JUWI
LIVE

Serial Number

79084216

Owner

JUWI GmbH

Attorney

Thilo C. Agthe

Filing Date

Mar 8, 2010

Add to watchlist:

No watchlists yet
View on USPTO

JUWI Trademark

Serial Number: 79084216 • Registration: 4219861

JUWI is a trademark filed by JUWI GmbH on March 8, 2010. The trademark is classified under Class 4 (Lubricants & Fuels), Class 7 (Machinery), Class 9 (Computers & Electronics), Class 11 (Environmental Control), Class 36 (Insurance & Financial), Class 37 (Building & Construction), Class 39 (Transportation & Storage), Class 40 (Treatment & Processing), Class 41 (Education & Entertainment), Class 42 (Computer & Scientific), Class 45 (Legal & Security Services), Class 35 (Advertising & Business). The application is currently registered and active.

Owner Contact Info

JUWI GmbH (3 trademarks)

Energie-Allee 1

Entity Type: 03

juwi Holding AG

Energie-Allee 1

Entity Type: 99

Trademark Details

Filing Date

March 8, 2010

Registration Date

October 9, 2012

Published for Opposition

July 24, 2012

Goods & Services

[ Providing of training in the fields of the energy management, renewable energies, solar energy, wind power, biogas energy, geothermal energy, hydro power, pump storage energy and sustainable development; providing of training and workshops in the fields of the manufacture, installation and repair of power-generating apparatus; publication of books and brochures in the fields of energy management, renewable energies, solar energy, wind power, biogas energy, geothermal energy, hydro power, pump storage energy and sustainable development; arranging and conducting educational conferences, meetings, and seminars in the fields of energy management, renewable energies, solar energy, wind power, biogas energy, geothermal energy, hydro power, pump storage energy and sustainable development ]

[ Soil processing and treatment; environmental remediation services in the nature of treatment of topsoil and other nutritious soil; treatment of waste, in particular the conversion of waste in the ground; processing and treatment of wood, oil, gas, natural resources and fuels for the generation of energy and current; assembly of vehicles and electric vehicles for others; electricity generation; power generation through the use of water; power generation through the use of geothermal energy ]

[Electronic sensors for measuring solar radiation; apparatus and instruments for generating, distributing or accumulating electricity, namely, electric power supplies; apparatus and instruments for the supervision, remote control, checking and measuring of electricity and energy consumption and for the operation of power stations, namely, remote control software and hardware, instruments for measuring electricity and energy consumption, and energy meters; apparatus and instruments for transforming electricity, namely, electric voltage transformer; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, rechargeable batteries and switchgears; apparatus for analyzing signals, current and voltage, namely, electronic monitors and monitor modules for monitoring electric current and electrical signals and voltage monitor modules; apparatus for overvoltage protection against lightning strikes, namely, voltage surge protectors; electric cables, electric connection equipment, namely, electric connectors, electric transformers for the distribution and generation of electricity and energy; solar cells; photovoltaic modules; data processing equipment, namely, data processors, software and recorded computer programs for use in the generation, distribution, storage and control of energy and electricity]

[ Electrical power generators using solar cells; wind mills, wind power plants, wind turbines and other wind-operated machines, namely, wind turbines; spare parts and accessories for the aforesaid goods, namely, wind turbine towers and masts, rotor blades, rotor hubs, housings, machine foundations, rotation device, yaw rings and gearboxes; replacement parts and accessories for the aforesaid goods]

[Utility services, namely, transmission and distribution of electricity; utility services, namely, transmission and distribution of electricity and electrical energy; information services with regard to the aforesaid services]

[ Wood-based fuels, in particular wood pellets ]

