BARGE
LIVE

Serial Number

87610235

Owner

Barge, Waggoner, Sumner & Cannon, Inc.

Attorney

Robert L. Brewer

First Use Date

Jan 1, 2018

Filing Date

Sep 15, 2017

Add to watchlist:

No watchlists yet
View on USPTO

BARGE Trademark

Serial Number: 87610235 • Registration: 5740636

BARGE is a trademark filed by Barge, Waggoner, Sumner & Cannon, Inc. on September 15, 2017. The trademark is classified under Class 37 (Building & Construction), Class 42 (Computer & Scientific). The application is currently registered and active.

Owner Contact Info

Barge, Waggoner, Sumner & Cannon, Inc. (8 trademarks)

Suite 600
Nashville, TN 37201

Entity Type: 03

BARGE DESIGN SOLUTIONS, INC. (2 trademarks)

211 COMMERCE STREET
NASHVILLE, TN 37201

Entity Type: 03

Trademark Details

Filing Date

September 15, 2017

Registration Date

April 30, 2019

First Use Anywhere

January 1, 2018

First Use in Commerce

January 1, 2018

Published for Opposition

August 28, 2018

Goods & Services

Construction planning in the areas of airports, railroads, traffic systems, water drainage systems, water treatment systems, distribution and storage systems, wastewater collection and treatment systems, industrial waste treatment systems, solid waste facilities, decontamination and decommissioning systems, hazardous and toxic waste management systems, brown field reclamation and development, HVAC systems, plumbing and process piping systems, boiler systems, fire protection systems, energy management control systems, material handling systems, power distribution systems, lighting systems, fire alarm systems, communication wiring systems, instrumentation and process control systems, foundations, bridges, retaining structures, seismic designs, and special structures, municipal, commercial, institutional, industrial, educational, and residential buildings, sites and landscapes; and construction services, namely, project representation during construction phase, third party reviews, construction progress inspections, plan reviews, physical plant analysis, and facilities evaluation

Civil engineering services, namely, site planning and development, grading and storm drainage, utilities, traffic studies, industrial access roadways, rail spur coordination and design, water and wastewater infrastructure design and permitting for municipal and industrial clients, master plans, and rate studies; traffic and transportation engineering, namely, interstate highways, streets, interchanges, signalization, traffic impact studies, transportation planning, public transit planning, bicycle pedestrian facility design, aviation; environmental engineering, namely, industrial waste treatment, landfill, transfer stations and other solid waste facilities, hazardous and toxic waste management, environmental assessments, brownfield development, permitting; mechanical engineering, namely, HVAC systems, plumbing and process piping, boiler systems, fire protection systems, energy management control systems, conveying systems and material handling, dust collection systems; electrical engineering, namely, high voltage electric power systems engineering, lighting, fire alarms, communications wiring, instrumentation, process controls; structural engineering, namely, building superstructure and foundations, bridges, retaining structures, seismic design, special structures, crane runway systems; architectural services, for industrial, municipal, commercial, institutional, correctional, educational, and residential buildings including facilities evaluations and historic preservation; Design services in the field of controls engineering, instrumentation, automation and controls systems including programmable logic controllers, human-machine interfaces, and supervisory control and data acquisition (SCADA); providing on-line non-downloadable geographic information system software; information management, namely, data collection, application development, remote sensing; surveying services, namely, topographic surveying, property line, construction and GPS surveys, aerial survey ground control, infrastructure inventory, high definition surveys, existing building scanning services; planning services, namely, land use and transportation plans, zoning studies, comprehensive and neighborhood plans, economic strategies and industrial development programs, grant applications, housing and community development programs; and landscape architectural services, namely, site and landscape design, recreation master plans, land development

Filing History

NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Aug 21, 2025 NA85
REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Aug 21, 2025 C15A
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Aug 21, 2025 APRE
TEAS SECTION 8 & 15 RECEIVED
Apr 15, 2025 E815
TEAS CHANGE OF CORRESPONDENCE RECEIVED
Jan 29, 2025 TCCA
ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
Jan 29, 2025 ARAA
TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jan 29, 2025 REAP
COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Apr 30, 2024 REM1
APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Aug 18, 2021 CHAN
TEAS CHANGE OF CORRESPONDENCE RECEIVED
Aug 18, 2021 TCCA
TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS
Aug 18, 2021 EWAF
ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
Aug 18, 2021 ARAA
TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Aug 18, 2021 REAP
TEAS CHANGE OF OWNER ADDRESS RECEIVED
Aug 18, 2021 COAR
REGISTERED-PRINCIPAL REGISTER
Apr 30, 2019 R.PR
NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
Mar 26, 2019 SUNA
ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
Mar 25, 2019 CNPR
STATEMENT OF USE PROCESSING COMPLETE
Mar 25, 2019 SUPC
CASE ASSIGNED TO INTENT TO USE PARALEGAL
Mar 25, 2019 AITU
USE AMENDMENT FILED
Mar 7, 2019 IUAF
TEAS STATEMENT OF USE RECEIVED
Mar 7, 2019 EISU
NOA E-MAILED - SOU REQUIRED FROM APPLICANT
Oct 23, 2018 NOAM
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Aug 28, 2018 NPUB
PUBLISHED FOR OPPOSITION
Aug 28, 2018 PUBO
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Aug 8, 2018 NONP
APPROVED FOR PUB - PRINCIPAL REGISTER
Jul 18, 2018 CNSA
EXAMINER'S AMENDMENT ENTERED
Jul 18, 2018 XAEC
NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Jul 18, 2018 GNEN
EXAMINERS AMENDMENT E-MAILED
Jul 18, 2018 GNEA
EXAMINERS AMENDMENT -WRITTEN
Jul 18, 2018 CNEA
PREVIOUS ALLOWANCE COUNT WITHDRAWN
Jul 18, 2018 ZZZX
WITHDRAWN FROM PUB - OG REVIEW QUERY
Jul 10, 2018 PBCR
AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
Jun 27, 2018 ASGN
APPROVED FOR PUB - PRINCIPAL REGISTER
Jun 21, 2018 CNSA
TEAS/EMAIL CORRESPONDENCE ENTERED
Jun 20, 2018 TEME
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 20, 2018 CRFA
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Jun 20, 2018 TROA
NOTIFICATION OF NON-FINAL ACTION E-MAILED
Dec 20, 2017 GNRN
NON-FINAL ACTION E-MAILED
Dec 20, 2017 GNRT
NON-FINAL ACTION WRITTEN
Dec 20, 2017 CNRT
ASSIGNED TO EXAMINER
Dec 20, 2017 DOCK
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Sep 20, 2017 NWOS
NEW APPLICATION ENTERED
Sep 19, 2017 NWAP