POWER ROAD BY EUROVIA
LIVE

Serial Number

79214187

Owner

EUROVIA

Attorney

Dianne Smith-Misemer

Filing Date

May 19, 2017

Add to watchlist:

No watchlists yet
View on USPTO

POWER ROAD BY EUROVIA Trademark

Serial Number: 79214187 • Registration: 5639942

POWER ROAD BY EUROVIA is a trademark filed by EUROVIA on May 19, 2017. The trademark is classified under Class 37 (Building & Construction), Class 42 (Computer & Scientific), Class 19 (Building Materials). The application is currently registered and active.

Owner Contact Info

EUROVIA (46 trademarks)

18, Place de I’ Europe,
92500 Rueil Malmaison , FR

Entity Type: 03

VINCI CONSTRUCTION (16 trademarks)

1973 Boulevard de la Défense

Entity Type: 98

Trademark Details

Filing Date

May 19, 2017

Registration Date

January 1, 2019

Published for Opposition

October 16, 2018

Cancellation Date

July 18, 2025

Goods & Services

Design of roads, traffic lanes, civil engineering structures, bridges, platforms, sidewalks, car parks and any type of road surface; evaluations and assessments, namely, expert reports in the fields of science and technology provided by engineers; scientific and technical research; research and development of new products for others; technical project studies, namely, engineering services, particularly technical project planning and design engineering in the field of road infrastructures and the energy domain; construction drafting services; environmental protection related research; quality control for others

Construction, maintenance and repair of roads, traffic lanes, civil engineering structures, road infrastructures, bridges, platforms, sidewalks and any road surface; information regarding construction of roads, traffic lanes, civil engineering structures, road infrastructures, bridges, platforms, sidewalks and any road surface; supervision of construction work for roads, traffic lanes, civil engineering structures, road infrastructures, bridges, platforms, car parks, sidewalks and any road surface; asphalting

Building materials and products not made of metal in the nature of bitumen asphalt, bituminous binder and coating for construction, surfacing, maintenance and renovation of roads, traffic lanes, civil engineering structures, platforms, sidewalks and any type of road surface; asphalt, pitch, bitumen and emulsions of bitumen, gravel, sand, artificial and natural stone, aggregates material composed of gravel, sand and natural stone for road construction and maintenance; slag in the nature of slag stone, macadam; bituminous building products and coatings for soils and road pavements, bituminous binders for road construction and maintenance; bituminous coated materials in the nature of bituminous coatings for road construction; paving blocks and slabs, not of metal

Filing History

TOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Mar 18, 2026 INTR
CANCELLED SECTION 71
Jul 18, 2025 C71T
CHANGE OF NAME/ADDRESS REC'D FROM IB
Jan 31, 2025 ADCH
COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Jan 1, 2024 REM3
NEW REPRESENTATIVE AT IB RECEIVED
Apr 9, 2022 NREP
FINAL DECISION TRANSACTION PROCESSED BY IB
May 3, 2019 FINO
FINAL DISPOSITION NOTICE SENT TO IB
Apr 11, 2019 FICS
FINAL DISPOSITION PROCESSED
Apr 11, 2019 FIMP
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Apr 1, 2019 FICR
REGISTERED-PRINCIPAL REGISTER
Jan 1, 2019 R.PR
POST PUBLICATION AMENDMENT - ENTERED
Nov 19, 2018 CHPB
ASSIGNED TO PETITION STAFF
Nov 15, 2018 APET
TEAS POST PUBLICATION AMENDMENT RECEIVED
Oct 24, 2018 EPPA
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Oct 16, 2018 NPUB
PUBLISHED FOR OPPOSITION
Oct 16, 2018 PUBO
NOTIFICATION PROCESSED BY IB
Oct 12, 2018 GPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Sep 26, 2018 OPNS
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Sep 26, 2018 NONP
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Sep 26, 2018 OP2R
APPROVED FOR PUB - PRINCIPAL REGISTER
Sep 12, 2018 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Sep 11, 2018 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 10, 2018 CRFA
TEAS REQUEST FOR RECONSIDERATION RECEIVED
Sep 10, 2018 ERFR
NOTIFICATION OF FINAL REFUSAL EMAILED
Mar 20, 2018 GNFN
FINAL REFUSAL E-MAILED
Mar 20, 2018 GNFR
FINAL REFUSAL WRITTEN
Mar 20, 2018 CNFR
TEAS/EMAIL CORRESPONDENCE ENTERED
Feb 28, 2018 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Feb 28, 2018 CRFA
ASSIGNED TO LIE
Feb 28, 2018 ALIE
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Feb 16, 2018 TROA
REFUSAL PROCESSED BY IB
Sep 15, 2017 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Aug 25, 2017 RFCS
REFUSAL PROCESSED BY MPU
Aug 25, 2017 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Aug 24, 2017 RFCR
NON-FINAL ACTION WRITTEN
Aug 23, 2017 CNRT
APPLICATION FILING RECEIPT MAILED
Aug 22, 2017 MAFR
ASSIGNED TO EXAMINER
Aug 18, 2017 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Aug 16, 2017 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Aug 10, 2017 REPR