EJOWELD CFF
LIVE

Serial Number

79240166

Owner

EJOT SE & Co. KG

Attorney

KENNETH L. MITCHELL

Filing Date

May 29, 2018

Add to watchlist:

No watchlists yet
View on USPTO

EJOWELD CFF Trademark

Serial Number: 79240166 • Registration: 5841655

EJOWELD CFF is a trademark filed by EJOT SE & Co. KG on May 29, 2018. The trademark is classified under Class 6 (Metal Goods), Class 7 (Machinery), Class 42 (Computer & Scientific). The application is currently registered and active.

Owner Contact Info

EJOT SE & Co. KG

Astenbergstr. 21

Entity Type: 99

EJOT GmbH & Co. KG (19 trademarks)

Untere Bienhecke

Entity Type: 13

Trademark Details

Filing Date

May 29, 2018

Registration Date

August 27, 2019

Published for Opposition

June 11, 2019

Goods & Services

[ Mechanically operated feeding and setting apparatus for fastening and connection elements of metal and plastic, namely, for friction welding machines; electrically or pneumatically or electrically and pneumatically operated hand-held joining machines, namely, hand-held friction welding machines; fastening and connecting tools and equipment, namely, friction welding machines; fastener machines for inserting fasteners into components; fastener insertion machines; sorting machines; separating machines; conveying machines for fastening elements, conveying machines for connection elements; setting apparatus for fastening elements being parts of machines; joining machines; mechanically operated joining apparatus, namely, friction welding machines; friction welding apparatus, namely friction welding machines; screwdrivers, namely, power-operated machines for driving a fastening element into metal; joining apparatus, namely, electromotive drives, namely, electric screwdrivers and power-operated screwdrivers; tools being parts of machines, namely, hold down tools for use in friction welding ]

[ Research relating to industrial machinery; research in relation to mechanical engineering; research and development for others in the field of friction welding; industrial research in the field of friction welding; technological consultancy in the field of joining techniques and friction; scientific and industrial research in the field of joining lightweight materials and high strength materials together; research in the field of welding; research in relation to the computer-assisted automation of technical processes, conducting of technological analysis; engineering services for the analysis of machinery; process monitoring for quality assurance in the field of friction welding; consultation in the field of physics; consultancy services relating to quality control; application system testing consultancy; advisory services relating to design engineering; advisory services relating to man-machine interfaces for computer software; advisory services relating to product testing; advisory services relating to scientific research; advisory services relating to technological research; consultancy in the field of industrial technology; engineering consultancy services; professional consultancy relating to technology; technological consultancy relating to production efficiency; engineering consultancy services; consultancy relating to technological research in the field of joining techniques and welding technological advisory services relating to machine engineering analysis; technological consultation services; measurement evaluation services in the field of friction welding; technological consultancy in the field of spare parts management ]

common metals and their alloys; transportable buildings of metal; non-electrical cable and wires of common metal; ironmongery in the nature of small items of metal hardware, namely, screws, fastening and connection elements, in particular bolts, screws, nuts, of metal; connecting means, namely, screws, and screws for thin sheet-metal joints and metallic mass-produced parts of all kinds in the nature of [ nuts, ] rivets *;* [ , bolts, nails, counter supports, hinges, support sleeves, fittings, dowels, plates and load distribution discs; metal hinges; metal profile rails; ] fasteners of common metal; [ fixing anchors; cotter pins of metal; clips of metal for cables and pipes; fixing materials, namely, metal anchors, metal threaded fasteners, rivets of metal; fixing nails; metal fastening plates; metal shims; ] metal hold down bolts; connection elements for friction welding, namely, friction elements of metal, lightweight aluminum sheets, lightweight steel sheets, and high strength steel; fastening elements for friction welding, namely, metal, metal rivets [ and metal winged screws of metal; fastenings being holding devices, namely, winged screws of metal; hinges of metal for the fixing of pipes; fastenings being metal circlips; metal dowels; metal joints for pipes and tubes; metal connectors for pipes and tubes; metal cable junction sleeves; metal junction sleeves for nonelectric cables; metal connecting rods; metal joint connectors for rods ]

Filing History

PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Mar 14, 2026 INPR
NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
Jan 30, 2026 NA75
REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.
Jan 30, 2026 C75P
TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Jan 29, 2026 EROP
POST REGISTRATION ACTION MAILED - SEC. 71 & 15
Aug 21, 2025 PR75
TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Aug 15, 2025 EROP
POST REGISTRATION ACTION MAILED - SEC. 71 & 15
Jul 14, 2025 PR75
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jul 14, 2025 APRE
TEAS SECTION 71 & 15 RECEIVED
Apr 15, 2025 ES75
COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Aug 27, 2024 REM3
CHANGE OF NAME/ADDRESS REC'D FROM IB
Mar 24, 2023 ADCH
NEW REPRESENTATIVE AT IB RECEIVED
Feb 26, 2021 NREP
FINAL DECISION TRANSACTION PROCESSED BY IB
Jan 17, 2020 FINO
FINAL DISPOSITION NOTICE SENT TO IB
Dec 29, 2019 FICS
FINAL DISPOSITION PROCESSED
Dec 29, 2019 FIMP
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Nov 27, 2019 FICR
REGISTERED-PRINCIPAL REGISTER
Aug 27, 2019 R.PR
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jun 11, 2019 NPUB
PUBLISHED FOR OPPOSITION
Jun 11, 2019 PUBO
NOTIFICATION PROCESSED BY IB
Jun 7, 2019 GPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
May 22, 2019 OPNS
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
May 22, 2019 OP2R
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
May 22, 2019 NONP
APPROVED FOR PUB - PRINCIPAL REGISTER
May 7, 2019 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
May 6, 2019 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
May 6, 2019 CRFA
TEAS REQUEST FOR RECONSIDERATION RECEIVED
May 6, 2019 ERFR
NOTIFICATION OF FINAL REFUSAL EMAILED
Apr 3, 2019 GNFN
FINAL REFUSAL E-MAILED
Apr 3, 2019 GNFR
FINAL REFUSAL WRITTEN
Apr 3, 2019 CNFR
TEAS/EMAIL CORRESPONDENCE ENTERED
Mar 9, 2019 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 9, 2019 CRFA
ASSIGNED TO LIE
Mar 9, 2019 ALIE
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Mar 6, 2019 TROA
REFUSAL PROCESSED BY IB
Oct 13, 2018 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Sep 26, 2018 RFCS
REFUSAL PROCESSED BY MPU
Sep 26, 2018 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Sep 25, 2018 RFCR
NON-FINAL ACTION WRITTEN
Sep 24, 2018 CNRT
APPLICATION FILING RECEIPT MAILED
Sep 18, 2018 MAFR
ASSIGNED TO EXAMINER
Sep 17, 2018 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Sep 13, 2018 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Sep 6, 2018 REPR