HARBRIX
LIVE

Serial Number

79439279

Owner

Jenner Innovation Pty Ltd

Attorney

Allison R. Imber, Esq.

Filing Date

Oct 1, 2025

Add to watchlist:

No watchlists yet
View on USPTO

HARBRIX Trademark

Serial Number: 79439279

HARBRIX is a trademark filed by Jenner Innovation Pty Ltd on October 1, 2025. The trademark is classified under Class 19 (Building Materials). The application is currently pending registration.

Owner Contact Info

Jenner Innovation Pty Ltd (2 trademarks)

4 Allen Rd

Entity Type: 99

Trademark Details

Filing Date

October 1, 2025

Registration Date

Not Registered

Goods & Services

Non-metallic structures or buildings, namely temporary, permanent or transportable structures or buildings for transportable housing in the nature of prefabricated housing and building units made of timber; non-metallic access platforms, work platforms, and scaffolding made of timber; access platforms, work platforms, and scaffolding made principally of wood; support structures made principally of wood or; non-metallic cargo retention structures (dunnage) made of timber; non-metallic structures for packing and support for sea, air and road freight made of timber; bearings not of metal, namely, structural supports for use in building made of timber; non-metallic building materials made of timber, namely, timber piles, filler slab, tile, posts, struts, rakers, ledgers, fencing, bracers, coupling pins, boards, brackets, frames, spacers, plates, transoms, rails, platforms, hatches, bracing, anchors, gates, timber and lumber, couplers, joints, decking, scaffolds, stairs, crosses, bases, made principally of wood for constructing foundations or supports for scaffolding, cranes, hydraulic jacks and other machinery and vehicles; non-metallic brickwork supports made of timber; non-metallic gutter supports made of timber; non-metallic structural support members, namely nonmetallic structural support members for use in dry dock construction and repair of ships, and non-metallic structural support members for use in underground construction, made of timber; non-metallic secondary standing supports made of timber; non-metallic foundation materials for use in building, namely, timber piles, filler slab, tile, posts, struts, rakers, ledgers, fencing, bracers, coupling pins, boards, brackets, frames, spacers, plates, transoms, rails, platforms, hatches, bracing, anchors, gates, timber and lumber, couplers, joints, decking, scaffolds, stairs, crosses, bases, all made of timber; non-metallic foundation materials, namely, timber piles, filler slab, tile, posts, struts, rakers, ledgers, fencing, bracers, coupling pins, boards, brackets, frames, spacers, plates, transoms, rails, platforms, hatches, bracing, anchors, gates, timber and lumber, couplers, joints, decking, scaffolds, stairs, crosses, bases, for use in construction, all made of timber; non-metallic support fixings for building structures, made of timber; parapet supports made of timber, not of metal; pontoon supports of non-metallic materials, namely, brackets, deckings, crossmembers, beams, bulkheads, railings, bracers, pontoons, deck-cleats, cross-channels, sidewalks, runner boards, paneling, risers, all made of timber; non-metallic earth retaining structures made of timber; non-metallic retaining walls made of timber; floating docks made of timber, not of metal, for mooring boats; non-metallic fencing made of timber

Filing History

TEAS/EMAIL CORRESPONDENCE ENTERED
Apr 7, 2026 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 7, 2026 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Apr 7, 2026 TROA
ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
Apr 6, 2026 ARAA
TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Apr 6, 2026 REAP
APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Apr 6, 2026 CHAN
TEAS CHANGE OF OWNER ADDRESS RECEIVED
Apr 6, 2026 COAR
REFUSAL PROCESSED BY IB
Apr 2, 2026 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Mar 7, 2026 RFCS
REFUSAL PROCESSED BY MPU
Mar 7, 2026 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Feb 6, 2026 RFCR
NON-FINAL ACTION WRITTEN
Feb 5, 2026 CNRT
ASSIGNED TO EXAMINER
Feb 5, 2026 DOCK
APPLICATION FILING RECEIPT MAILED
Jan 12, 2026 MAFR
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jan 12, 2026 NWOS
LIMITATION FROM ORIGINAL APPLICATION ENTERED
Jan 11, 2026 LIMI
SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB
Dec 11, 2025 SDRC