PERFORMANCE ON TRACK
LIVE

Serial Number

79244766

Owner

voestalpine Rail Technology GmbH

Attorney

John Alumit

Filing Date

Jun 28, 2018

Add to watchlist:

No watchlists yet
View on USPTO

PERFORMANCE ON TRACK Trademark

Serial Number: 79244766 • Registration: 5905727

PERFORMANCE ON TRACK is a trademark filed by voestalpine Rail Technology GmbH on June 28, 2018. The trademark is classified under Class 6 (Metal Goods), Class 7 (Machinery), Class 9 (Computers & Electronics), Class 38 (Telecommunications), Class 39 (Transportation & Storage), Class 41 (Education & Entertainment), Class 42 (Computer & Scientific), Class 17 (Rubber Goods), Class 19 (Building Materials), Class 35 (Advertising & Business). The application is currently registered and active.

Owner Contact Info

voestalpine Rail Technology GmbH (6 trademarks)

Kerpelystraße 199

Entity Type: 99

voestalpine Schienen GmbH (7 trademarks)

Kerpelystraße 199

Entity Type: 99

voestalpine Railway Systems GmbH (3 trademarks)

Kerpelystra?e 199

Entity Type: 99

voestalpine VAE GmbH (2 trademarks)

Rotenturmstraße 5-9

Entity Type: 16

Trademark Details

Filing Date

June 28, 2018

Registration Date

November 12, 2019

Published for Opposition

August 27, 2019

Goods & Services

[ Education services, namely, providing classes, seminars and workshops in the field of railway design and construction; training in the field of railway design and construction; continuous training in the field of railway design and construction; advanced training services in the field of railway design and construction; providing of further training courses in the field of railway design and construction ]

[ Import-export agency services; sales promotion for others; the aforesaid services in particular in the field of foundry raw materials, iron, steel and their derivatives, foundry machineries, foundry furnaces and foundry products ]

[ Telecommunication services, namely, electronic transmission of messages, providing electronic message alerts via the internet, ISDN services; data communication services, namely, electronic data transmission ]

[ Measuring, signalling and checking apparatus and instruments, namely, computers, speed indicators, railway signals; railway traffic safety appliances, namely, railway signals; ] devices for monitoring the condition of railway switches in the nature of temperature sensors, humidity sensors; infrared sensors, proximity sensors, electronic wheel detection switches; [ electro-dynamic remote control apparatus for railway points; ] computer programs for monitoring and controlling of railway traffic safety appliances, for monitoring and controlling of switch diagnosis devices and switch drive or setting devices, and for monitoring the condition of railway switches [ ; signal transmission apparatus, namely, transmitters of electronic signals; electronic apparatus for the remote control of signals, namely, remote control for railway signals; data processing apparatus; radio-frequency identification (RFID) tags, radio-frequency identification (RFID) readers ]

Building materials, not of metal, namely, concrete poles, concrete slabs; railway sleepers, not of metal, concrete railway sleepers for fixed tracks for railway track systems; parts of concrete, namely, concrete beams, concrete floors, concrete blocks for fixed tracks for railway track systems; fixed tracks for railway track systems, namely, railway sleepers, not of metal; railway materials, not of metal, namely, railroad ties

[ Packaging and storage of goods ]

Rail support plates, namely, insulators for railway tracks

Scientific and technological services, namely, scientific research, analysis, and testing in the field of railway materials and railway design; industrial analysis in the nature of machine engineering analysis, and research services in the field of railway materials and railway design; [ technical testing of railway materials; ] design and development of computer hardware and software; engineering services; material testing; development and testing of rail parts, particularly switches, crossings, extension joints and parts thereof as well as actuators therefor, by order of a third party; [ realisation or accomplishment of technical tests, namely, material testing services of rail parts, particularly switches, crossings, extension joints and parts thereof as well as actuators therefor; ] software development for controlling of rail parts, particularly switches, crossings, extension joints and parts thereof as well as actuators therefor

