PRINZING PFEIFFER
LIVE

Serial Number

79320228

Owner

PRINZING - PFEIFFER GmbH

Attorney

David A Lowe

Filing Date

May 26, 2021

Add to watchlist:

No watchlists yet
View on USPTO

PRINZING PFEIFFER Trademark

Serial Number: 79320228 • Registration: 7070530

PRINZING PFEIFFER is a trademark filed by PRINZING - PFEIFFER GmbH on May 26, 2021. The trademark is classified under Class 6 (Metal Goods), Class 7 (Machinery), Class 37 (Building & Construction), Class 35 (Advertising & Business). The application is currently registered and active.

Owner Contact Info

PRINZING - PFEIFFER GmbH

Zum Weissen Jura 3

Entity Type: 99

masa GmbH (4 trademarks)

Masa Straße 2

Entity Type: 27

Trademark Details

Filing Date

May 26, 2021

Registration Date

June 6, 2023

Published for Opposition

March 21, 2023

Goods & Services

Concrete feeding machines; Concrete compaction machines; Concrete press machines; Vibrating machines for concrete; Vibro pressing machines; Concrete forming machines; Concrete spraying machines; Combined metal storage tanks and mixers for concrete production; Pumps for concrete feeding machines; Pumps for concrete compaction machines; Pumps for concrete press machines; Pumps for concrete vibrating machines; Pumps for concrete forming machines; Concrete pumps; Concrete construction machines; Concrete dosing and mixing machines; Concrete production machines and concrete processing machines, namely, machines for the manufacture of concrete parts and concrete mixers; Concrete mixing machines; Gas-operated welding machines; Electrode welding machines; Metal inert gas shielded arc welding machines; Metal arc welding machines; Filler wire welding machines; Bottle filling machines; Oxy-acetylene welding machines; Presses for industrial machines; Transport equipment, namely, pneumatic transporters; Transporting machines, namely, belt conveyers, mobile belt conveyers, v-belt conveyers, roller conveyers, conveyer plants, chain conveyers; Milling machines; Milling cutters for milling machines; Cement mixer for cementing manholes; Electric industrial concrete compactor; Pressing machines, namely, industrial machine presses; Welding machines, gas operated; Welding machines, electric; Robot-controlled welding machines; Pipe and manhole production plants; Machinery for use in plants for the production of precast concrete parts for infrastructure construction; Dosing machines, namely, concrete pumps; Machines for the manufacture of concrete elements using the turning process; Machines for the production of pipes and manhole elements, namely, concrete shaft rings, concrete shaft cones, concrete manhole bases, concrete treatment plant elements and tanks, concrete pipes, concrete tubes, concrete shafts, concrete manholes, concrete shaft elements, concrete precast parts for sewage system, concrete precast parts for rainwater harvesting, concrete precast parts for sewage technology, concrete precast parts for drainage, concrete precast parts for water supply, concrete precast parts for energy supply, concrete precast parts for telecommunication, for building and rectangular elements made of concrete; Radial press for concrete pipes; Machines for the production of pipes, manhole elements and precast parts made of concrete; Machines for the production of large pipes and frame elements made of concrete; Machines for the production of piles, masts and pressure pipes made of concrete; Machines for processing self-compacting concrete or earth-moist concrete; Rebar welding machines; Pipe and manhole processing machines; Spare parts for the aforesaid machines and installations, included in this class

Metal molds for forming cement products, namely, concrete shaft rings, concrete shaft cones, concrete manhole bases, concrete treatment plant elements and tanks, concrete pipes, concrete tubes, concrete shafts, concrete manholes, concrete shaft elements, concrete precast parts for sewage system, concrete precast parts for rainwater harvesting, concrete precast parts for sewage technology, concrete precast parts for drainage, rectangular elements made of concrete, concrete precast parts for water supply, concrete precast parts for energy supply, concrete precast parts for telecommunication, for building

Retail store services in the field of production and processing machines for the precast concrete industry, and spare parts and tools for such machines; Wholesale store services in the field of production and processing machines for the precast concrete industry, and spare parts and tools for such machines

Maintenance of welding machines and equipment; Dismantling of industrial production and processing machines for the concrete industry; Machinery installation, maintenance and repair

Filing History

CHANGE OF OWNER RECEIVED FROM IB
Nov 13, 2025 CHLD
NEW REPRESENTATIVE AT IB RECEIVED
May 3, 2024 NREP
NEW REPRESENTATIVE AT IB RECEIVED
Dec 29, 2023 NREP
FINAL DECISION TRANSACTION PROCESSED BY IB
Oct 3, 2023 FINO
FINAL DISPOSITION NOTICE SENT TO IB
Sep 6, 2023 FICS
FINAL DISPOSITION PROCESSED
Sep 6, 2023 FIMP
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Sep 6, 2023 FICR
NOTICE OF REGISTRATION CONFIRMATION EMAILED
Jun 6, 2023 NRCC
REGISTERED-PRINCIPAL REGISTER
Jun 6, 2023 R.PR
NOTIFICATION PROCESSED BY IB
Mar 21, 2023 GPNX
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Mar 21, 2023 NPUB
PUBLISHED FOR OPPOSITION
Mar 21, 2023 PUBO
NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Mar 14, 2023 OPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Mar 1, 2023 OPNS
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Mar 1, 2023 OP2R
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Mar 1, 2023 NONP
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Feb 22, 2023 OPNS
NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Feb 22, 2023 OPNR
APPROVED FOR PUB - PRINCIPAL REGISTER
Feb 15, 2023 CNSA
EXAMINER'S AMENDMENT ENTERED
Feb 15, 2023 XAEC
NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Feb 15, 2023 GNEN
EXAMINERS AMENDMENT E-MAILED
Feb 15, 2023 GNEA
EXAMINERS AMENDMENT -WRITTEN
Feb 15, 2023 CNEA
TEAS/EMAIL CORRESPONDENCE ENTERED
Feb 7, 2023 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Feb 7, 2023 CRFA
ASSIGNED TO LIE
Feb 6, 2023 ALIE
NOTICE OF REVIVAL - E-MAILED
Dec 6, 2022 NREV
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Dec 6, 2022 TROA
PETITION TO REVIVE-GRANTED
Dec 6, 2022 PETG
TEAS PETITION TO REVIVE RECEIVED
Dec 6, 2022 PROA
ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
Nov 3, 2022 MAB2
ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
Nov 3, 2022 MAB2
ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
Nov 3, 2022 ABN2
REFUSAL PROCESSED BY IB
May 10, 2022 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Apr 21, 2022 RFCS
REFUSAL PROCESSED BY MPU
Apr 21, 2022 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Mar 15, 2022 RFCR
NON-FINAL ACTION WRITTEN
Mar 14, 2022 CNRT
NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW
Mar 13, 2022 RFWR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Feb 10, 2022 RFCR
NON-FINAL ACTION WRITTEN
Feb 9, 2022 CNRT
ASSIGNED TO EXAMINER
Feb 9, 2022 DOCK
APPLICATION FILING RECEIPT MAILED
Sep 28, 2021 MAFR
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Sep 24, 2021 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Sep 16, 2021 REPR