SEALER
LIVE

Serial Number

79422577

Owner

Blykalla AB

Attorney

Charlene Azema

Filing Date

Jan 9, 2025

Add to watchlist:

No watchlists yet
View on USPTO

SEALER Trademark

Serial Number: 79422577 • Registration: 8290149

SEALER is a trademark filed by Blykalla AB on January 9, 2025. The trademark is classified under Class 1 (Chemicals), Class 4 (Lubricants & Fuels), Class 6 (Metal Goods), Class 7 (Machinery), Class 11 (Environmental Control), Class 37 (Building & Construction), Class 39 (Transportation & Storage), Class 40 (Treatment & Processing), Class 42 (Computer & Scientific). The application is currently registered and active.

Owner Contact Info

Blykalla AB (2 trademarks)

Varvsgatan 13

Entity Type: 64

Trademark Details

Filing Date

January 9, 2025

Registration Date

June 9, 2026

Published for Opposition

April 21, 2026

Goods & Services

Electrical energy; electrical energy from renewable sources

Construction of nuclear reactors; construction of nuclear power plants; installation of electrical and generating machinery; renovation of nuclear plant; cleaning of nuclear plant; servicing, namely, maintenance and repair of nuclear plants; repair of energy supply installations; power infrastructure construction

Fuel for nuclear reactors; moderating materials in the nature of liquid lead for nuclear reactors

Distribution of energy; distribution of renewable energy; storage of energy and fuels; electricity distribution; distribution and transmission of electricity; electricity supply and distribution; consultancy services relating to the distribution of electricity; distribution of heat

Nuclear reactors; nuclear power plants; nuclear generators; reactor vessels; steam generators; heat generating apparatus, namely, small modular nuclear reactors (SMR); steam heating apparatus; industrial heating installations, namely, small modular nuclear reactors (SMR)

Scientific research in the field of renewable energy; scientific research in the field of energy; research in the field of energy; research in the field of nuclear energy power generation technology; computer technology consultancy; consumer product safety testing and consultation; providing scientific information, advice and consultancy relating to net zero emissions; engineering services in the field of electrical power and natural gas production; research in the field of physics; advisory services relating to building design; research and development services in the field of engineering

Energy production; production of energy by nuclear power plants; generation of power; production of energy by power plants; production of electrical power from renewable sources; electricity generating; consultancy services relating to the generation of electrical power; generation of biogas

Machines for generating gas by electrolysis; industrial chemical reactors; reactors for gas-solids reactions in the nature of industrial chemical reactors

prefabricated modular metal structures; modular portable metal structures; alloys of common metal; common metals and their alloys; steel building materials, namely, steel panels and cladding; steel; steel alloys; metal alloys for further manufacturing; additive alloys for the production of steel, namely, steel alloys; common metals and their alloys; stainless steel

Filing History

NOTICE OF REGISTRATION CONFIRMATION EMAILED
Jun 9, 2026 NRCC
REGISTERED-PRINCIPAL REGISTER
Jun 9, 2026 R.PR
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Apr 21, 2026 NPUB
PUBLISHED FOR OPPOSITION
Apr 21, 2026 PUBO
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Apr 15, 2026 NONP
APPROVED FOR PUB - PRINCIPAL REGISTER
Mar 23, 2026 CNSA
EXAMINER'S AMENDMENT ENTERED
Mar 20, 2026 XAEC
ASSIGNED TO LIE
Mar 20, 2026 ALIE
NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Mar 18, 2026 GNEN
EXAMINERS AMENDMENT E-MAILED
Mar 18, 2026 GNEA
EXAMINERS AMENDMENT -WRITTEN
Mar 18, 2026 CNEA
TEAS/EMAIL CORRESPONDENCE ENTERED
Feb 9, 2026 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Feb 9, 2026 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Feb 9, 2026 TROA
REFUSAL PROCESSED BY IB
Aug 30, 2025 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Aug 9, 2025 RFCS
REFUSAL PROCESSED BY MPU
Aug 9, 2025 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jun 24, 2025 RFCR
NON-FINAL ACTION WRITTEN
Jun 23, 2025 CNRT
ASSIGNED TO EXAMINER
Jun 18, 2025 DOCK
TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS
May 20, 2025 ECDR
ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
May 20, 2025 ARAA
TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
May 20, 2025 REAP
APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
May 20, 2025 CHAN
TEAS CHANGE OF OWNER ADDRESS RECEIVED
May 20, 2025 COAR
APPLICATION FILING RECEIPT MAILED
May 2, 2025 MAFR
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
May 2, 2025 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
May 1, 2025 REPR