DURASYSTEM
LIVE

Serial Number

79204204

Owner

Duravit Aktiengesellschaft

Attorney

Kenneth F. Florek

Filing Date

Nov 9, 2016

Add to watchlist:

No watchlists yet
View on USPTO

DURASYSTEM Trademark

Serial Number: 79204204 • Registration: 5388864

DURASYSTEM is a trademark filed by Duravit Aktiengesellschaft on November 9, 2016. The trademark is classified under Class 6 (Metal Goods), Class 11 (Environmental Control), Class 19 (Building Materials), Class 20 (Furniture). The application is currently registered and active.

Owner Contact Info

Duravit Aktiengesellschaft (60 trademarks)

Werderstraße 36

Entity Type: 03

Trademark Details

Filing Date

November 9, 2016

Registration Date

January 30, 2018

Published for Opposition

November 14, 2017

Goods & Services

Non-metallic building materials for assembly of sanitary installations, namely, plastic water tanks, plastic door frames, plastic filling valves, plastic flushing valves, foam insulation material and water-pipe valves, not of metal or plastic; rigid pipes, not of metal

[ Sanitary installations, namely, wash-hand basins and washstands; shelves for storage for wash-hand basins and washstands, and parts thereof, namely, ceramic bidets, toilets, urinals, bath tubs, shower trays, shower cubicles; taps and control fittings in the nature of shower control valves, * tub control valves, * ] faucets for water supply and sanitary installations; [ toilet seats; ] toilet cisterns; flushing apparatus for toilets; lavatory installations

[ Mirrored cabinets for bathrooms and washrooms; goods of wood or wood substitute materials for bathrooms and washrooms, namely, curtain rails, wall hooks, works of art; goods of plastics, namely, fittings for furniture, windows and doors for bathrooms and washrooms; fittings, not of metal, for furniture and sanitary installations for bathrooms and washrooms in the nature of furniture for bathrooms and washrooms; wall hooks, not of metal, for bathrooms and washrooms; towel dispensers, not of metal, fixed; bathroom furniture; bathroom mirrors ]

Metal pipes; metal building materials for assembly of sanitary installations and not part of those installations, namely, metal frames, metal pipe collars, metal caps for tubing ends and metal valves not being parts of machines or plumbing or heating and cooling installations, for manually controlling the flow of pipelines

Filing History

PARTIAL INVALIDATION PROCESSED BY THE IB
Oct 31, 2025 INNP
PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Sep 20, 2025 INPS
INVALIDATION PROCESSED
Sep 20, 2025 INPC
PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
May 18, 2025 INPR
NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Sep 18, 2024 NA71
REGISTERED - PARTIAL SEC 71 ACCEPTED
Sep 18, 2024 71.P
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Sep 16, 2024 APRE
TEAS SECTION 71 RECEIVED
Dec 21, 2023 ES71
INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE
Dec 7, 2018 INNA
PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Nov 28, 2018 INPR
FINAL DECISION TRANSACTION PROCESSED BY IB
Jun 15, 2018 FINO
FINAL DISPOSITION NOTICE SENT TO IB
May 3, 2018 FICS
FINAL DISPOSITION PROCESSED
May 3, 2018 FIMP
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Apr 30, 2018 FICR
CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED
Mar 28, 2018 CORR
CORRECTION UNDER SECTION 7 - PROCESSED
Mar 28, 2018 COC.
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Mar 28, 2018 APRE
CORRECTION TRANSACTION RECEIVED FROM IB
Feb 16, 2018 CRCV
REGISTERED-PRINCIPAL REGISTER
Jan 30, 2018 R.PR
PUBLISHED FOR OPPOSITION
Nov 14, 2017 PUBO
NOTICE OF PUBLICATION
Oct 25, 2017 NPUB
REFUSAL PROCESSED BY IB
Oct 13, 2017 RFNP
APPROVED FOR PUB - PRINCIPAL REGISTER
Oct 11, 2017 CNSA
AMENDMENT FROM APPLICANT ENTERED
Sep 20, 2017 ACEC
CORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 20, 2017 CRFA
PAPER RECEIVED
Sep 18, 2017 MAIL
CORRECTION SENT TO IB
Sep 6, 2017 CRSN
CORRECTION CREATED FOR IB
Sep 6, 2017 CRCR
NON-FINAL ACTION MAILED
Aug 7, 2017 CNRT
NON-FINAL ACTION WRITTEN
Aug 5, 2017 CNRT
AMENDMENT FROM APPLICANT ENTERED
Jul 12, 2017 ACEC
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 12, 2017 CRFA
ASSIGNED TO LIE
Jun 28, 2017 ALIE
PAPER RECEIVED
May 30, 2017 MAIL
REFUSAL PROCESSED BY IB
Apr 29, 2017 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Apr 10, 2017 RFCS
REFUSAL PROCESSED BY MPU
Apr 10, 2017 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Apr 8, 2017 RFCR
NON-FINAL ACTION WRITTEN
Apr 7, 2017 CNRT
APPLICATION FILING RECEIPT MAILED
Apr 7, 2017 MAFR
ASSIGNED TO EXAMINER
Apr 3, 2017 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Apr 3, 2017 NWOS
LIMITATION FROM ORIGINAL APPLICATION ENTERED
Mar 31, 2017 LIMI
SN ASSIGNED FOR SECT 66A APPL FROM IB
Mar 30, 2017 REPR