DIBBLE ENGINEERING
LIVE

Serial Number

78973607

Owner

Dibble & Associates Consulting Engineers

Attorney

JENNIFER A. VAN KIRK

First Use Date

Jan 24, 2007

Filing Date

Sep 13, 2006

Add to watchlist:

No watchlists yet
View on USPTO

DIBBLE ENGINEERING Trademark

Serial Number: 78973607 • Registration: 3298142

DIBBLE ENGINEERING is a trademark filed by Dibble & Associates Consulting Engineers on September 13, 2006. The trademark is classified under Class 42 (Computer & Scientific). The application is currently registered and active.

Owner Contact Info

Dibble & Associates Consulting Engineers (2 trademarks)

Suite 300
Phoenix, AZ 85020

Entity Type: 03

Trademark Details

Filing Date

September 13, 2006

Registration Date

September 25, 2007

First Use Anywhere

January 24, 2007

First Use in Commerce

January 24, 2007

Published for Opposition

July 10, 2007

Goods & Services

Civil engineering and infrastructure planning services; Airport infrastructure services, namely location studies, airport master planning, inspection, design and construction surveys and design of runways, taxiways, parking aprons, t-hangars, grading, pavement rehabilitation, drainage, detention basins, street systems, parking facilities, utilities, fencing and security/access control systems, fuel storage, site infrastructure for airport terminals and building facilities; Drainage and flood control engineering services, namely design of detention/retention basins, open channels, river works, storm drains, drop structures, energy disipators, spillways, culvertss, scour and bank protection, dams; Drainage and flood control engineering services, namely area drainage master studies and plans, preliminary design, administration and inspection, design and construction surveys, flood insurance studies, drainage manuals, 404 permits/401 certification, floodplain delineations, FEMA CLOMR/LOMR, bridge scour analysis, hydrologic and hydraulic modeling and analysis, sediment transport, erosion and degradation studies, two-dimensional modeling and benefit-cost analysis, inundation studies, emergency action plans (EAP), flood damage and risk assessment, dambreak modeling and flood hazard mapping, floodplain delineation and mapping, stream navigability, erosion setback evaluation and mapping; Site infrastructure engineering services, namely fire protection supply, gas services, grading and drainage, master planning, water/sewer system modeling, municipal coordination/permits, NPDES/stormwater permits, off site improvements, retention/detention, traffic analysis, underground, at-grade and elevated parking and water/sewer services; Engineering survey services, namely control surveys, three dimensional imaging, topographic surveys, boundary surveys, right-of-way/easement surveys, global positioning surveys, photogrammetry control surveys, ALTA/ACSM surveys, construction staking, as-built surveys; Geographic information system services, namely asset inventory and management involving water and wastewater, storm drainage, water distribution, and gas pipeline systems, data collection and conversion, street centerlines, database design, development, and management, VB/VBA programming and avenue scripting, web development, data deployment, maintenance, and management, integration of water distribution systems into GIS, integration of sanitary sewer systems into GIS, integration of storm drainage systems into GIS, fire hazard evaluation and mapping; Transportation engineering services, namely major street design, highway location studies, highway design concept reports, highway/freeway design, street systems, sidewalk improvements, roadway signing/striping design, traffic impact analysis, traffic interchange design, traffic control plans, drainage analysis and design, right-of-way analysis and plans, legal descriptions and exhibits, utility design and relocations, construction administration/inspection, quality assurance/quality control, constructability reviews, comprehensive project management, partnering/teamwork leadership, public involvement, agency coordination, English and metric capabilities, parks and trails, utility and agency coordination; Water resource engineering services, namely transmission/distribution main design, booster pump station design, reservoir design, well design, pipeline rehabilitation, water system appraisals, water and sewer master planning, sanitary sewer main design, lift station design, effluent reuse/reclaimed pipelines, water/waste water treatment, irrigation delivery systems, gas pipeline design, infrastructure rehabilitation, agency coordination, phased implementation planning and public involvement programs

Filing History

NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED
Oct 5, 2017 NA89
REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)
Oct 5, 2017 RNL1
REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED
Oct 5, 2017 89AG
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Oct 5, 2017 APRE
TEAS SECTION 8 & 9 RECEIVED
Sep 1, 2017 E89R
APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Jul 12, 2017 CHAN
TEAS CHANGE OF OWNER ADDRESS RECEIVED
Jul 12, 2017 COAR
COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Sep 25, 2016 REM2
NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Sep 13, 2013 NA85
REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Sep 13, 2013 C15A
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Sep 13, 2013 APRE
REGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED
Aug 30, 2013 815F
TEAS SECTION 8 & 15 RECEIVED
Aug 30, 2013 E815
AMENDMENT UNDER SECTION 7 - PROCESSED
Jan 18, 2008 A7OK
ASSIGNED TO PARALEGAL
Dec 12, 2007 PLGL
SEC 7 REQUEST FILED
Nov 7, 2007 AMD7
PAPER RECEIVED
Nov 7, 2007 MAIL
REGISTERED-PRINCIPAL REGISTER
Sep 25, 2007 R.PR
PUBLISHED FOR OPPOSITION
Jul 10, 2007 PUBO
NOTICE OF PUBLICATION
Jun 20, 2007 NPUB
LAW OFFICE PUBLICATION REVIEW COMPLETED
Apr 30, 2007 PREV
APPROVED FOR PUB - PRINCIPAL REGISTER
Apr 24, 2007 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Apr 23, 2007 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 23, 2007 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Apr 20, 2007 TROA
USE AMENDMENT ACCEPTED
Apr 18, 2007 IUAA
TEAS/EMAIL CORRESPONDENCE ENTERED
Apr 17, 2007 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 17, 2007 CRFA
AMENDMENT TO USE PROCESSING COMPLETE
Apr 17, 2007 AUPC
ASSIGNED TO LIE
Apr 17, 2007 ALIE
USE AMENDMENT FILED
Mar 23, 2007 IUAF
TEAS AMENDMENT OF USE RECEIVED
Mar 23, 2007 EAAU
NON-FINAL ACTION E-MAILED
Mar 7, 2007 GNRT
NON-FINAL ACTION WRITTEN
Mar 7, 2007 CNRT
TEAS/EMAIL CORRESPONDENCE ENTERED
Mar 3, 2007 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 2, 2007 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Mar 2, 2007 TROA
NON-FINAL ACTION E-MAILED
Feb 9, 2007 GNRT
NON-FINAL ACTION WRITTEN
Feb 9, 2007 CNRT
ASSIGNED TO EXAMINER
Feb 5, 2007 DOCK
NEW APPLICATION ENTERED
Sep 19, 2006 NWAP