DEFENCELL
LIVE

Serial Number

77069732

Owner

Terram Limited

Attorney

April L. Besl

Filing Date

Dec 21, 2006

Add to watchlist:

No watchlists yet
View on USPTO

DEFENCELL Trademark

Serial Number: 77069732 • Registration: 3756420

DEFENCELL is a trademark filed by Terram Limited on December 21, 2006. The trademark is classified under Class 6 (Metal Goods), Class 37 (Building & Construction), Class 42 (Computer & Scientific), Class 45 (Legal & Security Services), Class 17 (Rubber Goods), Class 19 (Building Materials), Class 22 (Cordage), Class 24 (Fabrics). The application is currently registered and active.

Owner Contact Info

Terram Limited (2 trademarks)

Mamhilad, Pontypool
Gwent NP40YR , GB

Entity Type: 03

J & S Franklin Ltd. (2 trademarks)

Franklin House
LONDON UNITED KINGDOM WC2R 1HL , GB

Entity Type: 03

FIBERWEB GEOSYNTHETICS LIMITED (7 trademarks)

211-217 LOWER RICHMOND ROAD
RICHMOND UPON THAMES, LONDON TW9 4LN , GB

Entity Type: 11

Trademark Details

Filing Date

December 21, 2006

Registration Date

March 9, 2010

Published for Opposition

April 21, 2009

Goods & Services

Non-metallic building materials, NAMELY, NON-METALLIC BUILDING PANELS, NON-METALLIC ROOFING, NON-METALLIC decking boards, NON-METALLIC CEILING PANELS, NON-METALLIC DOOR AND WINDOW FRAMES AND CASINGS, NON-METALLIC BOARDS FOR FLOORING, NON-METALLIC BEAMS, GIRDERS AND JOISTS, NON-METALLIC SHEETS AND PLATES; geotextile materials, NAMELY, GEOTEXTILE FABRIC AND SHEETING FOR BUILDING, CONSTRUCTION, CIVIL ENGINEERING, DRAINAGE, EROSION, SOIL CONTROL AND LANDSCAPING; non-metallic materials, NAMELY, NON-METALLIC PANELS, NON-METALLIC BEAMS, GIRDERS AND JOISTS, NON-METALLIC SHEETS AND PLATES; non-metallic structural materials, NAMELY, NON-METALLIC FRAMEWORKS FOR BUILDINGS, WALLS, SLOPES AND RIVERBANKS, NON-METALLIC REINFORCING MATERIALS FOR BUILDINGS, WALLS, SLOPES AND RIVERBANKS, NON-METALLIC CEILING SUPPORTS, NON-METALLIC FLOORING SUPPORTS, NON-METALLIC ROOFING SUPPORTS, NON-METALLIC BUILDING LININGS, NON-METALLIC BUILDING WALL CLADDING; non-metallic structures and NON-METALLIC MULTI-COMPARTMENTAL STRUCTURES for holding sand, earth, mud, stones, building rubble, concrete and/or snow used for forming barrier or defense walls; geotextile structures for holding sand, earth, mud, stones, building rubble, concrete and/or snow used for forming barrier or defense walls; non-metallic cage structures and non-metallic multi-compartmental structures for forming bastions and gabions; plastic structures for holding sand, earth, mud, stones, building rubble, concrete and/or snow used for forming barrier or defense walls; GEOTEXTILES FOR USE IN CONNECTION WITH PUBLIC WORKS CONSTRUCTION, MILITARY DEFENSE CONSTRUCTION, SOIL STABILIZATION AND FLOOD DEFENSE CONSTRUCTION

Metallic building materials, NAMELY, METAL BUILDING PANELS, METAL ROOFING, Metal decking boards, METAL CEILING PANELS, METAL DOOR AND WINDOW FRAMES AND CASINGS, METAL BOARDS FOR FLOORING, METAL BEAMS, GIRDERS AND JOISTS, METAL SHEETS AND PLATES; metallic materials for civil engineering, drainage, erosion, soil control and landscaping purposes, NAMELY, METAL PANELS, METAL BEAMS, GIRDERS AND JOISTS, METAL SHEETS AND PLATES; structural materials made from metal, NAMELY, FRAMEWORKS OF METAL FOR BUILDINGS, WALLS, SLOPES AND RIVERBANKS, REINFORCING MATERIALS OF METAL FOR BUILDINGS, WALLS, SLOPES AND RIVERBANKS, METAL CEILING SUPPORTS, METAL FLOORING SUPPORTS, METAL ROOFING SUPPORTS, BUILDING LININGS OF METAL, BUILDING WALL CLADDING OF METAL; metallic cages STRUCTURES and METALLIC MULTI-COMPARTMENTAL STRUCTURES for holding sand, earth, mud, stones, building rubble, concrete and/or snow used for forming barrier or defense walls; metallic multi-compartmental structures for forming bastions and gabions

Plastics in extruded form FOR GENERAL INDUSTRIAL USE; plastics IN EXTRUDED FORM for agricultural, horticultural, and/or civil engineering use, NAMELY, CELLULAR PLASTIC SHEETS FOR SLOPE STABILIZATION AND/OR SOIL RETENTION; plastic sheets; plastic films; packing and stopping materials FOR FORMING SEALS; INSULATING MATERIALS, NAMELY, SHEETS OF PLASTIC FABRIC AND POLYURETHANE FOAM FOR USE IN BUILDING; fibers of plastic materials FOR USE IN BUILDING

building construction services; BUILDING maintenance and repair services; CONSTRUCTION project management; construction management; LAND DEVELOPMENT SERVICES, NAMELY, PLANNING AND LAYOUT OF RESIDENTIAL AND/OR COMMERCIAL COMMUNITIES, AND INSTALLATION OF IRRIGATION SYSTEMS; BUILDING CONSTRUCTION CONSULTANCY; CONSTRUCTION LANDSCAPING CONSULTANCY; new construction site development AND EARTHWORKS CONSULTANCY

