DOVER FLUIDS
DEAD

Add to watchlist:

No watchlists yet
View on USPTO

DOVER FLUIDS Trademark

Serial Number: 86211108

DOVER FLUIDS is a trademark filed by DELAWARE CAPITAL FORMATION, INC. on March 4, 2014. The trademark is classified under Class 6 (Metal Goods), Class 7 (Machinery), Class 9 (Computers & Electronics), Class 42 (Computer & Scientific). The application is currently no longer active.

Owner Contact Info

DELAWARE CAPITAL FORMATION, INC. (1,098 trademarks)

1403 FOULK ROAD, SUITE 102
WILMINGTON, DE 19803

Entity Type: 03

Trademark Details

Filing Date

March 4, 2014

Registration Date

Not Registered

Published for Opposition

August 5, 2014

Goods & Services

Automatic control valves and liquid level controllers; automatic pressure control machines; pressure relief valves for rail cars and fixed tanks; site flow indicators; pressure isolation rings; level indicators, level switches and level gauges; vacuum breaker, namely, a pressure relief valve for rail cars and fixed tanks; electronic controls used in liquid handling, liquid handling equipment, and vapor recovery equipment; electric adaptors and plugs; automatic valves; automatic gasoline dispensing nozzles not being parts of engines or machines and parts therefor, namely, swivels and breakaways; industrial control valves and electric actuators therefor for use in controlling discharge of materials from truck trailer tanks; automatic valves and control valves for regulating the flow of gases and liquids; automatic liquid level gauges, liquid level controls and liquid level alarms, all for tanks cars, trucks, barges and stationary and intermodal tanks; electronic components for industrial machinery, namely, indicators for use in monitoring load capacity of industrial machinery; air, gas vapor compressors

Machine parts in the nature of integral components to heat and maintain temperature in piping systems, namely, metal steam jacketing, vapor recovery fittings, namely, plates, cones and plugs, suction line strainers, all the above goods being made of metal; gear reducers; pressure relief valves, check valves and loading and unloading valves, being parts of machines, all composed of metal, for tank cars, trucks, barges and stationary and intermodal tanks; bypass valves, namely bypass valves for positive displacement pumps; machine parts, namely, lift assisters for manway covers; metal valve caps for machines; machines for cleaning surfaces using high pressure fluids; vehicle washing, waxing, drying and polishing machines; dispensing and praying of chemicals and cleaning solvents; pumps; mixers

Metal goods, namely, metal flanges, metal pipe couplings and joints, metal swivel joints, metal valves, metal hose and tube couplings; metal pipe fittings, metal pipes and connectors; metal manually operated check valves and butterfly valves, not being parts of machines; bottom loader assemblies, namely, metal pipes that connect a movable tank to a fixed storage tank or similar to allow for the transfer of fluids; tank car loading and unloading connections, namely, metal pipes and couplings; metal piping systems for transfer of chemicals comprising swivel joints, pipes, tubes, elbows, flanges, fluid couplings; loading and unloading fluid piping systems of metal comprising swivel joints, pipes, tubes, elbows, flanges, fluid couplings; metal slide sleeve loading arms; metal swivel hose connectors; metal coupling assemblies; metal drop tubes not being equipment for treating groundwater and soil; metal dust caps used as a component part of metal piping systems; metal ventilating ducts; non-automatic gasoline dispensing nozzles and parts therefor, namely, swivels and breakaways; high and low pressure and temperature metal sealing couplings and connectors; metal pipes, metal plugs and chains

Design and development of loading and coupling systems for loading and unloading of all types of critical hazardous fluids and hazardous bulk products; design and engineering of high-quality components used for clean energy fueling applications, such as CNG (compressed natural gas), Hydrogen and LPG (liquefied petroleum gas) on vehicles and dispensing systems; design of above ground fueling products and systems, namely, conventional, vacuum-assist, balance vapor recovery and manual dispensing nozzles, breakaways, hose swivels, and swivel breakaways; design of a wide array of below ground fueling products and systems, namely, integrated underground fuel transfer and containment systems, flexible coaxial primary pipe and fittings, tank and dispenser sumps and pans, remote fill sumps, special application sumps, quick connect dispenser sumps, spill containers, monitoring and fill pipe connection equipment, overfill prevention valves and emergency shut-off valves; design of automated fuel control systems and tank gauges

Filing History

ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILED
Nov 6, 2017 MAB6
ABANDONMENT - NO USE STATEMENT FILED
Nov 6, 2017 ABN6
NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Mar 28, 2017 EXRA
SOU EXTENSION 5 GRANTED
Mar 27, 2017 EX5G
SOU EXTENSION 5 FILED
Mar 20, 2017 EXT5
SOU TEAS EXTENSION RECEIVED
Mar 20, 2017 EEXT
NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Sep 23, 2016 EXRA
SOU EXTENSION 4 GRANTED
Sep 22, 2016 EX4G
SOU EXTENSION 4 FILED
Sep 21, 2016 EXT4
SOU TEAS EXTENSION RECEIVED
Sep 21, 2016 EEXT
TEAS CHANGE OF CORRESPONDENCE RECEIVED
Sep 21, 2016 TCCA
NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Mar 23, 2016 EXRA
SOU EXTENSION 3 GRANTED
Mar 22, 2016 EX3G
SOU EXTENSION 3 FILED
Mar 21, 2016 EXT3
SOU TEAS EXTENSION RECEIVED
Mar 21, 2016 EEXT
NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Oct 6, 2015 EXRA
SOU EXTENSION 2 GRANTED
Oct 3, 2015 EX2G
CASE ASSIGNED TO INTENT TO USE PARALEGAL
Oct 2, 2015 AITU
SOU EXTENSION 2 FILED
Sep 29, 2015 EXT2
SOU TEAS EXTENSION RECEIVED
Sep 29, 2015 EEXT
NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Apr 1, 2015 EXRA
SOU EXTENSION 1 GRANTED
Mar 30, 2015 EX1G
SOU EXTENSION 1 FILED
Mar 30, 2015 EXT1
SOU TEAS EXTENSION RECEIVED
Mar 30, 2015 EEXT
NOA E-MAILED - SOU REQUIRED FROM APPLICANT
Sep 30, 2014 NOAM
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Aug 5, 2014 NPUB
PUBLISHED FOR OPPOSITION
Aug 5, 2014 PUBO
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jul 16, 2014 NONP
LAW OFFICE PUBLICATION REVIEW COMPLETED
Jun 27, 2014 PREV
ASSIGNED TO LIE
Jun 27, 2014 ALIE
APPROVED FOR PUB - PRINCIPAL REGISTER
Jun 10, 2014 CNSA
EXAMINER'S AMENDMENT ENTERED
Jun 10, 2014 XAEC
NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Jun 10, 2014 GNEN
EXAMINERS AMENDMENT E-MAILED
Jun 10, 2014 GNEA
EXAMINERS AMENDMENT -WRITTEN
Jun 10, 2014 CNEA
ASSIGNED TO EXAMINER
Jun 7, 2014 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Mar 17, 2014 NWOS
NEW APPLICATION ENTERED
Mar 7, 2014 NWAP