Construction of power stations, [windmills, wind farms, wind turbines and other wind-powered machines, biogas installations,] solar installations, photovoltaic installations, [geothermal installations, hydroelectric power stations,] pump storage installations; [construction of charging and service stations for electric vehicles;] installation of photovoltaic installations, solar thermal installations, windmills, wind farms, wind turbines, [other wind-powered machines, biogas installations,] [geothermal power plants, hydroelectric power stations,] [pump storage systems] maintenance and repair of photovoltaic installations, solar thermal installations, windmills, wind farms, wind turbines, other wind-powered machines, biogas installations, [geothermal power plants, hydroelectric power stations,] pump storage systems; installation, maintenance and repair of power stations and power station systems, and installation, maintenance and repair of electrical equipment; construction of power stations; construction of charging and service stations for electric vehicles; consultancy and information in connection with all the aforesaid services

[Insurance administration, financial affairs, namely, financial consulting, monetary affairs, namely, monetary exchange, real estate brokerage;] real estate procurement for others, namely, procurement of suitable sites for power stations

[Business management for the energy sector; advertising agencies; business management in the field of energy; providing office functions in the energy sector;] professional business management and commercial management of the financing, construction and operational management of power stations, windmills, wind farms, wind turbines and other wind-powered machines, [biogas installations,] solar installations and photovoltaic installations, [geothermal installations, hydroelectric power stations,] pump storage installations

[ Legal consultancy with regard to energy projects; legal services, namely, providing legal assistance with regard to approval procedures for power stations ]

[Heating equipment, namely, boilers, fermenters, being parts of biogas installations; fireplaces; solar thermal installations, namely, solar thermal modules, photovoltaic installations, namely, photovoltaic-based plants, geothermal installations, namely, geothermal-based HVAC units, hydro-electric power plants; pump storage installations, namely, hydrogen generators; waste processing plants]

Technical planning of photovoltaic installations, solar installations, windmills, wind farms, wind turbines, other wind-powered machines, [biogas installations, geothermal installations,] hydroelectric power stations [, pump storage installations and power stations] ; technical consultancy with regard to development and design of photovoltaic installations, solar installations, windmills, wind farms, wind turbines, other wind-powered machines, [biogas installations, geothermal installations,] hydroelectric power stations [, pump storage installations and power stations]; development of power stations, specialist engineering services and consultancy in the field of engineering; [research and development of new products in the field of renewable energies; geological calculations for the extraction of natural resources for the generation of energy and energy products; preparation of technical reports regarding the optimization of the production of renew able energy and the energy saving, and product development in the power and energy section; research and consultancy in the field of environmental protection and environmental impact assessment with regard to power stations and the energy sector; technical monitoring of the energy performance of apparatus, installations and buildings; development of technical materials, namely, drafting of construction plans used to construct photovoltaic installations, solar installations, windmills, wind farms, wind turbines, other wind-powered machines, biogas installations, geothermal installations, hydroelectric power stations, pump storage installations and power stations all in the energy sector;] design of power stations, windmills, wind farms, wind turbines and other wind-powered machines, [biogas installations,] solar installations, photovoltaic installations, [geothermal installations, hydroelectric power stations,] pump storage installations [; design of vehicles and electric vehicles; design of charging and service stations for electric vehicles; measurement evaluations in the fields of wind power, biogas and solar energy systems]

