SCHNELL
LIVE

Serial Number

79250127

Owner

SCHNELL S.P.A.

Attorney

James J. Bitetto

Filing Date

Jun 29, 2018

Add to watchlist:

No watchlists yet
View on USPTO

SCHNELL Trademark

Serial Number: 79250127 • Registration: 5993011

SCHNELL is a trademark filed by SCHNELL S.P.A. on June 29, 2018. The trademark is classified under Class 6 (Metal Goods), Class 7 (Machinery), Class 19 (Building Materials). The application is currently registered and active.

Owner Contact Info

SCHNELL S.P.A.

Via Sandro Rupoli, 2

Entity Type: 09

Trademark Details

Filing Date

June 29, 2018

Registration Date

February 25, 2020

Published for Opposition

December 10, 2019

Goods & Services

Machines and machine tools, namely, machines for processing iron for reinforced concrete; assembling machines, namely, assembly machines for the production of cylindrical, square or rectangular cages, assembly machinery for the production of cages with bars bent on the end, assembly line conveyor machinery, steel bending machines, power-operated shears, namely, mechanical shears, bending machines, and component parts and fitting therefor; electric welding machines; mechanical shears namely, electric shears; combined machines for processing iron; lifting machines for rolled and drawn coils, rewound coils, electro-welded mesh panels; machines for the handling of materials, namely, metal processing machine; shaping machines for metalworking; wrapping machines; machines for straightening and bending steel rods; cutting machines for cutting iron; mechanical presses for metalworking, namely, presses for use on iron; machines for making laces; lacing machines for producing laces; metal working machines, namely, combined machines for cutting and bending; metal working machines, namely, stirrup bender machines; metal working machines, namely, straightening machines; machines for cutting metal, namely, mesh cutter machines; mesh bending machines; metalworking machines; component parts of electric welding machines for the structural setting of scaffolding, namely, automatic welding parts and assembly template parts; metal working machines, namely, wire working machines; component parts of bending machines, namely, automatic bending work bench; planing machines; lathes; automatic loading machines; motorized conveyors, namely, belt conveyors and roller conveyors; automatic loading machines for bars and bundles; machine operated platform capable of elevation above ground level and used for the storage of metal bars; automatic loading machines for the storage and selective picking up of metal bars; industrial robots, namely, robots for working and handling metals, in particular, for working and handling iron, iron scaffolding for reinforced concrete and meshes; metal working machines, namely, machines for making spacers; extrusion moulding machines and component parts of these machines, namely, nozzles for use in spraying reinforced concrete; metal working machines, namely, machines for making panels made of metal scaffolding and insulating materials

Building panels and building goods not of metal, namely, non-metal building panel for use in construction, non-metal building flashing, non-metal pillar for building, non-metal exterior building shutters; modular building panels not of metal; prefabricated building panels and building goods not of metal, namely, concrete building panels, non-metal wall panels, non-metal ceiling panels, non-metal floor panels; modular building panels made primarily of non-metal armor and also comprised of insulating materials; non-metallic building material, namely, non-metallic building panels for use for buildings, non-metallic foundation material use for building, namely, concrete, partitions for building, non-metal cladding for construction and building in the nature of wall cladding for buildings, non-metallic cladding panels for roofs and non-metallic cladding panels for ceilings; non-metallic rigid pipes for buildings, namely, branching pipes not of metal, concrete pipes; non-metallic woven scaffolding for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal

Building panels of metal; building materials of metal, namely, building boards of metal, metal building flashing, brackets of metal for building; modular wall paneling of metal; modular panels made primarily of metal scaffolding and also comprising insulating materials; metal scaffolding, namely, metallic woven scaffolding for building; unwrought or semi-wrought common metals and their alloys, including stainless steel; metal building materials, namely, fascia, ceiling boards, floor boards, cladding boards, metal countertops for further installation; prefabricated buildings of metal; transportable buildings of metal; non-electric cables and wires of common metal; ironmongery, namely, iron gates, cast iron, joists of iron; small items of metal hardware, namely, springs, carabiners of metal, pulleys, nuts, sleeves in the nature of metal expanding sleeves for affixing screws, metal junction sleeves for non-electric cables, cable junction sleeves of metal, washers, hooks, nails, screws, rivets, bolts; pipes and tubes of metal; safes; metal ores; processed metal ores; iron ores

Filing History

TEAS SECTION 71 RECEIVED
Feb 24, 2026 ES71
COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Feb 25, 2025 REM3
NEW REPRESENTATIVE AT IB RECEIVED
Nov 5, 2022 NREP
CHANGE OF NAME/ADDRESS REC'D FROM IB
Sep 24, 2021 ADCH
FINAL DECISION TRANSACTION PROCESSED BY IB
Jul 17, 2020 FINO
FINAL DISPOSITION NOTICE SENT TO IB
Jun 27, 2020 FICS
FINAL DISPOSITION PROCESSED
Jun 27, 2020 FIMP
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
May 25, 2020 FICR
REGISTERED-PRINCIPAL REGISTER
Feb 25, 2020 R.PR
NOTIFICATION PROCESSED BY IB
Dec 20, 2019 GPNX
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Dec 10, 2019 NPUB
PUBLISHED FOR OPPOSITION
Dec 10, 2019 PUBO
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Dec 4, 2019 OPNS
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Dec 4, 2019 OP2R
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Nov 20, 2019 NONP
ASSIGNED TO LIE
Nov 7, 2019 ALIE
APPROVED FOR PUB - PRINCIPAL REGISTER
Nov 4, 2019 CNSA
EXAMINER'S AMENDMENT ENTERED
Nov 4, 2019 XAEC
NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Nov 4, 2019 GNEN
EXAMINERS AMENDMENT E-MAILED
Nov 4, 2019 GNEA
EXAMINERS AMENDMENT -WRITTEN
Nov 4, 2019 CNEA
TEAS/EMAIL CORRESPONDENCE ENTERED
Oct 30, 2019 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 29, 2019 CRFA
TEAS REQUEST FOR RECONSIDERATION RECEIVED
Oct 29, 2019 ERFR
NOTIFICATION OF FINAL REFUSAL EMAILED
Aug 29, 2019 GNFN
FINAL REFUSAL E-MAILED
Aug 29, 2019 GNFR
FINAL REFUSAL WRITTEN
Aug 29, 2019 CNFR
TEAS/EMAIL CORRESPONDENCE ENTERED
Aug 12, 2019 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 12, 2019 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Aug 12, 2019 TROA
REFUSAL PROCESSED BY IB
Mar 16, 2019 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Feb 20, 2019 RFCS
REFUSAL PROCESSED BY MPU
Feb 20, 2019 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Feb 7, 2019 RFCR
NON-FINAL ACTION WRITTEN
Feb 6, 2019 CNRT
NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW
Feb 6, 2019 RFWR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Feb 5, 2019 RFCR
NON-FINAL ACTION WRITTEN
Feb 4, 2019 CNRT
APPLICATION FILING RECEIPT MAILED
Feb 2, 2019 MAFR
ASSIGNED TO EXAMINER
Jan 29, 2019 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jan 29, 2019 NWOS
LIMITATION FROM ORIGINAL APPLICATION ENTERED
Jan 28, 2019 LIMI
SN ASSIGNED FOR SECT 66A APPL FROM IB
Jan 24, 2019 REPR