RESEARCH-COTTRELL DRY COOLING
LIVE

Serial Number

79084001

Owner

HAMON & CIE (INTERNATIONAL) S.A.

Filing Date

Apr 19, 2010

Add to watchlist:

No watchlists yet
View on USPTO

RESEARCH-COTTRELL DRY COOLING Trademark

Serial Number: 79084001 • Registration: 3995821

RESEARCH-COTTRELL DRY COOLING is a trademark filed by HAMON & CIE (INTERNATIONAL) S.A. on April 19, 2010. The trademark is classified under Class 7 (Machinery), Class 11 (Environmental Control), Class 37 (Building & Construction), Class 42 (Computer & Scientific). The application is currently registered and active.

Owner Contact Info

HAMON & CIE (INTERNATIONAL) S.A. (10 trademarks)

AXISPARC
MONT-SAINT-GUIBERT 1435 , BE

Entity Type: 03

JOHN COCKERILL HAMON SA (7 trademarks)

1 RUE JEAN POTIER
SERAING 4100 , BE

Entity Type: 11

Trademark Details

Filing Date

April 19, 2010

Registration Date

July 19, 2011

Published for Opposition

May 3, 2011

Goods & Services

[ Industrial machinery and machine tools, namely, air condensers, water condensers, de-aerators for feed water, steam separators, feed water pumps, extraction pumps for extracting condensate for condensers; motors, other than for land vehicles; fans for motors and engines, motors and engines for fans and for air conditioning apparatus and installations; heat exchangers being parts of machines; filters being parts of machines or engines ]

Repair and maintenance of constructions, namely, of water cooling towers, air condensers, water condensers, and steam condensers; services for assembling, cleaning, maintenance and repair of heating installations, ventilation installations, air conditioning installations, refrigeration installations, heat exchangers, as well as cooling installations and cooling towers; repair or maintenance of machines; rental of construction machines and tools; turnkey construction of cooling installations and cooling towers

[ Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and sanitary purposes, namely, desalination plants; cooling appliances and installations, namely, water cooling towers, air condensers, water condensers and steam condensers; distillation apparatus; heat exchangers not being parts of machines; air conditioning apparatus and installations; air cooling apparatus and installations; air conditioning fans, fans as parts of air conditioning installations; electrostatic precipitators; apparatus and installations for flue gas desulfurization; air purification apparatus and installations; air filtering installations; filters for air conditioning apparatus and installations; filters for air cooling apparatus and installations; apparatus for gas purification in the nature of gas scrubbers; filters being parts of industrial installations ]

Construction drafting and advice in the field of construction; construction drafting and advice in the field of assembling heat exchangers, cooling installations and cooling towers; services of architects, chemists, physicists, engineers and land surveyors; computer programming services; surveys drawn up by engineers or laboratories; technical consulting services in the field of civil engineering; materials testing; heat performance testing; inspection services for quality control of heating, ventilating, refrigerating installations, heat exchangers as well as cooling installations and cooling towers; technical project studies and management of technical projects for designing and improving quality of cooling towers and cooling installations, air monitoring systems and heat exchangers; feasibility studies in the field of construction, assembly and improvement of cooling towers, cooling installations and air monitoring systems; engineering services; research and analysis pertaining to the monitoring of air contamination and cooling processes

Filing History

NEW REPRESENTATIVE AT IB RECEIVED
May 11, 2024 NREP
CHANGE OF OWNER RECEIVED FROM IB
Oct 20, 2023 CHLD
INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE
Mar 13, 2023 INNA
PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Jan 23, 2023 INPR
NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
May 23, 2022 NA71
REGISTERED-SEC.71 ACCEPTED
May 23, 2022 71AG
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
May 10, 2022 APRE
TEAS SECTION 71 RECEIVED
Oct 15, 2021 ES71
CHANGE OF NAME/ADDRESS REC'D FROM IB
Jul 30, 2021 ADCH
COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
Jul 19, 2020 REM4
INTERNATIONAL REGISTRATION RENEWED
May 28, 2020 RNWL
PARTIAL INVALIDATION PROCESSED BY THE IB
Jun 8, 2018 INNP
PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Apr 23, 2018 INPS
INVALIDATION PROCESSED
Apr 23, 2018 INPC
PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Apr 18, 2018 INPR
NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
Aug 18, 2017 NA75
REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.
Aug 18, 2017 C75P
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Aug 7, 2017 APRE
TEAS SECTION 71 & 15 RECEIVED
Jul 19, 2017 ES75
FINAL DECISION TRANSACTION PROCESSED BY IB
May 5, 2013 FINO
FINAL DISPOSITION NOTICE SENT TO IB
Jan 23, 2012 FICS
FINAL DISPOSITION PROCESSED
Jan 23, 2012 FIMP
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Oct 19, 2011 FICR
REGISTERED-PRINCIPAL REGISTER
Jul 19, 2011 R.PR
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
May 3, 2011 NPUB
PUBLISHED FOR OPPOSITION
May 3, 2011 PUBO
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Apr 13, 2011 OPNS
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Apr 13, 2011 OP2R
LAW OFFICE PUBLICATION REVIEW COMPLETED
Mar 25, 2011 PREV
APPROVED FOR PUB - PRINCIPAL REGISTER
Mar 25, 2011 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Mar 1, 2011 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 1, 2011 CRFA
ASSIGNED TO LIE
Feb 2, 2011 ALIE
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Jan 31, 2011 TROA
ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
Jan 31, 2011 ARAA
TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jan 31, 2011 REAP
TEAS CHANGE OF CORRESPONDENCE RECEIVED
Jan 31, 2011 TCCA
REFUSAL PROCESSED BY IB
Sep 4, 2010 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Aug 6, 2010 RFCS
REFUSAL PROCESSED BY MPU
Aug 6, 2010 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Aug 6, 2010 RFCR
NON-FINAL ACTION WRITTEN
Aug 5, 2010 CNRT
ASSIGNED TO EXAMINER
Jul 28, 2010 DOCK
APPLICATION FILING RECEIPT MAILED
Jul 21, 2010 MAFR
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jul 17, 2010 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Jul 15, 2010 REPR