PSEUDO GENERIC OBJECT
DEAD

Serial Number

79238425

Owner

INFORMATIQUE GRAPHISME ENERGETIQUE -

Filing Date

Dec 20, 2017

Add to watchlist:

No watchlists yet
View on USPTO

PSEUDO GENERIC OBJECT Trademark

Serial Number: 79238425

PSEUDO GENERIC OBJECT is a trademark filed by INFORMATIQUE GRAPHISME ENERGETIQUE - on December 20, 2017. The trademark is classified under Class 9 (Computers & Electronics), Class 37 (Building & Construction), Class 42 (Computer & Scientific), Class 35 (Advertising & Business). The application is currently no longer active.

Owner Contact Info

INFORMATIQUE GRAPHISME ENERGETIQUE -

16 boulevard Déodat de Séverac

Entity Type: 98

APPLICATIONS LOGICIELS POUR INGENIERIE ALPI

1 boulevard Charles de Gaulle,
F-92700 COLOMBES , FR

Entity Type: 99

Trademark Details

Filing Date

December 20, 2017

Registration Date

Not Registered

Goods & Services

Software (recorded programs); application software; data processing equipment, electric wires, electric relays, electric batteries; weighing apparatus and instruments; measuring apparatus and instruments; electronic control circuits for electric heating and air-conditioning units; apparatus and devices for measuring and monitoring temperature for management of heating, ventilation and air-conditioning systems

Advisory services regarding construction, information relating to construction; advice relating to installation, maintenance and repair of electrical systems and equipment; advisory services concerning installation, maintenance and repair of plumbing systems and equipment; installation, maintenance and repair of plumbing systems and equipment; installation, maintenance and repair of heating, ventilation and air-conditioning systems and equipment; plumbing services; supervision (direction) of construction work

Recording of data concerning energy consumption in buildings

Electric system design services; design and development of software in the field of design of electrical systems, heating systems, ventilation systems, air-conditioning systems, and plumbing systems; design of heating, ventilation, air-conditioning and plumbing systems; modeling and 3D digitizing of structures, buildings, electric systems and equipment, heating systems and equipment, ventilation systems and equipment, air-conditioning systems and equipment, plumbing systems and equipment; research related to computerized automation of technical processes; technical evaluations concerning design (engineering work); scientific research; technical research; software design; software development; research and development of new products for others; technical project study services; architecture; design of interior decor; software development (design); software installation; software maintenance; updating of software; software rental; programming for computers; computer system analysis; computer system design; digitization of documents; software as a service (SaaS); cloud computing; information technology (IT) consultancy; electronic data storage; consulting services relating to the design of buildings [architecture]; professional advice on energy efficiency in buildings; development of software application solutions; software application development for transmitting multimedia content

Filing History

CHANGE OF OWNER RECEIVED FROM IB
Mar 13, 2025 CHLD
NEW REPRESENTATIVE AT IB RECEIVED
Oct 28, 2023 NREP
FINAL DECISION TRANSACTION PROCESSED BY IB
Apr 17, 2020 FINT
FINAL DISPOSITION NOTICE SENT TO IB
Mar 27, 2020 FICS
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Mar 27, 2020 FICR
NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Jan 31, 2020 OPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jan 15, 2020 OPNS
NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Jan 15, 2020 OPNR
ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
Mar 27, 2019 MAB2
ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
Mar 27, 2019 ABN2
REFUSAL PROCESSED BY IB
Sep 15, 2018 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Aug 24, 2018 RFCS
REFUSAL PROCESSED BY MPU
Aug 24, 2018 RFRR
APPLICATION FILING RECEIPT MAILED
Aug 18, 2018 MAFR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Aug 16, 2018 RFCR
NON-FINAL ACTION WRITTEN
Aug 15, 2018 CNRT
ASSIGNED TO EXAMINER
Aug 14, 2018 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Aug 14, 2018 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Aug 9, 2018 REPR