Filing History

PARTIAL INVALIDATION PROCESSED BY THE IB
Nov 29, 2024 INNP
PARTIAL INVALIDATION PROCESSED BY THE IB
Nov 23, 2024 INNP
PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Oct 11, 2024 INPS
INVALIDATION PROCESSED
Oct 9, 2024 INPC
PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Oct 1, 2024 INPR
GENERIC MADRID TRANSACTION SENT TO IB
Aug 20, 2024 XXSS
GENERIC MADRID TRANSACTION CREATED
Aug 20, 2024 XXCR
PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Aug 9, 2024 INPR
NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Dec 8, 2023 NA71
REGISTERED - PARTIAL SEC 71 ACCEPTED
Dec 8, 2023 71.P
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Nov 16, 2023 APRE
NEW REPRESENTATIVE AT IB RECEIVED
Jul 28, 2023 NREP
TEAS SECTION 71 RECEIVED
Apr 10, 2023 ES71
CHANGE OF NAME/ADDRESS REC'D FROM IB
Oct 29, 2022 ADCH
COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
Oct 9, 2021 REM4
INTERNATIONAL REGISTRATION RENEWED
Mar 26, 2020 RNWL
CHANGE OF NAME/ADDRESS REC'D FROM IB
Feb 20, 2020 ADCH
PARTIAL INVALIDATION PROCESSED BY THE IB
Oct 18, 2019 INNP
NEW REPRESENTATIVE AT IB RECEIVED
Sep 5, 2019 NREP
PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Jul 18, 2019 INPS
INVALIDATION PROCESSED
Jul 18, 2019 INPC
PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Jun 22, 2019 INPR
NEW REPRESENTATIVE AT IB RECEIVED
Apr 19, 2019 NREP
NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Oct 22, 2018 NA71
REGISTERED - PARTIAL SEC 71 ACCEPTED
Oct 22, 2018 71.P
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Oct 17, 2018 APRE
TEAS SECTION 71 RECEIVED
Oct 8, 2018 ES71
FINAL DECISION TRANSACTION PROCESSED BY IB
Feb 19, 2013 FINO
FINAL DISPOSITION NOTICE SENT TO IB
Jan 28, 2013 FICS
FINAL DISPOSITION PROCESSED
Jan 28, 2013 FIMP
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Jan 9, 2013 FICR
NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Oct 24, 2012 OPNX
REGISTERED-PRINCIPAL REGISTER
Oct 9, 2012 R.PR
NOTIFICATION PROCESSED BY IB
Sep 22, 2012 GPNX
PUBLISHED FOR OPPOSITION
Jul 24, 2012 PUBO
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jul 4, 2012 OPNS
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Jul 4, 2012 OP2R
NOTICE OF PUBLICATION
Jul 4, 2012 NPUB
LAW OFFICE PUBLICATION REVIEW COMPLETED
Jun 20, 2012 PREV
EXAMINERS AMENDMENT MAILED
Jun 19, 2012 CNEA
APPROVED FOR PUB - PRINCIPAL REGISTER
Jun 19, 2012 CNSA
EXAMINER'S AMENDMENT ENTERED
Jun 19, 2012 XAEC
EXAMINERS AMENDMENT -WRITTEN
Jun 19, 2012 CNEA
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Dec 28, 2011 OPNS
NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Dec 28, 2011 OPNR
CONTINUATION OF FINAL REFUSAL MAILED
Nov 22, 2011 CNCF
ACTION CONTINUING A FINAL - COMPLETED
Nov 21, 2011 CNCF
AMENDMENT FROM APPLICANT ENTERED
Oct 31, 2011 ACEC
CORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 31, 2011 CRFA
PAPER RECEIVED
Oct 24, 2011 MAIL
NOTICE OF UNRESPONSIVE AMENDMENT - MAILED
Sep 6, 2011 NAUD
REPORT UNRESPONSIVE AMENDMENT - COMPLETED
Sep 3, 2011 NAUD
AMENDMENT FROM APPLICANT ENTERED
Aug 23, 2011 ACEC
CORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 23, 2011 CRFA
PAPER RECEIVED
Aug 17, 2011 MAIL
FINAL REFUSAL MAILED
Apr 28, 2011 CNFR
FINAL REFUSAL WRITTEN
Apr 27, 2011 CNFR
AMENDMENT FROM APPLICANT ENTERED
Apr 7, 2011 ACEC
CORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 7, 2011 CRFA
ASSIGNED TO LIE
Feb 2, 2011 ALIE
PAPER RECEIVED
Jan 27, 2011 MAIL
PAPER RECEIVED
Jan 24, 2011 MAIL
REFUSAL PROCESSED BY IB
Aug 28, 2010 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jul 27, 2010 RFCS
REFUSAL PROCESSED BY MPU
Jul 27, 2010 RFRR
APPLICATION FILING RECEIPT MAILED
Jul 27, 2010 MAFR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jul 27, 2010 RFCR
NON-FINAL ACTION WRITTEN
Jul 26, 2010 CNRT
ASSIGNED TO EXAMINER
Jul 23, 2010 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jul 23, 2010 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Jul 22, 2010 REPR