RIPPMANN FLOOR SYSTEM
DEAD

Serial Number

79383878

Owner

VAULTED AG

Attorney

Stacey Halpern

Filing Date

Sep 20, 2023

Add to watchlist:

No watchlists yet
View on USPTO

RIPPMANN FLOOR SYSTEM Trademark

Serial Number: 79383878

RIPPMANN FLOOR SYSTEM is a trademark filed by VAULTED AG on September 20, 2023. The trademark is classified under Class 9 (Computers & Electronics), Class 37 (Building & Construction), Class 42 (Computer & Scientific), Class 19 (Building Materials). The application is currently no longer active.

Owner Contact Info

VAULTED AG (3 trademarks)

Ackersteinstrasse 147

Entity Type: 25

Trademark Details

Filing Date

September 20, 2023

Registration Date

Not Registered

Goods & Services

Downloadable computer software for designing, planning, optimization and manufacture of structural building solutions in the field of construction; recorded computer software for the design, planning and assistance in the manufacture of structural building solutions in the field of construction; downloadable computer software for two or three-dimensional simulation for product design and development for the construction industry; downloadable computer software for the design and development of structural building elements for the construction industry

Construction consultancy; services provided by consultants concerning building and housing construction, namely, construction consultancy services; providing advice with respect to building construction; consultancy with respect to the construction of buildings

Technical development in the nature of development of new technology for structural elements for the construction industry; construction work planning, namely, construction drafting; conducting of technical project studies for construction projects, namely, conducting scientific feasibility studies regarding construction projects; preparation of reports relating to technical project studies in the nature of scientific feasibility studies regarding for construction projects; research with respect to building construction; engineering services in the field of construction technology; technical project studies being scientific feasibility studies in the field of construction; architectural services for the design of buildings; services provided by consultants in the field of architecture and construction drafting, namely, consultancy services in the field of architecture and construction drafting; design and development of computer software for the field of construction; providing temporary use online of non-downloadable software for designing, planning, optimization and manufacture of structural building solutions in the field of construction; software as a service (SaaS) services featuring software for designing, planning, optimization and manufacture of structural building solutions in the field of construction; design, maintenance and update of software for the field of construction; design, development, maintenance and update of process control software in the construction industry; design and development of software for the design, planning and manufacture of structural building solutions in the construction industry

Non-metallic construction materials, namely, slabs, columns, beams, panels, arches, vaults, bricks, blocks; transportable buildings not of metal; prefabricated buildings, not of metal; building materials of concrete, namely, slabs, columns, beams, panels, arches, vaults, bricks, blocks; construction materials not of metal, namely, slabs, columns, beams, panels, arches, vaults, bricks, blocks; concrete building elements, namely, slabs, columns, beams, panels, arches, vaults, bricks, blocks; modular construction materials, not of metal, namely, slabs, columns, beams, panels, arches, vaults, bricks, blocks; structural elements, not of metal, for construction, namely, slabs, columns, beams, panels, arches, vaults, bricks, blocks

Filing History

ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND
Aug 27, 2025 MAB2
ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
Aug 27, 2025 ABN2
NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
May 9, 2025 OPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Apr 22, 2025 OPNS
NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Apr 22, 2025 OPNR
NOTIFICATION OF FINAL REFUSAL EMAILED
Feb 10, 2025 GNFN
FINAL REFUSAL E-MAILED
Feb 10, 2025 GNFR
FINAL REFUSAL WRITTEN
Feb 10, 2025 CNFR
TEAS/EMAIL CORRESPONDENCE ENTERED
Dec 18, 2024 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 18, 2024 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Dec 18, 2024 TROA
REFUSAL PROCESSED BY IB
Jul 15, 2024 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jun 24, 2024 RFCS
REFUSAL PROCESSED BY MPU
Jun 24, 2024 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jun 5, 2024 RFCR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jun 5, 2024 RFCR
NON-FINAL ACTION WRITTEN
May 17, 2024 CNRT
ASSIGNED TO EXAMINER
May 14, 2024 DOCK
NEW REPRESENTATIVE AT IB RECEIVED
Dec 31, 2023 NREP
APPLICATION FILING RECEIPT MAILED
Dec 1, 2023 MAFR
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Nov 27, 2023 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Nov 23, 2023 REPR