CERASYSTEM
LIVE

Serial Number

86226159

Owner

CERA SYSTEM Verschleißschutz GmbH

Attorney

Jeanne Hamburg

Filing Date

Mar 19, 2014

Add to watchlist:

No watchlists yet
View on USPTO

CERASYSTEM Trademark

Serial Number: 86226159 • Registration: 4872693

CERASYSTEM is a trademark filed by CERA SYSTEM Verschleißschutz GmbH on March 19, 2014. The trademark is classified under Class 6 (Metal Goods), Class 7 (Machinery), Class 9 (Computers & Electronics), Class 11 (Environmental Control), Class 17 (Rubber Goods), Class 19 (Building Materials). The application is currently registered and active.

Owner Contact Info

CERA SYSTEM Verschleißschutz GmbH

Hermsdorf 07629 , DE

Entity Type: 99

Trademark Details

Filing Date

March 19, 2014

Registration Date

December 22, 2015

Published for Opposition

July 21, 2015

Goods & Services

[ Capillary tubes; electrical lines; jet pipes for fire-fighting purposes; self-regulating fuel pumps ]

[ Branching pipes, not made of metal; drainage pipes, not made of metal; ] [ flap valves for drainage pipes, not made of metal or plastic material; ] [ pipes made of sandstone; rigid pipes for construction purposes, not made of metal; ] [ construction materials, not made of metal, namely, specify items; ] [ water pipes, not made of metal; ceramic drain pipes ]

[ Gas-operated soldering irons; machine parts, namely, grindstones and grinding gears; electric flour mills; metal and non-metal gaskets for vehicles; engine injectors; suction jet pumps; compressed air pumps for garages; electric pumps for heating systems; pumps for machines; pump diaphragms; lubricating pumps; vacuum pumps; centrifugal pumps; conveyors; conveyor belts; pneumatic tube conveyors; conveyor machines; machine couplings and transmissions, except for land vehicles; drive chains other than for land vehicles; asphalt paving machines; power drills; gaskets for internal combustion engines; earth movers, namely, bulldozers; compressors for machines; pumps for machines; road construction equipment, namely, concrete construction machines; ] valves as machine components [; transport belts, namely, conveyor belts; transport tubes, namely, pneumatic tube conveyors ]

[ Branch pipes made of metal; connecting pipes made of metal; ] [ fastening lugs made of metal for cables and pipes; ] [ drainage pipes made of metal; flap valves made of metal for drainage pipes; pipes made of metal; ] steel pipes [; steel tubes; ] [ central heating pipes made of metal ]

[ Gasket seals for expansion joints, for industrial use; sealant compounds for expansion joints; sealing, packing and insulating material; adhesive sealant and caulking compound; non-metal sealing rings for use as connection seals; weather-stripping sealants in the nature of caulk; rubber seals for glass containers; pipe joint sealant; water-proof seals ] [; non-metal cylinder gaskets for industrial use; raw or semi-worked gutta-percha, rubber, asbestos, and mica; caoutchouc for industrial use; flexible tubes of plastic; flexible tubes of plastic with ceramic additives; fiberglass for insulation; latex with ceramic additives for industrial use; caoutchouc with ceramic additives for industrial use; rings of rubber for use as pipe connection seals; non-metal seals for brass pipe connections; rubber threads, not for textile purposes; chemical fibers, not for textile purposes; fireproof insulating material made of aramid, glass, carbon or ceramic fibers; woven insulating fabric; insulating material; semi-processed resins; synthetic plastic as semi-finished products in the form of tubes ]

[ Burn-off pipes for the crude oil industry; boilers with boiler tubes; fittings for equipment boilers, namely, elbows and nipples; pipes for heating boilers ]

Filing History

NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED
Sep 6, 2025 NA89
REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)
Sep 6, 2025 RNL1
REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED
Sep 6, 2025 89AG
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Sep 6, 2025 APRE
TEAS SECTION 8 & 9 RECEIVED
May 5, 2025 E89R
COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Dec 22, 2024 REM2
NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Nov 9, 2021 NA85
REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Nov 9, 2021 C15P
TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Nov 3, 2021 EROP
PROOF OF USE INTERIM ACTION ISSUED
Nov 1, 2021 PUMI
TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Oct 26, 2021 EROP
OFFICE ACTION ISSUED POU1
May 21, 2021 PUM1
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
May 20, 2021 APRE
TEAS SECTION 8 & 15 RECEIVED
Apr 26, 2021 E815
COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Dec 22, 2020 REM1
TEAS CHANGE OF CORRESPONDENCE RECEIVED
Feb 6, 2020 TCCA
TEAS CHANGE OF CORRESPONDENCE RECEIVED
May 11, 2016 TCCA
REGISTERED-PRINCIPAL REGISTER
Dec 22, 2015 R.PR
1(B) BASIS DELETED; PROCEED TO REGISTRATION
Sep 28, 2015 DP1B
CASE ASSIGNED TO INTENT TO USE PARALEGAL
Sep 28, 2015 AITU
NOTICE OF ALLOWANCE CANCELLED
Sep 15, 2015 IUCN
TEAS DELETE 1(B) BASIS RECEIVED
Sep 15, 2015 D1BR
NOA E-MAILED - SOU REQUIRED FROM APPLICANT
Sep 15, 2015 NOAM
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jul 21, 2015 NPUB
PUBLISHED FOR OPPOSITION
Jul 21, 2015 PUBO
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jul 1, 2015 NONP
LAW OFFICE PUBLICATION REVIEW COMPLETED
Jun 17, 2015 PREV
APPROVED FOR PUB - PRINCIPAL REGISTER
Jun 17, 2015 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Jun 17, 2015 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 17, 2015 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Jun 17, 2015 TROA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
May 14, 2015 GNRN
NON-FINAL ACTION E-MAILED
May 14, 2015 GNRT
NON-FINAL ACTION WRITTEN
May 14, 2015 CNRT
PREVIOUS ALLOWANCE COUNT WITHDRAWN
May 14, 2015 ZZZX
WITHDRAWN FROM PUB - OG REVIEW QUERY
Jan 27, 2015 PBCR
LAW OFFICE PUBLICATION REVIEW COMPLETED
Jan 13, 2015 PREV
ASSIGNED TO LIE
Jan 12, 2015 ALIE
APPROVED FOR PUB - PRINCIPAL REGISTER
Dec 19, 2014 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Dec 17, 2014 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 16, 2014 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Dec 16, 2014 TROA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
Jun 30, 2014 GNRN
NON-FINAL ACTION E-MAILED
Jun 30, 2014 GNRT
NON-FINAL ACTION WRITTEN
Jun 30, 2014 CNRT
ASSIGNED TO EXAMINER
Jun 22, 2014 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Apr 8, 2014 NWOS
NEW APPLICATION ENTERED
Mar 22, 2014 NWAP