GRID-ENSURE
LIVE

Serial Number

79380836

Owner

Hitachi Energy Ltd

Attorney

Molly Buck Richard

Filing Date

Jun 2, 2023

Add to watchlist:

No watchlists yet
View on USPTO

GRID-ENSURE Trademark

Serial Number: 79380836 • Registration: 7741428

GRID-ENSURE is a trademark filed by Hitachi Energy Ltd on June 2, 2023. The trademark is classified under Class 7 (Machinery), Class 9 (Computers & Electronics), Class 37 (Building & Construction), Class 42 (Computer & Scientific). The application is currently registered and active.

Owner Contact Info

Hitachi Energy Ltd (34 trademarks)

Brown-Boveri-Str. 5

Entity Type: 99

Hitachi Energy Switzerland AG

Bruggerstr. 72

Entity Type: 25

Trademark Details

Filing Date

June 2, 2023

Registration Date

April 1, 2025

Published for Opposition

October 29, 2024

Goods & Services

Apparatus and instruments for conducting, switching, converting, storing, regulating or controlling the distribution or use of electricity and energy, namely electrical conductors, electrical switches, electric power converters, electrical accumulators, electrical capacitors, electrical resistances; photovoltaic cells for generating electricity; solar cells; circuit breakers and high-voltage, medium-voltage and low-voltage power switching installations; electrical distribution cabinets being electrical power distribution units; electric switching installations; high-voltage direct current converters; electric current rectifiers; power current inverters; control devices and apparatus for network controlling and switching, namely, gateway routers, network routers, computer network bridges, modems, wireless access points devices being computer hardware, network telecommunication cables, line drivers being motives, computer network switches, computer network hubs and wireless network repeaters; current transformers; electric cables and electric cable lines being electric cables; electronic performance measuring devices, for measuring electric current; electronic torque measuring equipment; electronic devices for measuring electric current load; downloadable and recorded computer software for computers for controlling smart grids; downloadable and recorded networking software for performing communication and networking tasks; downloadable and recorded artificial intelligence and machine learning software for controlling smart grids

Installation, assembly, servicing and repair of machinery and products and equipment in the nature of computer hardware for energy production, transport and distribution; Installation, assembly, servicing and repair of machinery and computer hardware for electrical engineering; Installation, assembly, servicing and repair of machinery and computer hardware for manufacturing electronics ; Installation, assembly, servicing and repair of machinery and computer hardware for computing and mechanical construction; laying of cables; pipeline construction and maintenance; installation, servicing and maintenance of energy converters, power plants, wave energy converters and wave energy power plants; installation, construction, servicing, maintenance and maintenance of electricity and energy generating installations and equipment; installation, servicing and maintenance of solar energy installations for producing electricity; underwater construction

Scientific and industrial research in the field of products, services and solutions for the energy sector; engineering services in the field of energy efficiency, namely, engineering advice with respect to energy saving; computer software development; engineering work, namely, engineering advisory services, in the nature of advice on technical safety; planning and design of energy generating installations; engineering services, namely, technical project planning and related advice in the field of electrical engineering; rental of computer equipment in the nature of computer hardware and computer software for managing electrical systems; engineering services in the field of products, services and solutions for the energy sector, with a particular focus on electrical infrastructure; engineering services in the field of electrical infrastructure for the energy sector

Installations and equipment for power generation, namely, energy production apparatus for power stations with gas and steam turbines, other than for land vehicles, wind and hydroelectric installations in the nature wind turbines and hydroelectric generators, solar installations in the nature of solar-powered electricity generators, and components and parts for the aforementioned installations; machines and machine tools for the production and distribution of energy, namely, electrical generators and electric motors for electric generators; electricity generators; generators for wind turbines; solar-powered electricity generators; turbocompressors; pumps for machines; air compressors; wind powered electricity generators; automation systems for oil and gas installations, namely, cleaning units in the nature of cleaning machines for oil and gas pipelines

Filing History

FINAL DECISION TRANSACTION PROCESSED BY IB
Nov 22, 2025 FINO
GENERIC MADRID TRANSACTION SENT TO IB
Oct 10, 2025 XXSS
GENERIC MADRID TRANSACTION CREATED
Oct 10, 2025 XXCR
TEAS CHANGE OF CORRESPONDENCE RECEIVED
Sep 11, 2025 TCCA
ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
Sep 11, 2025 ARAA
TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Sep 11, 2025 REAP
TEAS CHANGE OF CORRESPONDENCE RECEIVED
Sep 11, 2025 TCCA
ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
Sep 11, 2025 ARAA
TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Sep 11, 2025 REAP
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Jul 1, 2025 FICR
NOTICE OF REGISTRATION CONFIRMATION EMAILED
Apr 1, 2025 NRCC
REGISTERED-PRINCIPAL REGISTER
Apr 1, 2025 R.PR
NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Mar 29, 2025 OPNX
POST PUBLICATION AMENDMENT - ENTERED
Mar 17, 2025 CHPB
ASSIGNED TO PETITION STAFF
Mar 17, 2025 APET
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Mar 11, 2025 OPNS
NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Mar 11, 2025 OPNR
EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED
Mar 9, 2025 ETOP
TEAS POST PUBLICATION AMENDMENT RECEIVED
Feb 11, 2025 EPPA
EXTENSION OF TIME TO OPPOSE RECEIVED
Nov 26, 2024 ETOF
NEW REPRESENTATIVE AT IB RECEIVED
Nov 1, 2024 NREP
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Oct 29, 2024 NPUB
PUBLISHED FOR OPPOSITION
Oct 29, 2024 PUBO
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Oct 9, 2024 NONP
APPROVED FOR PUB - PRINCIPAL REGISTER
Sep 23, 2024 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Sep 22, 2024 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 22, 2024 CRFA
TEAS REQUEST FOR RECONSIDERATION RECEIVED
Sep 22, 2024 ERFR
NOTIFICATION OF FINAL REFUSAL EMAILED
Sep 2, 2024 GNFN
FINAL REFUSAL E-MAILED
Sep 2, 2024 GNFR
FINAL REFUSAL WRITTEN
Sep 2, 2024 CNFR
TEAS/EMAIL CORRESPONDENCE ENTERED
Jul 24, 2024 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 23, 2024 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Jul 23, 2024 TROA
REFUSAL PROCESSED BY IB
Apr 16, 2024 RFNT
ASSIGNED TO EXAMINER
Mar 29, 2024 DOCK
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Mar 26, 2024 RFCS
REFUSAL PROCESSED BY MPU
Mar 26, 2024 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Mar 5, 2024 RFCR
NON-FINAL ACTION WRITTEN
Mar 4, 2024 CNRT
ASSIGNED TO EXAMINER
Feb 26, 2024 DOCK
CHANGE OF OWNER RECEIVED FROM IB
Dec 9, 2023 CHLD
APPLICATION FILING RECEIPT MAILED
Oct 17, 2023 MAFR
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Oct 13, 2023 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Oct 12, 2023 REPR