PUKATTO
LIVE

Add to watchlist:

No watchlists yet
View on USPTO

PUKATTO Trademark

Serial Number: 79239087 • Registration: 5809177

PUKATTO is a trademark filed by Sumitomo Mitsui Construction Co., Ltd. on February 19, 2018. The trademark is classified under Class 9 (Computers & Electronics), Class 19 (Building Materials). The application is currently registered and active.

Owner Contact Info

Sumitomo Mitsui Construction Co., Ltd. (9 trademarks)

2-1-6, Tsukuda,

Entity Type: 03

Trademark Details

Filing Date

February 19, 2018

Registration Date

July 23, 2019

Published for Opposition

May 7, 2019

Cancellation Date

February 6, 2026

Goods & Services

Water floatation solar system for power generation consisting of solar panels, solar panel stands, polyethylene floats and their connection parts; water floatation system assemblies for solar power generation consisting of solar panels, solar panel stands, polyethylene floats and their connection parts; floatation system for solar power generation comprising solar panels, solar panel stands, polyethylene floats, binding bands, and their connection parts, sold as a unit; solar panels for the production of electricity; floating photovoltaic solar panel arrays and the components for the same for the production of electricity; solar cells; floating solar rack system specially designed to hold solar panels for the generation of electricity; floating stands specially adapted for solar panels for solar power generation and the production of energy; stands specially adapted for solar panels for solar power generation and the production of energy; floating stands specially adapted for photovoltaic installations for generating electricity; stands specially adapted for photovoltaic installations for generating electricity; floating stands specially adapted for solar cells; stands specially adapted for solar cells; floats made of polyethylene specially adapted for floating solar panels for solar power generation and the production of energy on waterborne locations; floats made of polyethylene specially adapted for floating photovoltaic installations for generating electricity on waterborne locations; floats made of polyethylene specially adapted for floating solar cells on waterborne locations; photovoltaic cells and modules for floating photovoltaic power plants; photovoltaic cells and modules for photovoltaic power plants on water

Floating stands, prefabricated, for loading solar panels, not of metal; stands, prefabricated, for loading solar panels, not of metal; floating stands, prefabricated, for loading photovoltaic installations for generating electricity, not of metal; stands, prefabricated, for loading photovoltaic installations for generating electricity, not of metal; floating stands, prefabricated, for loading solar cells, not of metal; stands, prefabricated, for loading solar cells, not of metal; polyethylene floats, prefabricated, for floating solar panels on waterborne locations, not of metal; polyethylene floats, prefabricated, for floating photovoltaic installations for generating electricity on waterborne locations, not of metal; polyethylene floats, prefabricated, for floating solar cells on waterborne locations, not of metal; polyethylene floats, prefabricated, not of metal; prefabricated buildings, not of metal; ceramic construction materials, namely, bricks, refractory construction materials not of metal; construction materials made of plastic, namely, plastic wallboards; synthetic construction materials, namely, synthetic flooring materials; asphalt and asphalt felt for building and construction; rubber materials for building and construction, namely, rubber cove bases; plaster; materials made of lime for building and construction; gypsum materials for building and construction; cement and cement mixes; moulds for forming cement products, not of metal, namely, cement posts; greenhouse, transportable for household purposes, not of metal; non-metal structures for constructing floating solar panels; non-metal structures for constructing floating photovoltaic installations; non-metal building materials, namely, fiberglass panels and plastic pipe supports, for constructing floating solar panel arrays

Filing History

CANCELLED SECTION 71
Feb 6, 2026 C71T
COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Jul 23, 2024 REM3
FINAL DECISION TRANSACTION PROCESSED BY IB
Dec 1, 2019 FINO
FINAL DISPOSITION NOTICE SENT TO IB
Nov 8, 2019 FICS
FINAL DISPOSITION PROCESSED
Nov 8, 2019 FIMP
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Oct 23, 2019 FICR
CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED
Oct 22, 2019 CORR
CORRECTION TRANSACTION RECEIVED FROM IB
Aug 23, 2019 CRCV
REGISTERED-PRINCIPAL REGISTER
Jul 23, 2019 R.PR
POST PUBLICATION AMENDMENT - ENTERED
Jun 14, 2019 CHPB
ASSIGNED TO PETITION STAFF
Jun 13, 2019 APET
TEAS POST PUBLICATION AMENDMENT RECEIVED
May 22, 2019 EPPA
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
May 7, 2019 NPUB
PUBLISHED FOR OPPOSITION
May 7, 2019 PUBO
NOTIFICATION PROCESSED BY IB
May 3, 2019 GPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Apr 17, 2019 OPNS
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Apr 17, 2019 NONP
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Apr 17, 2019 OP2R
APPROVED FOR PUB - PRINCIPAL REGISTER
Mar 26, 2019 CNSA
EXAMINER'S AMENDMENT ENTERED
Mar 25, 2019 XAEC
NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Mar 25, 2019 GNEN
EXAMINERS AMENDMENT E-MAILED
Mar 25, 2019 GNEA
EXAMINERS AMENDMENT -WRITTEN
Mar 25, 2019 CNEA
TEAS/EMAIL CORRESPONDENCE ENTERED
Mar 21, 2019 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 20, 2019 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Mar 20, 2019 TROA
NON-FINAL ACTION MAILED
Jan 18, 2019 CNRT
NON-FINAL ACTION WRITTEN
Jan 17, 2019 CNRT
TEAS/EMAIL CORRESPONDENCE ENTERED
Jan 4, 2019 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jan 3, 2019 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Jan 3, 2019 TROA
REFUSAL PROCESSED BY IB
Sep 29, 2018 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Sep 10, 2018 RFCS
REFUSAL PROCESSED BY MPU
Sep 10, 2018 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Aug 31, 2018 RFCR
NON-FINAL ACTION WRITTEN
Aug 30, 2018 CNRT
APPLICATION FILING RECEIPT MAILED
Aug 28, 2018 MAFR
ASSIGNED TO EXAMINER
Aug 24, 2018 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Aug 24, 2018 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Aug 23, 2018 REPR