CHELPIPE
DEAD

Serial Number

79230804

Owner

Joint-Stock Company "GRUPPA CHTPZ"

Filing Date

Oct 25, 2017

Add to watchlist:

No watchlists yet
View on USPTO

CHELPIPE Trademark

Serial Number: 79230804 • Registration: 5635211

CHELPIPE is a trademark filed by Joint-Stock Company "GRUPPA CHTPZ" on October 25, 2017. The trademark is classified under Class 1 (Chemicals), Class 6 (Metal Goods), Class 7 (Machinery), Class 9 (Computers & Electronics), Class 11 (Environmental Control), Class 37 (Building & Construction), Class 40 (Treatment & Processing), Class 42 (Computer & Scientific). The application is currently no longer active.

Owner Contact Info

Joint-Stock Company "GRUPPA CHTPZ" (4 trademarks)

Volgogradskij prospekt, dom 2,

Entity Type: 09

Trademark Details

Filing Date

October 25, 2017

Registration Date

December 25, 2018

Published for Opposition

October 9, 2018

Cancellation Date

July 11, 2025

Goods & Services

Metal tempering; metal treating; welding services; sandblasting services; millworking

Electric monitoring apparatus, namely, electronic tire pressure monitors

Mud catchers and collectors being machines; clack valves being parts of machines; taps being parts of machines, engines or motors; mixing machines; filtering machines; mixers being machines; pumps being machines; pumps being parts of machines, engines or motors; boiler tubes being parts of machines; lifting apparatus, namely, lifting installations for the transport of persons and goods; control mechanisms for machines, engines or motors, namely, thermostatic control valves for machines; elevating apparatus, namely, elevators

Fittings of metal for compressed air lines; tanks of metal; reservoirs of metal; bottles, namely, metal containers, for compressed gas or liquid air; preserving boxes of metal; preserve tins of metal; tin cans sold empty; casks of metal; barrels of metal; silos of metal; kits for making prefabricated houses of metal; chimneys of metal; containers of metal for storing acids; iron slabs; portable skating rink structures of metal; elbows of metal for pipes; manifolds of metal for pipelines; modular buildings of metal; buildings, transportable, of metal; portable steel buildings; masts of metal; pipe muffs of metal; props of metal; branching pipes of metal; platforms, prefabricated, of metal; collars of metal for fastening pipes; floating docks of metal, for mooring boats; containers of metal for liquid fuel; floating containers of metal for transport ; junctions of metal for pipes; posts of metal; pipework of metal; pipes of metal; tubes of metal; steel pipes; steel tubes; collars in the nature of flanges of metal

Drilling of wells; construction of athletic facilities; pipeline construction and maintenance

Brazing fluxes

Taps, cocks, and spigots, namely, faucets, for pipes; faucets for pipes; plumbing fittings, namely, pipe line cocks and spigots

Engineering; scientific research; technological consultancy in the field of engineering; technical writing

Filing History

CANCELLED SECTION 71
Jul 11, 2025 C71T
COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Dec 25, 2023 REM3
CHANGE OF NAME/ADDRESS REC'D FROM IB
Apr 9, 2021 ADCH
FINAL DECISION TRANSACTION PROCESSED BY IB
Jun 1, 2019 FINO
GENERIC MADRID TRANSACTION SENT TO IB
Apr 6, 2019 XXSS
GENERIC MADRID TRANSACTION CREATED
Apr 6, 2019 XXCR
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Mar 25, 2019 FICR
REGISTERED-PRINCIPAL REGISTER
Dec 25, 2018 R.PR
PUBLISHED FOR OPPOSITION
Oct 9, 2018 PUBO
NOTIFICATION PROCESSED BY IB
Oct 6, 2018 GPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Sep 19, 2018 OPNS
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Sep 19, 2018 OP2R
NOTICE OF PUBLICATION
Sep 19, 2018 NPUB
APPROVED FOR PUB - PRINCIPAL REGISTER
Sep 1, 2018 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Aug 31, 2018 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 31, 2018 CRFA
ASSIGNED TO LIE
Aug 30, 2018 ALIE
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Aug 15, 2018 TROA
REFUSAL PROCESSED BY IB
May 25, 2018 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
May 9, 2018 RFCS
REFUSAL PROCESSED BY MPU
May 9, 2018 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
May 6, 2018 RFCR
NON-FINAL ACTION WRITTEN
May 5, 2018 CNRT
APPLICATION FILING RECEIPT MAILED
May 1, 2018 MAFR
ASSIGNED TO EXAMINER
Apr 27, 2018 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Apr 27, 2018 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
Apr 26, 2018 REPR