MPC MULTI PITCH CONTROLLER
LIVE

Add to watchlist:

No watchlists yet
View on USPTO

MPC MULTI PITCH CONTROLLER Trademark

Serial Number: 79086577 • Registration: 4011018

MPC MULTI PITCH CONTROLLER is a trademark filed by SSB Wind Systems GmbH & Co. KG on April 17, 2010. The trademark is classified under Class 7 (Machinery), Class 9 (Computers & Electronics), Class 37 (Building & Construction), Class 38 (Telecommunications), Class 42 (Computer & Scientific). The application is currently registered and active.

Owner Contact Info

SSB Wind Systems GmbH & Co. KG (16 trademarks)

Neuenkirchener Straße 13

Entity Type: 98

Nidec SSB Wind Systems GmbH (11 trademarks)

Neuenkirchener Straße 13

Entity Type: 16

Trademark Details

Filing Date

April 17, 2010

Registration Date

August 16, 2011

Published for Opposition

May 31, 2011

Cancellation Date

April 18, 2020

Goods & Services

[ stored computer operating programs; stored computer programs for remote interrogation of wind power plants; stored computer programs for remote control of wind power plants; stored computer programs for remote monitoring of wind power plants; stored computer programs for remote access to wind power plants; stored computer programs for control of wind power plants; stored computer programs for remote interrogation, remote control and remote monitoring of wind power plants; stored computer programs for remote access to and control of wind power plants; computer programs for remote interrogation of wind turbines; computer programs for remote control of wind turbines; computer programs for remote monitoring of wind turbines; computer programs for remote access to wind turbines; computer programs for control of wind turbines; downloadable computer programs for remote interrogation of wind power plants; downloadable computer programs for remote control of wind power plants; downloadable computer programs for remote monitoring of wind power plants; computer programs for remote access to wind power plants; downloadable computer programs for control of wind power plants; downloadable computer programs for remote interrogation, remote control and remote monitoring of wind power plants; downloadable computer programs for remote access to and control of wind power plants; stored computer programs for controlling machines, motors, manufacturing facilities, as well as facilities for energy generation; interface hardware and stored* software for computers for use in connection with wind turbines; electrical systems comprised of electrical conductors, electrical controllers and electrical circuit boards for remote control of industrial work processes; ] electrical control devices for remote interrogation of wind turbines; electrical control devices for remote control of wind turbines; electrical control devices for remote monitoring of wind turbines; electrical control devices for remote access to wind turbines; electrical control devices for control of wind turbines [ ; electrical converters; electrical frequency converters; electrical power converters; computer monitors; computer programs for monitoring power generation; electrical switchgears; electrical control desks comprised primarily of electrical control panels and electronic indicator panels; electrical switch cabinets; electrical switch cabinets for wind turbines; electrical switchboards; printed circuits; electric current rectifiers; current transformers; electrical distribution cabinets; electrical distribution boards ]

[ Driving motors, except for land vehicles; electric drives, except for land vehicles, namely, electric drives for adjusting rotor blades of wind turbines and electric drives for adjusting propellers of wind turbines; electric motors, except for land vehicles; electric generators; transmissions for machines, except for land vehicles; clutches in the nature of linkages for power transmission, except for land vehicles; hydraulic control units for machines or motors; pneumatic control units for machines or motors; electricity generators; power generators for wind turbines; adjustment systems for adjusting the pitch angle of rotor blades of wind turbines, essentially consisting of drives, transmissions, pressure switch and hydraulic control units or pneumatic control units for machines and motors; alternators ]

[ Providing access to computer programs in data networks; providing access to the Internet; providing telecommunications connections to the internet; providing access to data bases ]

[ Remote maintenance of wind turbines; installation, maintenance and repair services of machines, namely, wind turbines and wind farm machinery; installation and repair services of wind turbines; installation of technical extensions, improvements and upgrades at wind turbines; maintenance and servicing of wind turbines ]

[ Technological services for the planning of electric drives, in particular for wind turbines ]

Filing History

NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED
Nov 7, 2020 DENC
DEATH OF INTERNATIONAL REGISTRATION
Nov 7, 2020 DETH
COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
Aug 16, 2020 REM4
IRREGULARITY ON INVALIDATION RECEIVED FROM IB
Jul 6, 2020 IRIV
PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Jun 25, 2020 INPS
INVALIDATION PROCESSED
Jun 25, 2020 INPC
PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Jun 1, 2020 INPR
NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
Oct 1, 2019 NA75
REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.
Oct 1, 2019 C75P
TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Sep 29, 2019 EROP
NEW REPRESENTATIVE AT IB RECEIVED
Sep 26, 2019 NREP
INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE
May 23, 2019 INNA
PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
May 5, 2019 INPR
CHANGE OF OWNER RECEIVED FROM IB
May 2, 2019 CHLD
POST REGISTRATION ACTION MAILED - SEC. 71 & 15
Apr 1, 2019 PR75
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Mar 28, 2019 APRE
TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Mar 21, 2019 EROP
POST REGISTRATION ACTION MAILED - SEC. 71 & 15
Sep 21, 2018 PR75
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Sep 11, 2018 APRE
AMENDMENT UNDER SECTION 7 - PROCESSED
Sep 5, 2018 A7OK
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Aug 30, 2018 APRE
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Aug 20, 2018 APRE
TEAS SECTION 7 REQUEST RECEIVED
Aug 6, 2018 ES7R
TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Aug 6, 2018 EROP
POST REGISTRATION ACTION MAILED - SEC. 71 & 15
Feb 7, 2018 PR75
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jan 25, 2018 APRE
TEAS SECTION 71 & 15 RECEIVED
Jan 12, 2018 ES75
FINAL DECISION TRANSACTION PROCESSED BY IB
Mar 5, 2012 FINO
FINAL DISPOSITION NOTICE SENT TO IB
Feb 13, 2012 FICS
FINAL DISPOSITION PROCESSED
Feb 13, 2012 FIMP
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Nov 16, 2011 FICR
REGISTERED-PRINCIPAL REGISTER
Aug 16, 2011 R.PR
NOTIFICATION PROCESSED BY IB
Jul 20, 2011 GPNX
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
May 31, 2011 NPUB
PUBLISHED FOR OPPOSITION
May 31, 2011 PUBO
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
May 11, 2011 OPNS
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
May 11, 2011 OP2R
LAW OFFICE PUBLICATION REVIEW COMPLETED
Apr 27, 2011 PREV
ASSIGNED TO LIE
Apr 26, 2011 ALIE
APPROVED FOR PUB - PRINCIPAL REGISTER
Apr 12, 2011 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Mar 30, 2011 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 30, 2011 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Mar 30, 2011 TROA
REFUSAL PROCESSED BY IB
Oct 24, 2010 RFNT
APPLICATION FILING RECEIPT MAILED
Oct 2, 2010 MAFR
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Oct 1, 2010 RFCS
REFUSAL PROCESSED BY MPU
Oct 1, 2010 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Oct 1, 2010 RFCR
NON-FINAL ACTION WRITTEN
Sep 30, 2010 CNRT
ASSIGNED TO EXAMINER
Sep 28, 2010 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Sep 28, 2010 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Sep 23, 2010 REPR