RELINE UV
DEAD

Serial Number

79216305

Owner

SML VERWALTUNGS GMBH

Attorney

Shauna M. Wertheim

Filing Date

Mar 2, 2017

Add to watchlist:

No watchlists yet
View on USPTO

RELINE UV Trademark

Serial Number: 79216305

RELINE UV is a trademark filed by SML VERWALTUNGS GMBH on March 2, 2017. The trademark is classified under Class 1 (Chemicals), Class 7 (Machinery), Class 37 (Building & Construction), Class 42 (Computer & Scientific), Class 17 (Rubber Goods), Class 19 (Building Materials). The application is currently no longer active.

Owner Contact Info

SML VERWALTUNGS GMBH

Grosse Ahlmühle 31
76865 Rohrbach , DE

Entity Type: 16

RelineEurope GmbH

Große Ahlmühle 31

Entity Type: 27

Trademark Details

Filing Date

March 2, 2017

Registration Date

Not Registered

Goods & Services

Chemicals used in industry, science, agriculture, horticulture and forestry; unprocessed artificial resins, unprocessed plastics; tempering and soldering chemicals for metals; adhesives used in industry; chemicals for sewer remediation, soil consolidation and for building construction all included in this class; chemical sealing preparations, namely, chemical bonding adhesive fillers for sealing

Raw or partly processed rubber, gutta-percha, raw or partly processed gum, asbestos, and mica; products in semi-processed plastic materials, namely, plastics in extruded form for use in manufacture; packing and insulating materials; stopping materials, namely, sealing materials; flexible pipes, not of metal

Building construction; repair services, namely, remediation of sewers, pipes, drains, shafts and house connection pipes; services in the field of sewer construction and sewer remediation all included in this class; laying and construction of pipelines; sewer cleaning and pipe cleaning; installation services, namely, services relating to sewers, pipes, drains, shafts and house connection pipes

Machines and machine tools for sewer remediation, soil consolidation and building construction; mechanical devices for pipeline remediation; mechanical installations and apparatus for sewer inspection, sewer remediation and soil consolidation; motors and engines except for land vehicles; machine coupling and transmission components except for land vehicles

Building materials, namely, non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings

Scientific and technological services, namely, scientific research in the field of sewer remediation, sewer cleaning and soil consolidation; design and development of computer hardware and software; engineering services; technical consultancy in the fields of sewer remediation, sewer cleaning and soil consolidation; inspection services, namely, leak testing in shafts, buildings, sewer systems; sewer inspection; surveying in the field of sewer remediation; conducting technical project studies in the field of sewer remediation; quality control in the fields of sewer remediation, sewer cleaning and soil consolidation

Filing History

CHANGE OF OWNER RECEIVED FROM IB
Jun 11, 2026 CHLD
NEW REPRESENTATIVE AT IB RECEIVED
May 7, 2026 NREP
NEW REPRESENTATIVE AT IB RECEIVED
May 7, 2026 NREP
FINAL DECISION TRANSACTION PROCESSED BY IB
Nov 14, 2020 FINT
FINAL DISPOSITION NOTICE SENT TO IB
Oct 26, 2020 FICS
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Oct 25, 2020 FICR
ABANDONMENT NOTICE E-MAILED - EXPRESS ABANDONMENT
Oct 25, 2019 MAB1
ABANDONMENT - EXPRESS MAILED
Oct 25, 2019 ABN1
TEAS EXPRESS ABANDONMENT RECEIVED
Oct 23, 2019 EXAR
ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
Oct 18, 2019 ARAA
TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Oct 18, 2019 REAP
REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
May 2, 2019 RCSC
NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Mar 8, 2019 OPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Feb 20, 2019 OPNS
NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Feb 20, 2019 OPNR
REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Oct 15, 2018 RCSC
NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Apr 5, 2018 GNS3
LETTER OF SUSPENSION E-MAILED
Apr 5, 2018 GNSL
SUSPENSION LETTER WRITTEN
Apr 5, 2018 CNSL
TEAS/EMAIL CORRESPONDENCE ENTERED
Mar 15, 2018 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 15, 2018 CRFA
ASSIGNED TO LIE
Mar 14, 2018 ALIE
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Mar 1, 2018 TROA
REFUSAL PROCESSED BY IB
Oct 7, 2017 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Sep 20, 2017 RFCS
REFUSAL PROCESSED BY MPU
Sep 20, 2017 RFRR
APPLICATION FILING RECEIPT MAILED
Sep 19, 2017 MAFR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Sep 17, 2017 RFCR
NON-FINAL ACTION WRITTEN
Sep 16, 2017 CNRT
ASSIGNED TO EXAMINER
Sep 15, 2017 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Sep 15, 2017 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Sep 14, 2017 REPR