BERCO
LIVE

Serial Number

79396277

Owner

THYSSENKRUPP AG

Attorney

Duncan Stark

Filing Date

Dec 13, 2023

Add to watchlist:

No watchlists yet
View on USPTO

BERCO Trademark

Serial Number: 79396277

BERCO is a trademark filed by THYSSENKRUPP AG on December 13, 2023. The trademark is classified under Class 12 (Vehicles), Class 37 (Building & Construction). The application is currently pending registration.

Owner Contact Info

THYSSENKRUPP AG (166 trademarks)

THYSSENKRUPP ALLEE 1
ESSEN 45143 , DE

Entity Type: 25

Berco SpA (3 trademarks)

Via I Maggio, 237

Entity Type: 99

Trademark Details

Filing Date

December 13, 2023

Registration Date

Not Registered

Goods & Services

Chain transmissions for land vehicles; tracked vehicles, namely crawler machines, crawler-tracked loaders, excavators, cranes and bulldozers, water crawlers, floating cranes and mining forestry extraction machines; treads for vehicles, namely for crawler machines, crawler-tracked loaders, excavators, cranes and bulldozers, water crawlers, floating cranes and mining forestry extraction machines; chains for tractors; undercarriages for vehicles, namely for crawler machines, crawler-tracked loaders, excavators, cranes and bulldozers, water crawlers, floating cranes and mining forestry extraction machines; tracked vehicles, namely crawler machines, crawler-tracked loaders, excavators, cranes and bulldozers, water crawlers, floating cranes and mining forestry extraction machines; chain-driven vehicles, namely crawler machines, crawler-tracked loaders, excavators, cranes and bulldozers, water crawlers, floating cranes and mining forestry extraction machines; structural parts and spare structural parts, for use in relation to chain-driven vehicles, namely crawler machines, crawler-tracked loaders, excavators, cranes and bulldozers, water crawlers, floating cranes and mining forestry extraction machines; crawler track components, namely track chains, track groups, undercarriage components, track rollers, carrier rollers, idlers, drive sprockets, shoes; crawler track systems, namely for crawler machines, crawler-tracked loaders, excavators, cranes and bulldozers, water crawlers, floating cranes and mining forestry extraction machines; spare structural parts for use in relation to chain-driven vehicles and tracked vehicles, namely track chains, track groups, undercarriage components, track rollers, carrier rollers, idlers, drive sprockets, shoes; accessories and parts in the nature of bogie pins or other parts joining the undercarriage with the vehicle for use in relation totracked vehicles and chain-driven vehicles, namely crawler machines, crawler-tracked loaders, excavators, cranes and bulldozers, water crawlers, floating cranes and mining forestry extraction machines; preassembled track systems, namely for crawler machines, crawler-tracked loaders, excavators, cranes and bulldozers, water crawlers, floating cranes and mining forestry extraction machines.

Installation services and repair in connection with tracked vehicles, excavation machines and chain-driven earth moving and road making machines; mining extraction; maintenance of tracked vehicles, excavation machines, earth movers and chain-driven machines.

Filing History

NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Nov 7, 2025 OPNX
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Oct 22, 2025 OPNS
NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Oct 22, 2025 OPNR
SUSPENSION CHECKED - TO ATTORNEY FOR ACTION
Oct 16, 2025 RCCK
NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Apr 15, 2025 GNS3
LETTER OF SUSPENSION E-MAILED
Apr 15, 2025 GNSL
SUSPENSION LETTER WRITTEN
Apr 15, 2025 CNSL
TEAS/EMAIL CORRESPONDENCE ENTERED
Mar 7, 2025 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 7, 2025 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Mar 7, 2025 TROA
REFUSAL PROCESSED BY IB
Oct 7, 2024 RFNT
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Sep 12, 2024 RFCS
REFUSAL PROCESSED BY MPU
Sep 12, 2024 RFRR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Sep 11, 2024 RFCR
NON-FINAL ACTION WRITTEN
Aug 8, 2024 CNRT
NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW
Aug 7, 2024 RFWR
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jul 20, 2024 RFCR
NON-FINAL ACTION WRITTEN
Jul 19, 2024 CNRT
ASSIGNED TO EXAMINER
Jul 11, 2024 DOCK
APPLICATION FILING RECEIPT MAILED
May 24, 2024 MAFR
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
May 24, 2024 NWOS
SN ASSIGNED FOR SECT 66A APPL FROM IB
May 23, 2024 REPR