MY LODGE CONSTRUIRE EST DANS VOTRE NATURE
LIVE

Serial Number

79316022

Owner

VALEURS ALPINES

Attorney

Matthew A. Homyk

Filing Date

Apr 13, 2021

Add to watchlist:

No watchlists yet
View on USPTO

MY LODGE CONSTRUIRE EST DANS VOTRE NATURE Trademark

Serial Number: 79316022 • Registration: 6886517

MY LODGE CONSTRUIRE EST DANS VOTRE NATURE is a trademark filed by VALEURS ALPINES on April 13, 2021. The trademark is classified under Class 37 (Building & Construction), Class 42 (Computer & Scientific), Class 19 (Building Materials). The application is currently registered and active.

Owner Contact Info

VALEURS ALPINES

19 route du Cret des Vy

Entity Type: 99

Trademark Details

Filing Date

April 13, 2021

Registration Date

November 1, 2022

Published for Opposition

August 16, 2022

Goods & Services

Construction consultancy; building construction; furniture maintenance; maintenance of swimming pools; construction information services; installation of doors and windows; providing home repair information; machinery installation, maintenance and repair; elevator installation and repair; heating equipment installation and repair; irrigation devices installation and repair; scaffolding repair; masonry; cleaning of building exterior surface; installation of building insulation; building sealing services; construction of buildings and other structures, namely, office buildings, residential and commercial buildings; construction and maintenance of apartments, studio apartments, bungalows, villas and cottages; repair or maintenance of machines and apparatus for woodworking; construction, maintenance and repair of transportable and prefabricated buildings

Interior design; engineering services, particularly technical project planning and design engineering of lines for the processing of web products; architectural consultancy; consulting services in the fields of energy measurement to improve energy efficiency; testing of materials; construction drafting; drafting of construction plans for recreation premises; urban planning design services; engineering services, particularly technical project planning and design engineering of lines for the processing of web products for construction projects; consulting in the fields of engineering and architecture in the field of modular buildings; architectural services for design of buildings, namely, for modular buildings; design and development of architectural computer software

Concrete; non-metallic shielding, namely, glass for building purposes, namely, non-metallic radiation-shielding glass panes; building lumber; bricks; framework for building, not of metal; window frames not of metal; door frames being casings, not of metal; cement; partitions not of metal for building; building panels, not of metal; transportable buildings not of metal; roof coverings, not of metal; slabs not of metal for building; scaffolding, not of metal; concrete building elements, namely, concrete walls for building; windows not of metal; marble being building materials; construction materials not of metal, namely, non-metallic materials for the construction of floors, roofs, and walls; moldings for building not of metal, namely, non-metal decorative moldings and decorative trim for use in building construction; non-metal palisades; non-metal roofing panels, for building; building stones; non-metal swimming pools; roofing tiles not of metal; building glass; shutters not of metal; beams, not of metal; modular buildings not of metal, particularly, stables, greenhouses, silos, shelters and shelters for animals; modular homes not of metal; modular decking not of metal being floor coverings, namely, modular plastic decking to serve as a ground cover

Filing History

NEW REPRESENTATIVE AT IB RECEIVED
Jul 9, 2026 NREP
FINAL DECISION TRANSACTION PROCESSED BY IB
Apr 12, 2023 FINO
GENERIC MADRID TRANSACTION SENT TO IB
Feb 22, 2023 XXSS
GENERIC MADRID TRANSACTION CREATED
Feb 22, 2023 XXCR
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Feb 1, 2023 FICR
NOTIFICATION PROCESSED BY IB
Dec 28, 2022 GPNX
NOTICE OF REGISTRATION CONFIRMATION EMAILED
Nov 1, 2022 NRCC
REGISTERED-PRINCIPAL REGISTER
Nov 1, 2022 R.PR
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Aug 16, 2022 NPUB
PUBLISHED FOR OPPOSITION
Aug 16, 2022 PUBO
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jul 27, 2022 OPNS
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jul 27, 2022 NONP
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Jul 27, 2022 OP2R
APPROVED FOR PUB - PRINCIPAL REGISTER
Jul 12, 2022 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Jul 4, 2022 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 4, 2022 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Jul 4, 2022 TROA
REFUSAL PROCESSED BY IB
Jan 23, 2022 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jan 6, 2022 RFCS
REFUSAL PROCESSED BY MPU
Jan 6, 2022 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Dec 15, 2021 RFCR
NON-FINAL ACTION WRITTEN
Dec 14, 2021 CNRT
ASSIGNED TO EXAMINER
Dec 4, 2021 DOCK
NEW REPRESENTATIVE AT IB RECEIVED
Oct 21, 2021 NREP
APPLICATION FILING RECEIPT MAILED
Aug 4, 2021 MAFR
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jul 31, 2021 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Jul 22, 2021 REPR