlists yet
View on USPTO

SOLARTRAILER.PRO Trademark

Serial Number: 79383591

SOLARTRAILER.PRO is a trademark filed by Green Energy AS on October 4, 2023. The trademark is classified under Class 7 (Machinery), Class 9 (Computers & Electronics), Class 11 (Environmental Control), Class 12 (Vehicles), Class 37 (Building & Construction). The application is currently no longer active.

Owner Contact Info

Green Energy AS (13 trademarks)

Ã…sdalsveien 5

Entity Type: 99

Green Energy Scandinavia A/S (4 trademarks)

Niels Bohrs Vej 2

Entity Type: 99

Trademark Details

Filing Date

October 4, 2023

Registration Date

Not Registered

Goods & Services

Installation of photovoltaic systems for supply purposes; Repair and maintenance of solar energy powered heating installations

Solar thermal collectors [heating]; Solar cell lighting apparatus

Electrical generators using solar cells

Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution and use of electricity, including solar panels, solar panel systems and solar cells

Automobiles and structural parts therefor; Sunshine roofs for vehicles; Drive units for land vehicles; Water vehicles; Parts and fittings for water vehicles; Vehicles for travel by air; Structural parts for aircraft

Filing History

FINAL DECISION TRANSACTION PROCESSED BY IB
Jan 29, 2026 FINT
FINAL DISPOSITION NOTICE SENT TO IB
Jan 12, 2026 FICS
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Jan 10, 2026 FICR
NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
May 9, 2025 OPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Apr 22, 2025 OPNS
NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Apr 22, 2025 OPNR
ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
Jan 10, 2025 MAB2
ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
Jan 10, 2025 ABN2
REFUSAL PROCESSED BY IB
Jul 15, 2024 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jun 26, 2024 RFCS
REFUSAL PROCESSED BY MPU
Jun 26, 2024 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jun 14, 2024 RFCR
NON-FINAL ACTION WRITTEN
May 28, 2024 CNRT
ASSIGNED TO EXAMINER
May 23, 2024 DOCK
CHANGE OF OWNER RECEIVED FROM IB
Feb 3, 2024 CHLD
APPLICATION FILING RECEIPT MAILED
Dec 1, 2023 MAFR
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Nov 27, 2023 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Nov 23, 2023 REPR