INTELECT INTELLIGENT ELECTRIFICATION
LIVE

Serial Number

97081228

Owner

IntElect Inc.

Attorney

Timothy P. Naill

Filing Date

Oct 19, 2021

Add to watchlist:

No watchlists yet
View on USPTO

INTELECT INTELLIGENT ELECTRIFICATION Trademark

Serial Number: 97081228

INTELECT INTELLIGENT ELECTRIFICATION is a trademark filed by IntElect Inc. on October 19, 2021. The trademark is classified under Class 9 (Computers & Electronics), Class 38 (Telecommunications), Class 40 (Treatment & Processing), Class 42 (Computer & Scientific), Class 45 (Legal & Security Services), Class 35 (Advertising & Business). The application is currently pending registration.

Owner Contact Info

IntElect Inc.

1715 Northrock Court
Rockford, IL 61103

Entity Type: 03

Trademark Details

Filing Date

October 19, 2021

Registration Date

Not Registered

Published for Opposition

August 1, 2023

Goods & Services

Business services related to the performance and management of powered work platforms, namely, riding mowers, standing mowers, sprayers, spreaders, mini-excavators, wheeled skid-steer machines, tracked skid-steer machines, lifts, snowblowers, snow sweepers; retail store services featuring hybrid power source that generates electric power from an engine-mounted generator and captures and extracts energy with an on-board battery or capacitor

Engineering services in the field of electrification of vehicles; Software engineering services related to the performance and management of powered work platforms, namely, small off-road equipment, namely, riding mowers, standing mowers, sprayers, spreaders, mini-excavators, wheeled skid-steer machines, tracked skid-steer machines, lifts, snowblowers, snow sweepers; Cloud storage services for electronic data

Electric motor controllers for permanent magnet and induction motor applications of vehicles; controllers for vehicles for vehicle operation monitoring, namely, sensors and wireless communication; controllers for vehicles that provide hybrid electrification, namely, series or parallel hybrid capability controllers that receive and process all operator command and interlock signals to control all vehicle functions and communicate performance data through vehicle CAN Bus power bus and variable AC input to the generator for torque addition or engine start and manages DC bus voltage for safe and reliable storage and maximum life and controls all engine functions including start and stop and speed control and manages engine output for optimum fuel economy with minimal emissions, permits secure supervisory control to adapt to operator skills; a vehicle control and monitoring system providing a networked vehicle electrification for the vehicle, the system including electric motor controllers for permanent magnet and induction motor applications of vehicles, controllers for vehicles for vehicle operation monitoring, namely, sensors and wireless communication and controllers for vehicles that provide hybrid electrification and include series or parallel hybrid capability and receive and process all operator command and interlock signals to control all vehicle functions and communicate performance data through vehicle CAN Bus power bus and variable AC input to the generator for torque addition or engine start and manages DC bus voltage for safe and reliable storage and maximum life and controls all engine functions including start and stop and speed control and manages engine output for optimum fuel economy with minimal emissions, permits secure supervisory control to adapt to operator skills; power supplies in the nature of hybrid power source that generates electric power from an engine-mounted generator and captures and extracts energy with an on-board battery or capacitor; medium voltage power distribution featuring a hybrid power source that generates electric power from an engine-mounted generator and captures and extracts energy with an on-board battery or capacitor

Provision of regulatory compliance information, namely, provide users with a record of operator actions, machine health, operational efficiencies, incident reconstruction and regulatory compliance

Providing connectivity utilizing a communication portal communicating data from the work platform to cloud storage and analysis

Generation of power featuring hybrid power source that generates electric power from an engine-mounted generator and captures and extracts energy with an on-board battery or capacitor

Filing History

SOU TEAS EXTENSION RECEIVED
Mar 25, 2026 EEXT
NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Sep 26, 2025 EXRA
SOU EXTENSION 4 GRANTED
Sep 25, 2025 EX4G
SOU EXTENSION 4 FILED
Sep 25, 2025 EXT4
SOU TEAS EXTENSION RECEIVED
Sep 25, 2025 EEXT
NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Mar 25, 2025 EXRA
SOU EXTENSION 3 GRANTED
Mar 24, 2025 EX3G
SOU EXTENSION 3 FILED
Mar 24, 2025 EXT3
SOU TEAS EXTENSION RECEIVED
Mar 24, 2025 EEXT
NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Sep 23, 2024 EXRA
SOU EXTENSION 2 GRANTED
Sep 23, 2024 EX2G
SOU EXTENSION 2 FILED
Sep 23, 2024 EXT2
SOU TEAS EXTENSION RECEIVED
Sep 23, 2024 EEXT
NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Mar 20, 2024 EXRA
SOU EXTENSION 1 GRANTED
Mar 19, 2024 EX1G
SOU EXTENSION 1 FILED
Mar 19, 2024 EXT1
SOU TEAS EXTENSION RECEIVED
Mar 19, 2024 EEXT
NOA E-MAILED - SOU REQUIRED FROM APPLICANT
Sep 26, 2023 NOAM
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Aug 1, 2023 NPUB
PUBLISHED FOR OPPOSITION
Aug 1, 2023 PUBO
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jul 12, 2023 NONP
APPROVED FOR PUB - PRINCIPAL REGISTER
Jun 26, 2023 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Jun 9, 2023 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 9, 2023 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Jun 9, 2023 TROA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
Mar 14, 2023 GNRN
NON-FINAL ACTION E-MAILED
Mar 14, 2023 GNRT
NON-FINAL ACTION WRITTEN
Mar 14, 2023 CNRT
PREVIOUS ALLOWANCE COUNT WITHDRAWN
Mar 7, 2023 ZZZX
WITHDRAWN FROM PUB - OG REVIEW QUERY
Feb 28, 2023 PBCR
APPROVED FOR PUB - PRINCIPAL REGISTER
Feb 14, 2023 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Jan 10, 2023 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jan 10, 2023 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Jan 10, 2023 TROA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
Aug 11, 2022 GNRN
NON-FINAL ACTION E-MAILED
Aug 11, 2022 GNRT
NON-FINAL ACTION WRITTEN
Aug 11, 2022 CNRT
ASSIGNED TO EXAMINER
Jul 26, 2022 DOCK
PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED
May 27, 2022 AMPX
ASSIGNED TO LIE
May 26, 2022 ALIE
TEAS VOLUNTARY AMENDMENT RECEIVED
May 19, 2022 PARI
NOTICE OF DESIGN SEARCH CODE E-MAILED
Nov 6, 2021 MDSC
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Nov 5, 2021 NWOS
NEW APPLICATION ENTERED
Oct 22, 2021 NWAP