[ Common metals and their alloys; cast iron, unwrought or semi-wrought; irons and steels, cast, rolled and hardened; bronze; ] metallic materials for railway tracks, namely, steel rails for rails of railway tracks, [ metal railway turntables, metal railway crossovers; ] railway steel, track superstructure parts, namely, metal tracks for rail vehicles, [ metal railway crossovers; ] rails of metal, bainitic rails of metal, switches in the nature of metal railway crossovers, metal railway turntables; and railway crossings in the nature of metal railway crossovers, metal railway turntables as well as structural parts thereof, metal slide chairs being parts of railway tracks; metal fasteners for railway tracks in the nature of metal switch clips and metal clips for fastening rails to railway tracks; metal check rails; rolling apparatus for tongue rails in the nature of rolled metal rails; frog points of metal being railway points; fish plates of metal for connecting railway tracks; expansion joints of metal for railway tracks, railway sleepers of metal, metal tracks for rail vehicles, switch drive in the nature of metal rods for railway tracks; setting devices in the nature of metal rods for railway tracks; devices for locking the position of switches in the nature of metal bolts; switch-lock devices, namely, metal locks for railway switches [ ; metal hardware, namely, bolts, nails, springs, washers, nuts, screws; rail fastenings of metal, in particular metal sleeper screws, metal coach screws, metal springs, metal washers, metal shims; bolts of metal; pipes of metal ]

[ Motors, other than for land vehicles; ] machine coupling and transmission components, except for land vehicles; electric, pneumatic and hydraulic drives for railway track superstructure parts, in particular for changing the position of switches [ ; hydraulic transmissions, other than for land vehicles; cranes, elevating apparatus, namely, elevators; track machining trains movable on rails in the nature of power-operated grinders for railway construction ]

Filing History

NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Mar 31, 2026 NA71
REGISTERED - PARTIAL SEC 71 ACCEPTED
Mar 31, 2026 71.P
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Mar 9, 2026 APRE
TEAS SECTION 71 RECEIVED
Nov 12, 2025 ES71
COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Nov 12, 2024 REM3
NEW REPRESENTATIVE AT IB RECEIVED
Jul 7, 2024 NREP
CHANGE OF NAME/ADDRESS REC'D FROM IB
Oct 9, 2020 ADCH
FINAL DECISION TRANSACTION PROCESSED BY IB
Apr 24, 2020 FINO
GENERIC MADRID TRANSACTION SENT TO IB
Mar 5, 2020 XXSS
GENERIC MADRID TRANSACTION CREATED
Mar 5, 2020 XXCR
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Feb 12, 2020 FICR
REGISTERED-PRINCIPAL REGISTER
Nov 12, 2019 R.PR
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Aug 27, 2019 NPUB
PUBLISHED FOR OPPOSITION
Aug 27, 2019 PUBO
NOTIFICATION PROCESSED BY IB
Aug 23, 2019 GPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Aug 7, 2019 OPNS
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Aug 7, 2019 OP2R
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Aug 7, 2019 NONP
ASSIGNED TO LIE
Jul 21, 2019 ALIE
APPROVED FOR PUB - PRINCIPAL REGISTER
Jul 12, 2019 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Jun 21, 2019 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 21, 2019 CRFA
TEAS REQUEST FOR RECONSIDERATION RECEIVED
Jun 21, 2019 ERFR
NOTIFICATION OF FINAL REFUSAL EMAILED
Apr 18, 2019 GNFN
FINAL REFUSAL E-MAILED
Apr 18, 2019 GNFR
FINAL REFUSAL WRITTEN
Apr 18, 2019 CNFR
TEAS/EMAIL CORRESPONDENCE ENTERED
Mar 29, 2019 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 29, 2019 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Mar 29, 2019 TROA
CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED
Mar 7, 2019 CORR
CORRECTION TRANSACTION RECEIVED FROM IB
Feb 22, 2019 CRCV
REFUSAL PROCESSED BY IB
Jan 5, 2019 RFNP
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Dec 15, 2018 RFCS
REFUSAL PROCESSED BY MPU
Dec 15, 2018 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Nov 17, 2018 RFCR
NON-FINAL ACTION WRITTEN
Nov 16, 2018 CNRT
APPLICATION FILING RECEIPT MAILED
Nov 13, 2018 MAFR
ASSIGNED TO EXAMINER
Nov 9, 2018 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Nov 9, 2018 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Nov 8, 2018 REPR