GPS 3D MODULAR
LIVE

Serial Number

98737361

Owner

GPS 3D Modular Solutions LLP

Attorney

Tara Reedy Sliva

Filing Date

Sep 6, 2024

Add to watchlist:

No watchlists yet
View on USPTO

GPS 3D MODULAR Trademark

Serial Number: 98737361

GPS 3D MODULAR is a trademark filed by GPS 3D Modular Solutions LLP on September 6, 2024. The trademark is classified under Class 6 (Metal Goods), Class 37 (Building & Construction), Class 40 (Treatment & Processing), Class 42 (Computer & Scientific), Class 17 (Rubber Goods), Class 19 (Building Materials). The application is currently pending registration.

Owner Contact Info

GPS 3D Modular Solutions LLP (3 trademarks)

128 City Road
London EC1V2NX , GB

Entity Type: 99

Trademark Details

Filing Date

September 6, 2024

Registration Date

Not Registered

Goods & Services

Building materials, namely, pre-cast concrete wall forms; concrete; concrete beams; concrete blocks; concrete floors; concrete panels; concrete piles; concrete prefabricated slabs; concrete slabs; concrete walls; panels of precast concrete for buildings; prefabricated houses that primarily are non-metal; fiberglass reinforced polymer rebar; prefabricated residential, commercial, industrial and institutional buildings that are primarily non-metal; prefabricated volumetric modular units that are primarily non-metal for use in the construction of residential, commercial, industrial and institutional buildings

Architectural consultancy services; architectural services; design, planning and engineering in the field of building construction; designing of prefabricated houses; electrical engineering; mechanical engineering; research in the field of building construction; structural engineering service

Advisory services relating to the construction of buildings; assembly of prefabricated houses; building construction services; construction of modular homes; construction project management services; construction, maintenance and repair of buildings; consultancy services relating to the construction of buildings; real estate development and construction of residential and commercial properties; construction of accommodations for on-site oil and gas workers; construction of containment units for the storage of oil, gas and effluent byproducts from oil and gas extraction; real estate development of residential, institutional and commercial properties; general building contractor services; plumbing services; construction project management in the field of building and infrastructure construction; providing advice and information in the field of environmentally sustainable building practices; construction of modular buildings

Metal reinforcing materials for concrete; steel rebars, rods, and mesh used for strengthening and reinforcing concrete structures

Custom manufacturing of modular units for residential, commercial, industrial and institutional buildings; custom production of volumetric three dimensional seamless monolithic modular precast concrete units for others; custom manufacturing of prefabricated houses

Polymeric synthetic fibers for reinforcing concrete

Filing History

NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED
Apr 29, 2026 GNS2
INQUIRY TO SUSPENSION E-MAILED
Apr 29, 2026 GNSI
SUSPENSION INQUIRY WRITTEN
Apr 29, 2026 CNSI
NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Aug 29, 2025 GNS3
LETTER OF SUSPENSION E-MAILED
Aug 29, 2025 GNSL
SUSPENSION LETTER WRITTEN
Aug 29, 2025 CNSL
TEAS/EMAIL CORRESPONDENCE ENTERED
Aug 28, 2025 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 28, 2025 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Aug 28, 2025 TROA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
Jun 2, 2025 GNRN
NON-FINAL ACTION E-MAILED
Jun 2, 2025 GNRT
NON-FINAL ACTION WRITTEN
Jun 2, 2025 CNRT
TEAS/EMAIL CORRESPONDENCE ENTERED
May 30, 2025 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
May 30, 2025 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
May 30, 2025 TROA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
Mar 18, 2025 GNRN
NON-FINAL ACTION E-MAILED
Mar 18, 2025 GNRT
NON-FINAL ACTION WRITTEN
Mar 18, 2025 CNRT
ASSIGNED TO EXAMINER
Mar 18, 2025 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Mar 17, 2025 NWOS
NEW APPLICATION ENTERED
Sep 6, 2024 NWAP