OBERMANN MAT
LIVE

Serial Number

90528835

Owner

BAUER MAT Slurry Handling Systems, branch of BAUER Maschinen GmbH

Attorney

Matthew B. Pinckney

First Use Date

May 12, 2022

Filing Date

Feb 15, 2021

Add to watchlist:

No watchlists yet
View on USPTO

OBERMANN MAT Trademark

Serial Number: 90528835 • Registration: 6896305

OBERMANN MAT is a trademark filed by BAUER MAT Slurry Handling Systems, branch of BAUER Maschinen GmbH on February 15, 2021. The trademark is classified under Class 7 (Machinery), Class 9 (Computers & Electronics). The application is currently registered and active.

Owner Contact Info

BAUER MAT Slurry Handling Systems, branch of BAUER Maschinen GmbH

Illerstrasse 6
Immenstadt (Seifen) 87509 , DE

Entity Type: 99

BAUER MAT Slurry Handling Systems

Illerstrasse 6
Immenstadt (Seifen) 87509 , DE

Entity Type: 99

Trademark Details

Filing Date

February 15, 2021

Registration Date

November 8, 2022

First Use Anywhere

May 12, 2022

First Use in Commerce

May 12, 2022

Published for Opposition

February 8, 2022

Goods & Services

Architect scales for use with construction equipment; measuring apparatuses for construction equipment for measuring flow rate, volume, pressure, particle size, and material compositions of liquid and semi-liquid building and construction materials; regulating apparatuses for construction equipment for regulating fluid flow mixing rate and separation rate of liquid and semi-liquid building and construction materials

Construction equipment for use with building materials in specialized civil engineering, namely, mixers, separators, pumps, and vacuum systems primarily comprised of vacuum machines and pumps; mixing machines and mixing installations for use in the building and construction industries, in particular continuous mixers and batch mixers; stationary and mobile mixing machines and installations for preparing building materials, in particular suspensions, concrete, mortar, and soil materials; agitators and stirrers as parts of machines, in particular for mixing machines and installations; housings in the nature of fitted covers as parts of machines for mixing installations; hydraulic pumps, centrifugal pumps and pumps being parts of machines, namely, hose pumps, centrifugal pumps, high-pressure piston pumps and high-pressure plunger pumps for pumping building materials; injection machines and installations for specialized civil engineering, in particular for drilling fluid, cavity filling and high-pressure injection; flushing machines and installations for preparing building and construction materials, in particular flushing liquids, support suspensions and flocculants; roll-up and winding machines for drive units in supply systems for building and construction materials; hydraulic pressure power generators, hydraulic power units and hydraulic power generating systems comprised primarily of the foregoing; decanter centrifuges incorporating screw conveyors; dispensing machine for building materials, namely, slurry and injectants

Filing History

NOTICE OF REGISTRATION CONFIRMATION EMAILED
Nov 8, 2022 NRCC
REGISTERED-PRINCIPAL REGISTER
Nov 8, 2022 R.PR
NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
Oct 5, 2022 SUNA
ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
Oct 4, 2022 CNPR
STATEMENT OF USE PROCESSING COMPLETE
Sep 7, 2022 SUPC
CASE ASSIGNED TO INTENT TO USE PARALEGAL
Sep 7, 2022 AITU
USE AMENDMENT FILED
Aug 23, 2022 IUAF
TEAS STATEMENT OF USE RECEIVED
Aug 23, 2022 EISU
NOA E-MAILED - SOU REQUIRED FROM APPLICANT
Apr 5, 2022 NOAM
POST PUBLICATION AMENDMENT - ENTERED
Feb 8, 2022 CHPB
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Feb 8, 2022 NPUB
PUBLISHED FOR OPPOSITION
Feb 8, 2022 PUBO
ASSIGNED TO PETITION STAFF
Jan 25, 2022 APET
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jan 19, 2022 NONP
TEAS POST PUBLICATION AMENDMENT RECEIVED
Jan 10, 2022 EPPA
APPROVED FOR PUB - PRINCIPAL REGISTER
Jan 4, 2022 CNSA
EXAMINER'S AMENDMENT ENTERED
Jan 4, 2022 XAEC
NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Jan 4, 2022 GNEN
EXAMINERS AMENDMENT E-MAILED
Jan 4, 2022 GNEA
EXAMINERS AMENDMENT -WRITTEN
Jan 4, 2022 CNEA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
Sep 12, 2021 GNRN
NON-FINAL ACTION E-MAILED
Sep 12, 2021 GNRT
NON-FINAL ACTION WRITTEN
Sep 12, 2021 CNRT
ASSIGNED TO EXAMINER
Sep 10, 2021 DOCK
PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED
Jul 13, 2021 AMPX
ASSIGNED TO LIE
Jul 12, 2021 ALIE
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
May 18, 2021 NWOS
TEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED
May 12, 2021 TAEA
TEAS VOLUNTARY AMENDMENT RECEIVED
May 12, 2021 PARI
TEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED
Mar 16, 2021 TAEA
TEAS VOLUNTARY AMENDMENT RECEIVED
Mar 16, 2021 PARI
NEW APPLICATION ENTERED
Feb 18, 2021 NWAP