NON-WOVEN MATERIALS, FABRICS AND SHEETS MADE FROM POLYPROPYLENE AND/OR POLYETHYLENE; NON-WOVEN MATERIALS, FABRICS AND SHEETS MADE FROM POLYPROPYLENE AND/OR POLYETHYLENE FOR USE AS COVERINGS OR LININGS FOR BASTION DEFENSE WALLS, GABIONS AND OTHER PROTECTIVE STRUCTURES

[ Security guard services for the protection of property and individuals ]

Synthetic textile fibers; fibers of plastics materials, NAMELY, NATURAL PLANT FIBERS FOR USE AS FILLER FOR PLASTIC COMPOUNDS THAT ARE USED IN THE FURTHER MANUFACTURE OF PLASTIC BUILDING MATERIALS

ENGINEERING; CIVIL ENGINEERING; STRUCTURAL ENGINEERING; GEO-TECHNICAL AND/OR ENVIRONMENT ENGINEERING

Filing History

ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
May 14, 2025 ASCK
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Jun 28, 2023 ASCK
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Feb 3, 2021 ASCK
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Jan 20, 2021 ASCK
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Sep 9, 2020 ASCK
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Aug 12, 2020 ASCK
NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED
May 21, 2020 NA89
REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)
May 21, 2020 RNL1
REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED
May 21, 2020 89AG
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
May 21, 2020 APRE
TEAS SECTION 8 & 9 RECEIVED
Mar 9, 2020 E89R
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Jan 15, 2020 ASCK
COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Mar 9, 2019 REM2
ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
Apr 5, 2018 ARAA
TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Apr 5, 2018 REAP
NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Aug 17, 2016 NA85
REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Aug 17, 2016 C15P
TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Aug 16, 2016 EROP
POST REGISTRATION ACTION MAILED - SEC. 8 & 15
Jul 13, 2016 PR23
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jul 13, 2016 APRE
TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Jun 8, 2016 EROP
POST REGISTRATION ACTION MAILED - SEC. 8 & 15
Mar 30, 2016 PR23
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Mar 30, 2016 APRE
TEAS SECTION 8 & 15 RECEIVED
Mar 9, 2016 E815
ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Dec 16, 2015 ASCK
AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
Jan 22, 2014 ASGN
REGISTERED-PRINCIPAL REGISTER
Mar 9, 2010 R.PR
1(B) BASIS DELETED; PROCEED TO REGISTRATION
Jan 28, 2010 DP1B
CASE ASSIGNED TO INTENT TO USE PARALEGAL
Jan 4, 2010 AITU
NOTICE OF ALLOWANCE CANCELLED
Dec 30, 2009 IUCN
TEAS DELETE 1(B) BASIS RECEIVED
Dec 30, 2009 D1BR
NOA MAILED - SOU REQUIRED FROM APPLICANT
Jul 14, 2009 NOAM
PUBLISHED FOR OPPOSITION
Apr 21, 2009 PUBO
NOTICE OF PUBLICATION
Apr 1, 2009 NPUB
LAW OFFICE PUBLICATION REVIEW COMPLETED
Mar 19, 2009 PREV
APPROVED FOR PUB - PRINCIPAL REGISTER
Mar 19, 2009 CNSA
EXAMINER'S AMENDMENT ENTERED
Mar 19, 2009 XAEC
NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Mar 19, 2009 GNEN
EXAMINERS AMENDMENT E-MAILED
Mar 19, 2009 GNEA
EXAMINERS AMENDMENT -WRITTEN
Mar 19, 2009 CNEA
PREVIOUS ALLOWANCE COUNT WITHDRAWN
Mar 19, 2009 ZZZX
WITHDRAWN FROM PUB - OG REVIEW QUERY
Mar 9, 2009 PBCR
LAW OFFICE PUBLICATION REVIEW COMPLETED
Feb 25, 2009 PREV
APPROVED FOR PUB - PRINCIPAL REGISTER
Feb 23, 2009 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Feb 10, 2009 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Feb 9, 2009 CRFA
TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED
Feb 9, 2009 ERSI
REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Oct 14, 2008 RCSC
REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Apr 14, 2008 RCSC
SUSPENSION CHECKED - TO ATTORNEY FOR ACTION
Apr 10, 2008 RCCK
ASSIGNED TO LIE
Apr 10, 2008 ALIE
NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Oct 10, 2007 GNS3
LETTER OF SUSPENSION E-MAILED
Oct 10, 2007 GNSL
SUSPENSION LETTER WRITTEN
Oct 10, 2007 CNSL
TEAS/EMAIL CORRESPONDENCE ENTERED
Oct 9, 2007 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 9, 2007 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Oct 9, 2007 TROA
NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Aug 13, 2007 GNS3
LETTER OF SUSPENSION E-MAILED
Aug 13, 2007 GNSL
SUSPENSION LETTER WRITTEN
Aug 13, 2007 CNSL
TEAS/EMAIL CORRESPONDENCE ENTERED
Jul 27, 2007 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 27, 2007 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Jul 27, 2007 TROA
NON-FINAL ACTION E-MAILED
Apr 16, 2007 GNRT
NON-FINAL ACTION WRITTEN
Apr 16, 2007 CNRT
ASSIGNED TO EXAMINER
Apr 16, 2007 DOCK
ASSIGNED TO LIE
Feb 23, 2007 ALIE
PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED
Jan 26, 2007 AMPX
TEAS VOLUNTARY AMENDMENT RECEIVED
Jan 26, 2007 PARI
NEW APPLICATION ENTERED
Dec 27, 2006 NWAP