PRIMA POWER
LIVE

Serial Number

79103970

Owner

Finn-Power Oy

Attorney

Duane M. Byers

Filing Date

Mar 30, 2011

Add to watchlist:

No watchlists yet
View on USPTO

PRIMA POWER Trademark

Serial Number: 79103970 • Registration: 4527375

PRIMA POWER is a trademark filed by Finn-Power Oy on March 30, 2011. The trademark is classified under Class 7 (Machinery), Class 9 (Computers & Electronics), Class 37 (Building & Construction). The application is currently registered and active.

Owner Contact Info

Finn-Power Oy (12 trademarks)

Metallitie 4
Kauhava 62200 , FI

Entity Type: 03

Trademark Details

Filing Date

March 30, 2011

Registration Date

May 13, 2014

Published for Opposition

February 25, 2014

Goods & Services

Lasers for industrial use, namely, laser sources for treating materials; computer software for computer-aided design/computer-aided manufacturing (CAD/CAM) for use during the processing of sheet metal; computer hardware for sheet metal processing centers and for machines and apparatus for processing sheet metal; computer software for sheet metal processing centers for use in controlling and operating machines and apparatus for processing sheet metal; computer software for sheet metal processing centers and for machines and apparatus for processing sheet metal, namely, industrial process control software

[ Machine tools, namely, broaches, chasers, ] [ gear cutters, ] [ machine tools for ] [ working wood, stone, ] [ glass, plastic, composite material, and numerically controlled machines and machine tools used for the cutting and forming of materials, namely, for working ] [ wood, ] [ plastic, glass, ] [ marble, ] [ metal; ] Machines and apparatus for processing metal, sheet metal and sheet-shaped metal, namely, electronically controlled laser machines for processing metal, sheet metal and sheet-shaped metal, electronically controlled laser machines for cutting sheet metal, metal sawing machines, metal working machines, milling machines and grinding machines for the treatment of metal; machines and apparatus for cutting sheet metal, namely, powered machines for cutting or shaping or finishing metals; [ laser machines for cutting fabric designed for installation directly above embroidery machines; ] brakes for machines, namely, press brakes; industrial machine presses, namely, punch presses and press brakes for forming of materials; bending machines; machines and apparatus for transporting, loading and unloading sheet metal, namely, lifting installations for the transport of sheet metal, pneumatic transporters, loading and unloading machines; automatic machines for storing and handling sheet metal, namely, material handling machines, namely, palletizers, case elevators, automatic pallet dispensing machines and automatic slip sheet dispensing machines

Installation, maintenance and repair of machines for processing sheet metal, of centers for processing sheet metal and of systems for processing sheet metal

Filing History

PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Dec 14, 2025 INPR
NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Apr 14, 2025 NA71
REGISTERED-SEC.71 ACCEPTED
Apr 14, 2025 71AG
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Apr 7, 2025 APRE
TEAS SECTION 71 RECEIVED
Oct 30, 2024 ES71
COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
May 13, 2023 REM4
NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
Jan 12, 2022 NA75
REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.
Jan 12, 2022 C75A
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jan 6, 2022 APRE
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Dec 6, 2021 APRE
INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE
Nov 30, 2021 INNA
PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Oct 27, 2021 INPR
TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Oct 7, 2021 EROP
INTERNATIONAL REGISTRATION RENEWED
Apr 15, 2021 RNWL
POST REGISTRATION ACTION MAILED - SEC. 71 & 15
Apr 7, 2021 PR75
PARTIAL INVALIDATION PROCESSED BY THE IB
Feb 28, 2021 INNP
PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Jan 16, 2021 INPS
INVALIDATION PROCESSED
Jan 16, 2021 INPC
PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Jan 14, 2021 INPR
TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Nov 23, 2020 EROP
POST REGISTRATION ACTION MAILED - SEC. 71 & 15
May 22, 2020 PR75
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
May 5, 2020 APRE
TEAS SECTION 71 & 15 RECEIVED
Apr 5, 2020 ES75
CHANGE OF NAME/ADDRESS REC'D FROM IB
Mar 5, 2020 ADCH
COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
May 13, 2019 REM3
NEW REPRESENTATIVE AT IB RECEIVED
Nov 16, 2018 NREP
FINAL DECISION TRANSACTION PROCESSED BY IB
Oct 23, 2014 FINO
FINAL DISPOSITION NOTICE SENT TO IB
Sep 23, 2014 FICS
FINAL DISPOSITION PROCESSED
Sep 23, 2014 FIMP
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Aug 13, 2014 FICR
REGISTERED-PRINCIPAL REGISTER
May 13, 2014 R.PR
NOTIFICATION PROCESSED BY IB
Mar 28, 2014 GPNX
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Feb 25, 2014 NPUB
PUBLISHED FOR OPPOSITION
Feb 25, 2014 PUBO
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Feb 5, 2014 OPNS
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Feb 5, 2014 OP2R
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Feb 5, 2014 NONP
LAW OFFICE PUBLICATION REVIEW COMPLETED
Jan 17, 2014 PREV
APPROVED FOR PUB - PRINCIPAL REGISTER
Jan 16, 2014 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Dec 31, 2013 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 30, 2013 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Dec 30, 2013 TROA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
Jun 29, 2013 GNRN
NON-FINAL ACTION E-MAILED
Jun 29, 2013 GNRT
NON-FINAL ACTION WRITTEN
Jun 29, 2013 CNRT
SUSPENSION CHECKED - TO ATTORNEY FOR ACTION
Jun 4, 2013 RCCK
NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Apr 20, 2013 OPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Apr 3, 2013 OPNS
NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Apr 3, 2013 OPNR
REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Dec 3, 2012 RCSC
ASSIGNED TO LIE
Dec 3, 2012 ALIE
NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Jun 3, 2012 GNS3
LETTER OF SUSPENSION E-MAILED
Jun 3, 2012 GNSL
SUSPENSION LETTER WRITTEN
Jun 3, 2012 CNSL
TEAS/EMAIL CORRESPONDENCE ENTERED
May 11, 2012 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
May 10, 2012 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
May 10, 2012 TROA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
May 10, 2012 TROA
ASSIGNED TO EXAMINER
Dec 8, 2011 DOCK
REFUSAL PROCESSED BY IB
Nov 27, 2011 RFNT
APPLICATION FILING RECEIPT MAILED
Nov 11, 2011 MAFR
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Nov 10, 2011 RFCS
REFUSAL PROCESSED BY MPU
Nov 9, 2011 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Nov 9, 2011 RFCR
NON-FINAL ACTION WRITTEN
Nov 8, 2011 CNRT
ASSIGNED TO EXAMINER
Nov 7, 2011 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Nov 7, 2011 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Nov 3, 2011 REPR